| Location: | Georgia |
|---|---|
| Posted: | Dec 12, 2025 |
| Due: | Jan 13, 2026 |
| Agency: | JUSTICE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 15BBNF26Q00000012 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Federal Bureau of Prisons (FBOP), FCI Jesup, is a federal correctional facility located at 2600 Highway 301 South, Jesup, GA 31599. The FBOP intends to award to a responsible entity for the provision of all labor, materials, and equipment necessary for tapping into the existing 12" Ductile Iron Water Main, reducing it to 6" pipe, to supply water to the new water softener system. Work includes excavating around an existing check valve vault to expose the 12-inch ductile iron water main, installing 12-inch valve onto the upstream side of the check valve, installing tie-ins for a 6-inch supply and a return on the 12-inch water main underground, penetrating through the metal building wall, and install a 6-inch line to the existing water softener system. See SOW and drawings for further details. All work must comply with local, state, and federal regulations. Full and Open Competition, no set-aside. Evaluation factors; Lowest Price Technically Acceptable (LPTA) and past performance. A Pre-Bid site visit will take place at FCI Jesup on Tuesday, January 6, 2026, at 9:00 am EST.

With GovernmentContracts, you can:
...SUPPLIES NIGP Codes Code Description 65846 Pipe, Iron, Including Ductile Iron Pipe and ...
State Government of Georgia
Bid Due: 6/18/2026
...Line 89044 Meters, Water 89003 Back Flow Preventers for Water and Sewer Pipe ...
State Government of Georgia
Bid Due: 6/18/2026
...FORT VALLEY WASTEWATER TREATMENT PLANT EFFLUENT PIPE CONSTRUCTION Fort Valley Utility Commission... Jun ...
State Government of Georgia
Bid Due: 7/03/2026
...magnetic flow meters (6- inch and 8-inch), one 6-inch and one 8-inch actuated ...
Forsyth County
Bid Due: 7/02/2026