Addendum 3 BDC02-26/27 Blue Spring - Restroom Replacement

Location: Florida
Posted: Oct 7, 2026
Due: Oct 13, 2026
Agency: State Government of Florida
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: BDC02-26/27
Publication URL: To access bid details, please log in.

October 7, 2026

NOTICE TO APPLICANTS

ADDENDUM NO. THREE (3)

Blue Spring State Park - Restroom Replacement

DEP BID NO. BDC02-26/27

TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.

NOTICE

It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.

_______________________________________

Signature of Contractor and Date

The following statements supersede & supplement the corresponding items in the specifications & drawings:

1. The plans call for a clear anodic finish, but the specified tubing sizes do not come in an anodized finish. Would we be able to provide them powder coated in an anodized silver color, using woven mesh material from EMS Supply instead?

Response: Contractor may use other aluminum option do not use powder coated steel.

2. What material are the benches in the changing rooms to be constructed of? The benches are identified as Fixture #19 on the fixture pages, which reference Sheet A-401; however, a material or description does not appear to be provided. Please clarify the required bench material and specifications.

Response: The bench is CMU block with concrete top.

3. The door schedule lists fiberglass doors in 16 gauge 'stained steel' frames while the details and specification call for hollow metal at 14 gauge. Please confirm the door and frame material, the frame gauge, and what is meant by 'stained steel'

Response: The doors are fiberglass-reinforced polymer doors installed in minimum 16-gauge Type 304 stainless-steel frames with a No. 4 satin finish. “Stained steel” was a typographical error and has been corrected to “stainless steel.” The previous 14-gauge hollow-metal frame reference does not apply and has been removed.

Revised Sheets:

4. PPG Aquapon is called out for interior floors on plans/finish schedule; however there is no information in the Architectural specifications (A-501) for fluid applied flooring, there is only a spec for Ceramic Tile – please clarify

Response: Epoxy flooring is required at the interior concrete floors. The drawings and specifications have been revised to provide a complete, seamless, slip-resistant, fluid-applied epoxy flooring system with an integral 6-inch-high cove base. PPG Aquapon WB is identified as the Basis of Design, subject to the manufacturer’s written confirmation that the selected system is suitable for horizontal concrete flooring in this application. A comparable complete resinous-flooring system approved by the Architect and FDEP may be provided.

Revised Sheets:

5. There are no gutters/downspouts shown on the building – please confirm this is accurate.

Response: Confirmed. Gutters and downspouts are not provided. Roof runoff will discharge at the building eaves onto the adjacent positive-drainage surfaces. Final grading shall direct runoff away from the building and prevent ponding adjacent to the foundation.

Revised Sheet:

6. Section 2/A-201 calls for the “West” wall to be waterproofed to 4” below grade. This elevation is labeled “South”. Please clarify which wall is being waterproofed and provide the extent of waterproofing on this wall and product to be used.

Response: The previous waterproofing note was associated with an earlier retaining-wall condition. Civil confirmed that the grading design uses slopes up to the building and walkway slabs and does not require retaining walls.

Accordingly, no exterior wall is required to receive below-grade waterproofing under this condition. The conflicting waterproofing note and the associated retaining-wall, form-liner, and waterproofing requirements have been removed.

Revised Sheets:

7. Door Type A has a 2/0 x 2/4 Cutout that is undefined on A302. Please clarify if this is a vision lite or other spec and what the placement/mounting height should be.

Response: The 2'-0" × 2'-4" opening in Door Type A is a factory-installed vision lite. The bottom of the glazing shall be located no more than 43 inches above the finished floor. The Basis of Design is a Special-Lite SL-17 Hybrid FRP Door with a vision lite or approved equal. The complete door and glazing assembly shall comply with applicable safety-glazing and accessibility requirements.

Revised Sheet:

8. The toilet compartments are called ceiling hung on the keynote and floor-and-ceiling attached in the specification and are given as Bobrick in one place and Ampco or Santana in the other. Please confirm the product and the mounting method. Please also confirm whether a second urinal screen is required for the second urinal and confirm the enclosure at the two accessible water closets.

Response: The toilet compartments shall be ceiling-hung, high-density solid-polymer compartments. Bobrick Sierra Series is the Basis of Design, consistent with the FDEP standard. Previous references to floor-and-ceiling-attached compartments and Ampco or Santana have been removed. Both accessible water closets are enclosed within ceiling-hung toilet compartments with outswinging doors, accessible hardware, and the required clearances. One wall-mounted Bobrick Sierra Series urinal screen is provided between the two urinals. A

second screen is not required because the outer urinal is located adjacent to the restroom side wall.

Revised Sheets:

enclosures.

9. Can you provide a detail for the louvers? In both the doors and the walls.

Response: Please see plans A-302for both louvers and door details.

10. Please clarify the finish floor elevations (F.F.E.). C-102 indicates 17.30 in the restrooms, 17.50 in the changing rooms & 18.30 in the chase. A-100 has 2 elevations in the restroom – 17.50 & 17.30?

Response:

The architectural drawings have been revised to coordinate with Civil Sheet C-102. The restroom finished-floor elevation remains EL. 17.30. Chase 103 and the Door 103 threshold are established at EL. 18.30, 1 foot above the restroom finished floor. The exterior concrete landing at Door 103 shall match the threshold elevation and slope away from the building in accordance with C-102.

Revised Sheets:

11. The answer to question #3 refers to sheet A401 for guardrail details, however the answers to #1, 12 & 18 indicate that the gravity wall on which the guardrail sits is being eliminated. Please clarify if any guardrail is still being planned for this project and, if so, where? (Referring to Addendum #2)

Response: No, there are no guardrails in the project.

12. Is the FDOT Guardrail depicted on Sheet C501 being used anywhere in this project? (Referring to Addendum #2)

Response: No, there are no guardrails in the project.

In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Commodity Codes
Code Title
72121100 Commercial and office building construction services
72121101 Commercial and office building new construction service
72121400 Specialized public building construction services
72141120 Sewer line construction service
72141122 Electric power line construction service
72141125 Pumping station construction service
72141126 Underground utilities construction service
72141205 Drainage system construction service
72141510 Demolition services
72151100 Plumbing construction services
72151101 Septic system construction service
72151201 HVAC mechanical construction service
72151500 Electrical system services
72151502 Electric power system construction service
72151900 Masonry and stonework services
72151901 Foundation building service
72153609 Domestic or commercial appliance installation service
95121641 Pumping station
95121642 Sewage pumping station
95121700 Public buildings and structures
Contact Information
Name Logan Lee-Marple
Email logan.leemarple@floridadep.gov
Phone (850) 245-2519
Address 3800 Common Wealth Blvd Tallahassee FL 32399-3000
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Advertisement Detail Department of Transportation Agency Decisions AutoDesk Civil 3D Maintenance...

State Government of Florida

Bid Due: 10/11/2090

...Project: Northwest Connector Corridor- Tharpe Street Civil Engineering Design Services Ref...

City of Tallahassee

Bid Due: 10/29/2026

...Project: Northwest Connector Corridor- Tharpe Street Civil Engineering Design Services Ref...

City of Tallahassee

Bid Due: 10/29/2026

...Lillian Garcia Title 2027 Continuing Service Contracts for Civil, Geotechnical, Structural Engineering... Statute, ...

Hillsborough County Public Schools

Bid Due: 11/06/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.