Central Wastewater Treatment Plant Final Clarifier 3 Rebuild

Location: Texas
Posted: Sep 26, 2025
Due: Oct 23, 2025
Agency: State Government of Texas
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: RFB2025-073
Publication URL: To access bid details, please log in.
Central Wastewater Treatment Plant Final Clarifier 3 Rebuild
Solicitation ID:

RFB2025-073

Status:

Posted

Contact Name:

Chris Hanchard

Contact Number:

(254) 750-6640

Contact Email:

christopherh@wacotx.gov

Response Due Date:

10/23/2025

Response Due Time:

2:00 PM

Agency/Texas SmartBuy Member Number:

M1612

Posting Requirement:

21+ Days for Solicitation Notice

Solicitation Posting Date:

9/26/2025

Last Modified:

9/26/2025 2:05 am

Attachment URL: https://waco-texas.bonfirehub.com/opportunities/204063
Class/Item Code:

54549-Motors and Engines, Industrial, All Types, Not Automotive, Lawn or Marine, Including Parts and Accessories;
89087-Water Treatment Equipment (Not Otherwise Classified);
91319-Construction, Curb And Gutter (Includes Maintenance, Repair, And Removal);
91345-Construction, Sewer And Storm Drain;
91359-Construction And Upgrades, Wastewater Treatment Plant;
91391-Maintenance And Repair, Wastewater Treatment Plant;
91430-Concrete;
91438-Electrical;
91468-Plumbing;
92517-Civil Engineering;
93662-Pumps And Pump Accessories Maintenance And Repair;

Solicitation Description:

The selected contractor shall provide all labor, equipment, materials, appurtenances, and incidentals necessary to complete the demolition, removal, disposal, and installation work required to fully rebuild the Secondary Clarifier #3 at the Central Wastewater Treatment Plant in accordance with Evoqua specifications. The scope includes removing and replacing worn or damaged mechanical components which include center column, rake arms, nuts, bolts, other hardware, skimmers, gear box, motor, and large lower gear box previous purchased by the City of Waco from Evoqua and ensuring existing electrical and process water plumbing are returned to original functioning status. The contractor must perform all necessary adjustments to ensure the clarifier functions per manufacturer standards, coordinate inspection and startup testing with an Evoqua authorized representative (at the City of Waco’s cost), and ensure the unit passes all functionality tests. All work shall comply with applicable OSHA safety standards, municipal codes, and environmental regulations. At project close-out the contractor shall submit as-built drawings, a completion report, and provide a standard labor warranty. The project requires all site work, labor, equipment, and materials complete and inplace as stated in the RFB, shown on the plans, and specified herein.

General Contractor shall self-perform 51% of this project.

Liquidation Fee is $1,000.00 for each day of delay.

TxDot Qualifications are NOT Required for this project.

The City of Waco is seeking to have the work that is the subject of this RFB completed within 120CALENDAR DAYS , (Base Bid and All Alternates), from the date of the Notice to Proceed.

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...systems (fire) services, mechanical/plumbing engineering, project management for construction/design... the architecture and interior ...

Tarrant County College District

Bid Due: 6/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.