JOSH STEIN
GOVERNOR
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
June 2, 2026
DANIEL H. JOHNSON
SECRETARY
NOTIFICATION OF AWARD
Adams Contracting Company Inc
PO Box 1157
Robbinsville, NC 28771
Contract ID:
TIP:
Federal Aid:
WBS:
County:
Description:
Dear Ms. Adams:
DN12221562
N/A
State Funded
20S.1050, 20S.1087
Jackson and Swain
Snow And Ice Removal Along US 74 from SR 1701/SR 1471
(Candle Stick Ln) in Jackson County to End of Four-Lane in
Almond in Swain County and NC 28 from US 74 in Swain County
to SR 1286 (Tsali Rd) in Graham County
I am pleased to inform you that Adams Contracting Company Inc has been awarded
the contract for the above project based on the bid submitted on May 26, 2026 in the
amount of $2,012,500.00.
This award letter does NOT constitute an executed contract. No work shall begin
until such time as an executed contract has been issued.
Documents to be submitted to the Division Office
Please provide the following documents to the Division 14 Contract Office within 14
calendar days from the date you receive your award letter:
1. A current certificate of insurance shall be provided on the latest revision of the
ACORD 25 form. The certificate of insurance shall verify coverage as required by
Article 107-15 of the Standard Specifications. Endorsements for additionally
ensured shall be included for those types of insurances being used to meet the
required liability / umbrella coverages. The certificate of insurance may be sent as
an email attachment, directly from your agent or from you, or it may be mailed,
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
HIGHWAY DIVISION 14
253 WEBSTER ROAD
SYLVA, NC 28779
Telephone: (828) 331-5200
Fax: (828) 331-5201
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
253 WEBSTER ROAD
SYLVA, NC 28779
shipped, or hand-delivered to the mailing address shown in the footer of the first
page of this award letter.
2. A properly executed Execution of Contract Non-Collusion, Debarment and
Gift Ban Certification; this includes all three pages; don’t forget the header
information on the last two pages. This document shall be submitted as hard-
copy, originals to the mailing address shown in the footer of the first page of this
award letter; it may be mailed, shipped, or hand-delivered. The Execution Forms
(Post-Bid) are available for downloading on the NCDOT web site at:
https://connect.ncdot.gov/letting/Pages/Central-Letting-Forms.aspx.
3. Two (2) original sets of executed Payment and Performance bonds, including
power of attorney. These bonds must include the date to be considered properly
executed; without the date, NCDOT will not execute the contract. These
documents shall be submitted as hard-copy, originals to the mailing address
shown in the footer of the first page of this award letter; these may be mailed,
shipped, or hand-delivered. The bond forms are available on the NCDOT web site
at https://connect.ncdot.gov/letting/Pages/Central-Letting-Forms.aspx.
Please remember that work on the project is not to begin before the contract has been
properly executed.
Documents to be submitted to the Division Maintenance Engineer’s Office
In addition, your attention is directed to Articles 107-16, 108-1, 108-2 and 108-3 of the
Standard Specifications relative to prosecution of work, progress schedule and
preconstruction conference. Also, in accordance with Article 104-2 of the Standard
Specifications, it will be necessary for you to submit the name of those individuals within
your organization who will be authorized to sign supplemental agreements that may be
necessary in the performance of the work under this contract. Information regarding these
items should be addressed prior to beginning work. Please forward the remaining
information to the Division Maintenance Engineer, Travis Williamson, as soon as
possible so that a preconstruction conference can be held. Travis Williamson’s mailing
address is 253 Webster Road, Sylva, NC 28779 and telephone number is (828) 331-5212.
If you have any questions, please contact me at (828) 331-5200.
Sincerely,
Laura Greene
Assistant Division Proposal Engineer
cc: Wesley Grindstaff, P.E., Division Engineer
Chris Lee, P.E., Deputy Division Engineer
Josh Deyton, P.E., Division Construction Engineer
Wes Jamison, P.E., Division Project Development Engineer
Travis Williamson, Division Maintenance Engineer
Graham Raxter P.E., Division Staff Maintenance Engineer
Troy Brooks, P.E., State Construction Engineer
Aaron C. Powell, P.E., Area Construction Engineer – Division 13 & 14
Steve Williams, Division Planning and Corridor Engineer
Tammy Stewart, Chief Communications Officer
Nadia A Al-Dhalimy, PhD, PE, Manager of the Schedule Management Office
Schedule Management Office (SMO)
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.