| Location: | Minnesota |
|---|---|
| Posted: | Nov 17, 2025 |
| Due: | Dec 16, 2025 |
| Agency: | Metropolitan Airports Commission (MAC) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Solicitation098 |
| Publication URL: | To access bid details, please log in. |
Project Description: This work includes removal and replacement of existing roofing systems at Terminal 1. The work will also include the installation of sheet metal flashing, installation of anchors for fall protection including structural steel modifications, metal fabrication, and sealant install. Mechanical and electrical systems will be reconfigured to facilitate this scope of work and will include roof drains and piping, equipment removal and reinstall, and lightning protection.

With GovernmentContracts, you can:
...fabrication and installation of distinct wire mesh caging enclosures/partitions, to include... a mandatory ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
..., is provided to clarify the required fabrication. As noted in the attachment: ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...to fabrication. The purpose of this Amendment 0001 is to: Provide official Government ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...fabrication. As noted in the attachment: Straight red lines indicate wire mesh panels ...
DEPT OF DEFENSE
Bid Due: 6/12/2026