Eagle Point WTP Boiler Replacement Project

Location: Iowa
Posted: Jun 3, 2026
Due: Jul 2, 2026
Agency: City of Dubuque, IA
Type of Government: State & Local
Category:
  • 99 - Miscellaneous
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Title: Eagle Point WTP Boiler Replacement Project
Category: Water
Status: Open
Description:

The City is seeking a consultant to develop a complete design for the Eagle Point WTP Boiler Replacement Project. The City also prefers that the Consultant be responsible for supervising any work that may be sub-contracted, including third party inspection firms. Based on written recommendation and agreement between the Consultant and City, the City shall enter into subconsultant contracts independent of this contract if required.

This project provides for the design of the replacement of the aging boilers and heating systems at the Eagle Point WTP. The existing boilers at the main plant facility were installed in 1995 and are nearing the end of their service life. New boilers will be more fuel efficient and will contribute to less carbon emissions. The existing boiler at the sludge plant building is also aging and was evaluated for replacement to improve redundancy and reliability.

The Selected Alternative for design scope is expected to include:

− Main Plant architectural updates to allow second means of egress from boiler room.

− Main Plant replacement of steam boilers with hot water boilers (2x at 2,500 MBtu each and 1x at 399 MBtu).

− Main Plant replacement of steam piping and terminal units with hot water piping and terminal units.

− Sludge Plant replacement of steam boiler with hot water boilers (4x at 399 MBtu, each)

− Sludge Plant replacement of steam piping and terminal units with hot water piping and terminal units.Page 6 of 38

The design will focus on creating design and construction documents necessary for bidding and construction activities. Modifications to the design specifics or evaluations of alternate arrangements shall be per recommendations of selected consultant during design


Publication Date/Time:
6/3/2026 12:00 AM
Closing Date/Time:
7/2/2026 2:00 PM
Contact Person:
Eldon Schneider
Water Project Supervisor
Water Department
City of Dubuque
1902 Hawthorne Street
Dubuque, IA 52001
Phone: 563-589-4292 (Office)
563-599-2298 (Mobile)
E-mail: eschneid@cityofdubuque.org
Download Available:
www.cityofdubuque.org/bids
Fee:
No Plan Deposit Required
Plan & Spec Available:
N/A
Plan Holders List:
Available upon request
Related Documents:
View Document(s)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Arena - Architectural Design Services - Request for Qualifications (RFQ) Friday, July 24, ...

University of Iowa Facilities Management

Bid Due: 7/24/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.