| Location: | Georgia |
|---|---|
| Posted: | Jul 2, 2025 |
| Due: | Aug 5, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-62351-NONST-2025-000000020 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-62351-NONST-2025-000000020 | Paving, Leveling and Patching North St. and Paul Croft Way (Short St.) and Sidewalk Installation | Ringgold, City Of |
Jul 02, 2025 @ 12:38 PM
|
Aug 05, 2025 @ 02:00 PM
|
Start Date: Jul 02, 2025 @ 12:38 PM ET
End Date:
Aug 05, 2025 @ 02:00 PM ET
North Street
¿ Paving is to start at Cleveland and end at High Street.
¿ North Street is .28 LM and 18 feet wide.
¿ Traffic control will be needed.
*Spot Leveling
*Recycled Asphalt Conc. Leveling include
Bitum Matl and H Lime 1 inch thick---- 96Tons
*Recycled Asphalt Conc. 9.5MM
Superwave, type 1 Blend include
Bitum and H Lime 1 inch thick----------------------------------- 96Tons
*Bitum tack coat---- 201 Gallons
*Milling required at all intersection transitions
*No Striping
Paul Croft Way (Short Street)
¿ Paving is to start at Sparks Street and end at Guyler Street.
¿ Paul Croft Way is .30 LM and 28 feet wide.
¿ Traffic control will be needed.
*Spot Leveling
*Recycled Asphalt Conc. Leveling include
Bitum Matl and H Lime 1 inch thick---- 24 Tons
*Recycled Asphalt Conc. 9.5MM
Superwave, type 1 Blend include
Bitum and H Lime 1 inch thick----24 Tons
*Bitum tack coat---- 40 Gallons
¿ Milling required at intersection transitions
*No Striping
Sparks Street Sidewalk
¿ Sidewalk is to start at Whitten Street and continue to Cleveland Street at Lafayette Street.
¿ Sidewalk to be 5 feet wide and 4 inch in depth
¿ Radius form is required at each intersection and connection to existing sidewalk
¿ Sidewalk is to be flush with existing ground
¿ 4 inches of #89 base stone is required
¿ Broom finish is required
¿ Backfill and in finish seeding is required
¿ Traffic control will be needed.
*Estimated concrete required (580 linear feet) --- 38 cu yd
*No crosswalk Striping
Boynton Drive Sidewalk
¿ Sidewalk is to start at existing termination of sidewalk and continue to Hummingbird Lane.
¿ Sidewalk to be 5 feet wide and 4 inch in depth
¿ Radius form is required at each intersection
¿ Sidewalk is to be flush with existing ground
¿ 4 inches of #89 base stone is required
¿ Broom finish is required
¿ Backfill and in finish seeding is required
*Estimated concrete required (190 linear feet) ----- 14 cu yd
*No crosswalk Striping
See complete ITB at www.cityof ringgoldga.gov
| Code | Description |
| 91395 | Paving and Resurfacing, Highway and Road |
| 91396 | Paving and Resurfacing, Streets, Major and Residential |
Nicki Lundeen
nickilundeen@cityofringgoldga.gov
706-935-3061

With GovernmentContracts, you can:
...Description The construction of +- 0.12 LM of leveling and resurfacing, including +- ...
State Government of Georgia
Bid Due: 6/04/2026
...Superpave patching at 330 / SY, +- 1584 tons of spot leveling with ...
State Government of Georgia
Bid Due: 6/16/2026
..., including +- 1633 tons of 9.5mm Superpave, +- 841 tons of OGI ...
State Government of Georgia
Bid Due: 6/08/2026