Granville Bridge No. 107

Location: North Carolina
Posted: Jun 3, 2026
Due: Jun 24, 2026
Agency: Division of Highways
Type of Government: State & Local
Category:
  • 66 - Instruments and Laboratory Equipment
Publication URL: To access bid details, please log in.
  • DE00408
    POC
    Granville Bridge No. 107
  • Attachment Preview

    DE00408 Granville County
    STATE OF NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION
    HIGHWAY DIVISION 5
    PROPOSAL
    DATE AND TIME OF BID OPENING: June 24, 2026 AT 2:00 PM
    CONTRACT ID: DE00408
    WBS ELEMENT NO.: BP5.R103.3
    FEDERAL AID NO.: STATE FUNDED
    COUNTY: Granville County
    TIP NO.: N/A
    MILES: 0.085
    ROUTE NO.: SR 1303 (Graham Hobgood Road)
    LOCATION: Bridge No. 107 over North Fork Tar River
    TYPE OF WORK: Grading, Drainage, Paving, and Structure
    NOTICE:
    ALL BIDDERS SHALL COMPLY WITH ALL APPLICABLE LAWS REGULATING THE PRACTICE OF
    GENERAL CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE GENERAL STATUTES OF
    NORTH CAROLINA WHICH REQUIRES THE BIDDER TO BE LICENSED BY THE N.C. LICENSING
    BOARD FOR CONTRACTORS WHEN BIDDING ON ANY NON-FEDERAL AID PROJECT WHERE THE
    BID IS $40,000 OR MORE, EXCEPT FOR CERTAIN SPECIALTY WORK AS DETERMINED BY THE
    LICENSING BOARD. BIDDERS SHALL ALSO COMPLY WITH ALL OTHER APPLICABLE LAWS
    REGULATING THE PRACTICES OF ELECTRICAL, PLUMBING, HEATING AND AIR
    CONDITIONING AND REFRIGERATION CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE
    GENERAL STATUTES OF NORTH CAROLINA. NOTWITHSTANDING THESE LIMITATIONS ON
    BIDDING, THE BIDDER WHO IS AWARDED ANY FEDERAL - AID FUNDED PROJECT SHALL
    COMPLY WITH CHAPTER 87 OF THE GENERAL STATUTES OF NORTH CAROLINA FOR
    LICENSING REQUIREMENTS WITHIN 60 CALENDAR DAYS OF BID OPENING.
    THIS IS A STRUCTURE PROJECT. BID BOND IS REQUIRED.
    NAME OF BIDDER
    ADDRESS OF BIDDER

    DE00408 Granville County
    PROPOSAL FOR THE CONSTRUCTION OF
    CONTRACT No. DE00408 IN GRANVILLE COUNTY, NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION,
    RALEIGH, NORTH CAROLINA
    The Bidder has carefully examined the location of the proposed work to be known as Contract No. DE00408; has carefully
    examined the plans and specifications, which are acknowledged to be part of the proposal, the special provisions, the
    proposal, the form of contract, and the forms of contract payment bond and contract performance bond; and thoroughly
    understands the stipulations, requirements and provisions. The undersigned bidder agrees to bound upon his execution of
    the bid and subsequent award to him by the Department of Transportation in accordance with this proposal to provide the
    necessary contract payment bond and contract performance bond within fourteen days after the written notice of award is
    received by him. The undersigned Bidder further agrees to provide all necessary machinery, tools, labor, and other means
    of construction; and to do all the work and to furnish all materials, except as otherwise noted, necessary to perform and
    complete the said contract in accordance with the 2024 Standard Specifications for Roads and Structures by the dates(s)
    specified in the Project Special Provisions and in accordance with the requirements of the Engineer, and at the unit or lump
    sum prices, as the case may be, for the various items given on the sheets contained herein.
    The Bidder shall provide and furnish all the materials, machinery, implements, appliances and tools, and perform the work
    and required labor to construct and complete Contract No. DE00408 in Granville County, for the unit or lump sum prices,
    as the case may be, bid by the Bidder in his bid and according to the proposal, plans, and specifications prepared by said
    Department, which proposal, plans, and specifications show the details covering this project, and hereby become a part of
    this contract.
    The published volume entitled North Carolina Department of Transportation, Raleigh, Standard Specifications for Roads
    and Structures, January 2024 with all amendments and supplements thereto, is by reference incorporated into and made
    a part of this contract; that, except as herein modified, all the construction and work included in this contract is to be done
    in accordance with the specifications contained in said volume, and amendments and supplements thereto, under the
    direction of the Engineer.
    If the proposal is accepted and the award is made, the contract is valid only when signed either by the Contract Officer or
    such other person as may be designated by the Secretary to sign for the Department of Transportation. The conditions and
    provisions herein cannot be changed except over the signature of the said Contract Officer or Division Engineer.
    The quantities shown in the itemized proposal for the project are considered to be approximate only and are given as the
    basis for comparison of bids. The Department of Transportation may increase or decrease the quantity of any item or portion
    of the work as may be deemed necessary or expedient.
    An increase or decrease in the quantity of an item will not be regarded as sufficient ground for an increase or decrease in the
    unit prices, nor in the time allowed for the completion of the work, except as provided for the contract.
    Accompanying this bid is a bid bond secured by a corporate surety, or certified check payable to the order of the Department
    of Transportation, for five percent of the total bid price, which deposit is to be forfeited as liquidated damages in case this
    bid is accepted and the Bidder shall fail to provide the required payment and performance bonds with the Department of
    Transportation, under the condition of this proposal, within 14 calendar days after the written notice of award is received by
    him, as provided in the Standard Specifications; otherwise said deposit will be returned to the Bidder.

    DE00408 Granville County
    TABLE OF CONTENTS
    COVER SHEET
    PROPOSAL SHEET
    PROJECT SPECIAL PROVISIONS
    DIVISION LET PREQUALIFICATION: .................................................................................. G-1
    BOND REQUIREMENTS: ........................................................................................................ G-1
    HAUL ROADS: .......................................................................................................................... G-1
    CONTRACT TIME AND LIQUIDATED DAMAGES: ........................................................... G-1
    INTERMEDIATE CONTRACT TIME NUMBER (1) AND LIQUIDATED DAMAGES: ..... G-2
    PERMANENT VEGETATION ESTABLISHMENT:............................................................... G-2
    NO MAJOR CONTRACT ITEMS:............................................................................................ G-3
    SPECIALTY ITEMS: ................................................................................................................. G-3
    FUEL PRICE ADJUSTMENT: .................................................................................................. G-3
    SCHEDULE OF ESTIMATED COMPLETION PROGRESS: ................................................. G-5
    MINORITY BUSINESS ENTERPRISE AND WOMEN BUSINESS ENTERPRISE
    (DIVISIONS): ............................................................................................................................. G-5
    RESTRICTIONS ON ITS EQUIPMENT AND SERVICES: .................................................. G-20
    USE OF UNMANNED AIRCRAFT SYSTEM (UAS): .......................................................... G-21
    EQUIPMENT IDLING GUIDELINES: ................................................................................... G-21
    SUBSURFACE INFORMATION: ........................................................................................... G-22
    TWELVE MONTH GUARANTEE: ........................................................................................ G-22
    OUTSOURCING OUTSIDE THE USA: ................................................................................. G-22
    EROSION AND SEDIMENT CONTROL/STORMWATER CERTIFICATION: ................. G-23
    PROCEDURE FOR MONITORING BORROW PIT DISCHARGE: ..................................... G-28
    NOTE TO CONTRACTOR: .................................................................................................... G-30
    ROADWAY ............................................................................................................................... R-1
    STANDARD SPECIAL PROVISIONS
    AVAILABILITY OF FUNDS - TERMINATION OF CONTRACTS ..................................SSP-1
    NCDOT GENERAL SEED SPECIFICATION FOR SEED QUALITY ................................SSP-2
    ERRATA..................................................................................................................................SSP-5
    PLANT AND PEST QUARANTINES ...................................................................................SSP-8
    MINIMUM WAGES ...............................................................................................................SSP-9
    TITLE VI AND NONDISCRIMINATION: .........................................................................SSP-10
    ON-THE-JOB TRAINING ....................................................................................................SSP-19
    UNIT PROJECT SPECIAL PROVISIONS
    EROSION CONTROL ............................................................................................................. EC-1
    STRUCTURE/CULVERTS ......................................................................................................ST-1

    DE00408 Granville County
    PERMITS AND PROJECT COMMITMENTS ..................................................................... P-1
    FUEL USAGE FACTOR ADJUSTMENT FORM
    BID BOND
    BID FORM

    DE00408 Granville County
    INSTRUCTIONS TO BIDDERS
    PLEASE READ ALL INSTRUCTIONS CAREFULLY
    BEFORE PREPARING AND SUBMITTING YOUR BID.
    All bids shall be prepared and submitted in accordance with the following requirements.
    Failure to comply with any requirement may cause the bid to be considered irregular and
    may be grounds for rejection of the bid.
    For preparing and submitting the bid electronically, refer to Article 102-8(B) of the Standard
    Specifications.
    Bidders that bid electronically on Raleigh Central-Let projects will need a separate Digital
    Signature from the approved electronic bidding provider for Division Contracts.
    ELECTRONIC ON-LINE BID:
    1. Download entire proposal from Connect NCDOT website. Download the electronic submittal
    file from the approved electronic bidding provider website.
    2. In accordance with Article 102-3 of the Standard Specifications, registration on the Interested
    Parties List is required unless SP1 G02 Interested Parties List Not Required provision is
    included in the proposal.
    3. Prepare and submit the electronic submittal file using the approved electronic bidding provider
    software.
    4. Electronic bidding software necessary for electronic bid preparation may be downloaded from
    the Bid Express website following the directions at:
    https://connect.ncdot.gov/letting/Pages/Electronic-Bidding.aspx.
    5. Questions should be emailed 7 calendar days prior to the bid opening to Kayla N. Cooper at
    kncooper@ncdot.gov. Contact with any other NCDOT personnel concerning this project is
    strictly prohibited, unless otherwise noted, and may result in bids being considered non-
    responsive.

    DE00408 G-1 Granville County
    PROJECT SPECIAL PROVISIONS
    GENERAL
    DIVISION LET CONTRACT PREQUALIFICATION:
    (07-01-14)(12-1-16) SPD 01-410
    Any firm that wishes to bid as a prime contractor shall be prequalified as a Bidder or PO Prime
    Contractor prior to submitting a bid. Information regarding prequalification can be found at:
    https://connect.ncdot.gov/business/Prequal/Pages/default.aspx.
    Prior to performing the work, the prime contractor and/or subcontractor(s) shall be prequalified in
    the work code(s) which are identified as work items in the prime contractor's construction progress
    schedule that they will complete themselves. Any contractor identified as working outside their
    expertise may be considered in default of contract.
    BOND REQUIREMENTS:
    (6-1-16)(Rev.1-16-24) 102-8, 102-10 SPD 01-420A
    A Bid Bond is required in accordance with Article 102-10 of the Standard Specifications for Roads
    and Structures.
    Contract Payment and Performance Bonds are required in accordance with Article 103-7 of the
    Standard Specifications.
    HAUL ROADS:
    (7-16-24) 105 SP1 G04
    Revise the Standard Specifications as follows:
    Page 1-45, Article 105-15 RESTRICTION OF LOAD LIMITS, line 31, add the following after
    second sentence of the second paragraph:
    At least 30 days prior to use, the Contractor shall notify the Engineer of any public road proposed
    for use as a haul road for the project.
    CONTRACT TIME AND LIQUIDATED DAMAGES:
    (8-15-00) (Rev. 5-16-23) 108 SP1 G08 A
    The date of availability for this contract is July 27, 2026, except that work in jurisdictional waters
    and wetlands shall not begin until a meeting between the DOT, Regulatory Agencies, and the
    Contractor is held as stipulated in the permits contained elsewhere in this proposal. This delay in
    availability has been considered in determining the contract time for this project.
    The completion date for this contract is July 27, 2027.
    Except where otherwise provided by the contract, observation periods required by the contract will
    not be a part of the work to be completed by the completion date and/or intermediate contract times
    stated in the contract. The acceptable completion of the observation periods that extend beyond

    DE00408 G-2 Granville County
    the final completion date shall be a part of the work covered by the performance and payment
    bonds.
    The liquidated damages for this contract are Two Hundred Dollars ($ 200.00) per calendar day.
    These liquidated damages will not be cumulative with any liquidated damages which may become
    chargeable under Intermediate Contract Time Number 1.
    INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES:
    (7-1-95) (Rev. 2-21-12) 108 SP1 G13 A
    Except for that work required under the Project Special Provisions entitled Planting, Reforestation
    and/or Permanent Vegetation Establishment, included elsewhere in this proposal, the Contractor
    will be required to complete all work included in this contract and shall place and maintain traffic
    on same.
    The date of availability for this intermediate contract time is July 27, 2026.
    The completion date for this intermediate contract time is January 27, 2027.
    The liquidated damages for this intermediate contract time are One Thousand Dollars
    ($ 1,000.00) per calendar day.
    Upon apparent completion of all the work required to be completed by this intermediate date, a
    final inspection will be held in accordance with Article 105-17 and upon acceptance, the
    Department will assume responsibility for the maintenance of all work except Planting,
    Reforestation and/or Permanent Vegetation Establishment. The Contractor will be responsible for
    and shall make corrections of all damages to the completed roadway caused by his planting
    operations, whether occurring prior to or after placing traffic through the project.
    PERMANENT VEGETATION ESTABLISHMENT:
    (2-16-12)(Rev. 1-16-24) 104 SP1 G16
    Establish a permanent stand of the vegetation mixture shown in the contract. During the period
    between initial vegetation planting and final project acceptance, perform all work necessary
    to establish permanent vegetation on all erodible areas within the project limits, as well as,
    in borrow and waste pits. This work shall include erosion control device maintenance and
    installation, repair seeding and mulching, supplemental seeding and mulching, mowing,
    and fertilizer topdressing, as directed. All work shall be performed in accordance with the
    applicable section of the Standard Specifications. All work required for initial vegetation planting
    shall be performed as a part of the work necessary for the completion and acceptance of the
    Intermediate Contract Time (ICT). Between the time of ICT and Final Project acceptance,
    or otherwise referred to as the vegetation establishment period, the Department will be responsible
    for preparing the required National Pollutant Discharge Elimination System (NPDES) inspection
    records.
    Once the Engineer has determined that the permanent vegetation establishment requirement has
    been achieved at an 80% vegetation density (the amount of established vegetation per given area
    to stabilize the soil) and no erodible areas exist within the project limits, the Contractor will be
    notified to remove the remaining erosion control devices that are no longer needed. The Contractor

    DE00408 G-3 Granville County
    will be responsible for, and shall correct any areas disturbed by operations performed in permanent
    vegetation establishment and the removal of temporary erosion control measures, whether
    occurring prior to or after placing traffic on the project.
    Payment for Response for Erosion Control, Seeding and Mulching, Repair Seeding, Supplemental
    Seeding, Mowing, Fertilizer Topdressing, Silt Excavation, and Stone for Erosion Control will be
    made at contract unit prices for the affected items. Work required that is not represented by
    contract line items will be paid in accordance with Articles 104-7 or 104-3 of the Standard
    Specifications. No additional compensation will be made for maintenance and removal of
    temporary erosion control items.
    NO MAJOR CONTRACT ITEMS:
    (2-19-02) (Rev. 8-21-07) 104 SP1 G31
    None of the items included in this contract will be major items.
    SPECIALTY ITEMS:
    (7-1-95)(Rev. 1-16-24) 108-6 SP1 G37
    Items listed below will be the specialty items for this contract (see Article 108-6 of the
    Standard Specifications).
    Line # Description
    23-28 Guardrail
    36 Long-Life Pavement Markings
    37-62 Erosion Control
    63 Reforestation
    FUEL PRICE ADJUSTMENT:
    (11-15-05)(Rev. 1-16-24) 109-8 SP1 G43
    Page 1-82, Article 109-8, FUEL PRICE ADJUSTMENTS, add the following:
    The base index price for DIESEL #2 FUEL is $ 4.1013 per gallon. Where any of the following
    are included as pay items in the contract, they will be eligible for fuel price adjustment.

    Description Units Fuel Usage Factor Diesel
    Unclassified Excavation Gal/CY 0.29
    Borrow Excavation Gal/CY 0.29
    Class IV Subgrade Stabilization Gal/Ton 0.55
    Aggregate Base Course Gal/Ton 0.55
    Sub-Ballast Gal/Ton 0.55
    Erosion Control Stone Gal/Ton 0.55
    Rip Rap, Class _____ Gal/Ton 0.55
    Asphalt Concrete Base Course, Type ____ Gal/Ton 0.90 or 2.90
    Asphalt Concrete Intermediate Course, Type ____ Gal/Ton 0.90 or 2.90
    Asphalt Concrete Surface Course, Type ____ Gal/Ton 0.90 or 2.90
    Open-Graded Asphalt Friction Course Gal/Ton 0.90 or 2.90
    Permeable Asphalt Drainage Course, Type ____ Gal/Ton 0.90 or 2.90
    Sand Asphalt Surface Course, Type ____ Gal/Ton 0.90 or 2.90
    Ultra-thin Bonded Wearing Course Gal/Ton 0.90 or 2.90
    Aggregate for Cement Treated Base Course Gal/Ton 0.55
    Portland Cement for Cement Treated Base Course Gal/Ton 0.55
    > 11" Portland Cement Concrete Pavement Gal/SY 0.327
    Concrete Shoulders Adjacent to > 11" Pavement Gal/SY 0.327
    9" to 11" Portland Cement Concrete Pavement Gal/SY 0.272
    Concrete Shoulders Adjacent to 9" to 11" Pavement Gal/SY 0.272
    < 9" Portland Cement Concrete Pavement Gal/SY 0.245
    Concrete Shoulders Adjacent to < 9" Pavement Gal/SY 0.245

    DE00408 G-4 Granville County
    The pay items and the fuel factor used in calculating adjustments to be made will be as follows:
    Description Units Fuel Usage
    Factor Diesel
    Unclassified Excavation Gal/CY 0.29
    Borrow Excavation Gal/CY 0.29
    Class IV Subgrade Stabilization Gal/Ton 0.55
    Aggregate Base Course Gal/Ton 0.55
    Sub-Ballast Gal/Ton 0.55
    Erosion Control Stone Gal/Ton 0.55
    Rip Rap, Class _____ Gal/Ton 0.55
    Asphalt Concrete Base Course, Type ____ Gal/Ton 0.90 or 2.90
    Asphalt Concrete Intermediate Course, Type ____ Gal/Ton 0.90 or 2.90
    Asphalt Concrete Surface Course, Type ____ Gal/Ton 0.90 or 2.90
    Open-Graded Asphalt Friction Course Gal/Ton 0.90 or 2.90
    Permeable Asphalt Drainage Course, Type ____ Gal/Ton 0.90 or 2.90
    Sand Asphalt Surface Course, Type ____ Gal/Ton 0.90 or 2.90
    Ultra-thin Bonded Wearing Course Gal/Ton 0.90 or 2.90
    Aggregate for Cement Treated Base Course Gal/Ton 0.55
    Portland Cement for Cement Treated Base Course Gal/Ton 0.55
    > 11" Portland Cement Concrete Pavement Gal/SY 0.327
    Concrete Shoulders Adjacent to > 11" Pavement Gal/SY 0.327
    9" to 11" Portland Cement Concrete Pavement Gal/SY 0.272
    Concrete Shoulders Adjacent to 9" to 11" Pavement Gal/SY 0.272
    < 9" Portland Cement Concrete Pavement Gal/SY 0.245
    Concrete Shoulders Adjacent to < 9" Pavement Gal/SY 0.245
    For the asphalt items noted in the chart as eligible for fuel adjustments, the bidder may include
    the Fuel Usage Factor Adjustment Form with their bid submission if they elect to use the fuel
    usage factor. The Fuel Usage Factor Adjustment Form is found at the following link:
    https://connect.ncdot.gov/letting/LetCentral/Fuel%20Usage%20Factor%20Adjustment%20Form
    %20-%20%20Starting%20Nov%202022%20Lettings.pdf
    Select either 2.90 Gal/Ton fuel factor or 0.90 Gal/Ton fuel factor for each asphalt line item on
    the Fuel Usage Factor Adjustment Form. The selected fuel factor for each asphalt item will
    remain in effect for the duration of the contract.
    Failure to complete the Fuel Usage Factor Adjustment Form will result in using 2.90 gallons per
    ton as the Fuel Usage Factor for Diesel for the asphalt items noted above. The contractor will
    not be permitted to change the Fuel Usage Factor after the bids are submitted.

    Fiscal Year Progress (% of Dollar Value)
    2027 (7/01/26 - 6/30/27) 90% of Total Amount Bid
    2028 (7/01/27 - 6/30/28) 10% of Total Amount Bid

    DE00408 G-5 Granville County
    SCHEDULE OF ESTIMATED COMPLETION PROGRESS:
    (7-15-08)(Rev. 6-16-26) 108-2 SP1 G58
    The Contractor's attention is directed to the Standard Special Provision entitled Availability of
    Funds Termination of Contracts included elsewhere in this proposal. The Department of
    Transportation's schedule of estimated completion progress for this project as required by that
    Standard Special Provision is as follows:
    Fiscal Year Progress (% of Dollar Value)
    2027 (7/01/26 - 6/30/27) 90% of Total Amount Bid
    2028 (7/01/27 - 6/30/28) 10% of Total Amount Bid
    The Contractor shall also furnish his own progress schedule in accordance with Article 108-2 of
    the Standard Specifications. Any acceleration of the progress as shown by the Contractor's
    progress schedule over the progress as shown above shall be subject to the approval of the
    Engineer.
    MINORITY BUSINESS ENTERPRISE AND WOMEN BUSINESS ENTERPRISE
    (DIVISIONS):
    (10-16-07)(Rev. 10-21-25) 102-15(J) SP1 G67
    Description
    The purpose of this Special Provision is to carry out the North Carolina Department of
    Transportation's policy of ensuring nondiscrimination in the award and administration of contracts
    financed in whole or in part with State funds.
    Definitions
    Additional MBE/WBE Subcontractors - Any MBE/WBE submitted at the time of bid that will not
    be used to meet the Combined MBE/WBE goal. No submittal of a Letter of Intent is required.
    Combined MBE/WBE Goal: A portion of the total contract, expressed as a percentage that is to
    be performed by committed MBE/WBE subcontractors.
    Committed MBE/WBE Subcontractor - Any MBE/WBE submitted at the time of bid that is being
    used to meet the Combined MBE / WBE goal by submission of a Letter of Intent. Or any MBE
    or WBE used as a replacement for a previously committed MBE or WBE firm.
    Contract Goal Requirement - The approved participation at time of award, but not greater than the
    advertised Combined MBE/WBE contract goal.
    Goal Confirmation Letter - Written documentation from the Department to the bidder confirming
    the Contractor's approved, committed participation along with a listing of the committed MBE and
    WBE firms.
    Manufacturer - A firm that owns (or leases) and operates or maintains a factory or establishment
    that produces on the premises, the materials or supplies obtained by the Contractor. A firm that
    makes minor modifications to the materials, supplies, articles, or equipment is not a manufacturer.

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Follow Multiple Building Fire Exhaust Systems Repairs Active Contract Opportunity Notice ID N4008526R9059

    DEPT OF DEFENSE

    Bid Due: 8/05/2026

    Follow 43d Air Mobility Squadron_ Request for Proposal_FA445226R0012_B753 Kitchen Renovation Active Contract Opportunity

    DEPT OF DEFENSE

    Bid Due: 8/05/2026

    Follow Multiple Base-wide Location Fencing Repairs Active Contract Opportunity Notice ID N4008524R9072 Related

    DEPT OF DEFENSE

    Bid Due: 8/20/2026

    Project: Federal Pipe Video Contracts Ref. #: 269- 2026-235 Department: City Procurement Type:

    City of Charlotte

    Bid Due: 8/24/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.