| Location: | Vermont |
|---|---|
| Posted: | Jun 18, 2025 |
| Due: | Jul 8, 2025 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Rutland Keywords: Construction (Non Building) Bid Description: Base Bid - Portion of Hortonville Rd -5,420 lf – Asphalt Paving From Shrewsbury Town line (at end of existing asphalt) to a point at the VELCO ROW(at end of existing asphalt). This section of roadway was previously reclaimed in 2021 and is gravel surface. See attached maps (page 4 & 5) for limits. Alternate 1 – Hortonville and Shunpike Rd Intersection – 10,800 sf – Shim and Overlay Paving At the intersection of Hortonville Road and Shunpike Road to the limits shown on the attached map (page 4 & 6)
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...of Hortonville Rd - 3,700lf - Asphalt Paving From Route 103(start at edge ...
State Government of Vermont
Bid Due: 6/30/2026
...Locations: Addison Keywords: Construction (Non Building), Paving Contractor Bid Description: The... with an ...
State Government of Vermont
Bid Due: 6/18/2026