| Location: | Utah |
|---|---|
| Posted: | Apr 16, 2026 |
| Due: | May 7, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CR26060 |
| Publication URL: | To access bid details, please log in. |
Project Description: INVITATIONAL
Only invited contractors listed below are allowed to attend the mandatory meeting.
Big D, judd.bundy@big-d.co
Caliber Contractor, office@calibercontractorut.com
New Wave Construction, ben@newwaveconstruction.com
PRT Builders, rob@prtbuilders.com
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the referenced project:
Project Description: New metal panel façade installed on existing framing with new structural connections (REF. AE205, AE510, AE511, SW501) New metal panel soffit installed on existing framing (REF. AE510, AE511, SW501) Replacement of all cast stone elements identified in drawings or identified through inspections with new wall mounting as detailed in AE502/C5. Provide allowance for replacement of up to 10% of the 1,200 LF of cast stone header and sill profiles. Replace delaminated cast stone header above window shown on AE206. Clean surface of all debris and adhere new header per manufacturers recommendation using dryvit systems inc., Primus adhesive or equivalent.
Construction Cost Estimate:$136,783.00

With GovernmentContracts, you can:
...MDT Questions Due Date: Jun 18th 2026, 1:00 PM MDT Contact Information: Aaron ...
State Government of Utah
Bid Due: 6/18/2026
...MDT Questions Due Date: Jun 17th 2026, 1:00 PM MDT Contact Information: Aaron ...
State Government of Utah
Bid Due: 6/24/2026
...PM MDT Contact Information: Aaron Stone, astone@saltlakecounty.gov Close Date: Jun 16th 2026, 1:00 ...
State Government of Utah
Bid Due: 6/16/2026
...hydrant, vinyl privacy fence, asphalt tie in to existing road, stone dust/crusher fines ...
State Government of Utah
Bid Due: 6/09/2026