Emergency Bar Screen by Pass

Location: Florida
Posted: Apr 16, 2026
Due: May 14, 2026
Agency: City of Hollywood
Type of Government: State & Local
Category:
  • 25 - Vehicular Equipment Components
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.


Project ID:

Title: Emergency Bar Screen by Pass

Addenda: 0

Release Date: 4/16/2026

Due Date: 5/14/2026

Follow
Emergency Bar Screen by Pass
Public Utilities
15007 , 81500 , 82000 , 88500 , 89000 ... show all
Project ID: IFB-391-26-JJ
Release Date: Thursday, April 16, 2026
· Due Date: Thursday, May 14, 2026 3:00pm
Posted Thursday, April 16, 2026 2:47pm
All dates & times in Eastern Time
Draft Response Events RSVP No Bid27 days, 17 hours, 27 minutes


Post Information

Posted At:Thu, Apr 16, 2026 2:47 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The City of Hollywood is requesting proposals from qualified and experienced contractors to construct a new Emergency Bypass Bar Screen System at the Southern Regional Wastewater Treatment Plant (SRWWTP). This project aims to create a fully functional bypass that can handle up to 140 million gallons per day (MGD) during severe storm events or when the existing screening building must be taken offline for critical maintenance. The improvements will include installation of a new coarse bar screen structure, a 72‑inch FRP/GRP bypass pipeline, a new junction box, extensive utility relocations, site restoration, and related electrical and control upgrades.

This project is driven by multiple recent failures of the plant's existing bar screens, which have been damaged by large storm debris and level sensor malfunctions. These failures have forced the plant to operate unscreened during emergencies, sending debris-laden wastewater downstream and increasing the risk of equipment damage, operational downtime, and environmental non-compliance. The emergency bypass will provide a resilient, dedicated pathway that allows the City to maintain safe and continuous operations even under extreme conditions, while also enabling rehabilitation of aging infrastructure such as the existing 72‑inch influent pipe and screen building.

With preliminary construction components outlined in the Bid Form—including major utility work, deep excavation, FRP pipeline installation, bar screen construction, and restoration—the City seeks a contractor capable of executing complex wastewater infrastructure work in a congested, operational plant environment. This project represents a key investment in storm readiness, operational reliability, and long‑term asset management at one of the region’s most critical wastewater facilities.



Background
The City’s existing screening system has suffered multiple breakdowns in recent years, including clogging, damage from large debris, and sensor failures. In 2020–2022, storm events overwhelmed the bar screens, resulting in emergency bypassing, excessive downstream rag buildup, and significant operational strain.
Constructing this bypass poses several challenges: extensive underground electrical duct banks must be removed and replaced; multiple potable water, brine, sewer, and chlorine solution lines require temporary bypassing; and high groundwater conditions require specialized excavation and shoring methods. The bypass pipeline must remain out of service for long periods, making FRP/GRP piping essential due to its superior corrosion resistance compared with DIP or PCCP. Additionally, the bypass structure must fit within tight site constraints near the Eco Grande Golf Course interceptor box and integrate with the existing 72‑inch PCCP influent line.


Timeline

Release Project Date:
April 16, 2026
Pre-Proposal Meeting (Non-Mandatory):
April 27, 2026, 2:00pm
April 27, 2026, 2:00 pm
Southern Regional Wastewater Treatment Plant (SRWWTP)
Second Floor Conference
1621 N 14th Ave Bldg A
Hollywood, FL 33020
Question Submission Deadline:
May 7, 2026, 5:00am
Proposal Submission Deadline:
May 14, 2026, 3:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...includes comprehensive site preparation, the installation of a new groundwater well and irrigation ...

The City of Lauderhill, Florida

Bid Due: 6/08/2026

...underdrain system will be constructed to collect groundwater flow in the area. A ...

County of Lake

Bid Due: 6/25/2026

...underdrain system will be constructed to collect groundwater flow in the area. A ...

County of Lake

Bid Due: 6/25/2026

...groundwater conditions require specialized excavation and shoring methods. The bypass pipeline must remain...

City of Hollywood

Bid Due: 6/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.