| Location: | North Carolina |
|---|---|
| Posted: | Feb 23, 2026 |
| Due: | Mar 25, 2026 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 274-EMJLR |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 274-EMJLR |
| Project Title: | EM Johnson Lagoon Rehabilitation Project |
| Description: | The City of Raleigh wishes to renovate an existing lagoon at the EM Johnson Water Treatment Plant at 10301 Falls of Neuse Road. Construction of improvements to the lagoon will generally consist of removal of organic containing soils in the lagoon, grading the bottom and side slopes of the lagoon; supply, placement and compaction of an 18 inch low permeability clay liner; construction of a high density polyethylene (HDPE) geomembrane cover over the clay liner on the interior side slopes of the lagoon; construction of lagoon drainage piping; supply, placement and compaction of sand and gravel drainage layers over the bottom of the lagoon; construction of a new 36 inch ductile iron gravity influent pipeline, and replacement of the existing fence around the lagoon. |
| Opening Date: | 3/25/2026 2:00 PM |
| Posted Date: | 2/23/2026 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-EMJLR
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2026-03-25T14:00:00.0000000
|
Posted Date
*
2026-02-23T13:12:04.0000000Z
|
Primary Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
Bid Agent: Breanne.Wood@raleighnc.gov
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Shaketha Edwards
|
|||
|
Description
The City of Raleigh wishes to renovate an existing lagoon at the EM Johnson Water Treatment Plant at 10301 Falls of Neuse Road. Construction of improvements to the lagoon will generally consist of removal of organic containing soils in the lagoon, grading the bottom and side slopes of the lagoon; supply, placement and compaction of an 18 inch low permeability clay liner; construction of a high density polyethylene (HDPE) geomembrane cover over the clay liner on the interior side slopes of the lagoon; construction of lagoon drainage piping; supply, placement and compaction of sand and gravel drainage layers over the bottom of the lagoon; construction of a new 36 inch ductile iron gravity influent pipeline, and replacement of the existing fence around the lagoon.
|
|||

With GovernmentContracts, you can: