| Location: | Kentucky |
|---|---|
| Posted: | Jun 18, 2025 |
| Due: | Jun 24, 2025 |
| Agency: | State Government of Kentucky |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB-785-2500000707-4 |
| Publication URL: | To access bid details, please log in. |
Description: RFB-259-25 KHP Competition Barns & Stall Bid Pack 1
Department: Facilities & Support Services
Buyer: Susan Ward
Solicitation Number: RFB-785-2500000707-4
Type: Request for Bids (RFB)
Category: Construction
Closing Date and Time: 06/24/2025 01:30 PM EDT
| Line Number | Commodity Description | Details | Requested | |
|
1
|
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.***
Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED.
On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Document" and submitted as an attachment in the e-procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct.
** Entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded**
BP-1 scope is to provide three new Hybrid Style barns (Barn A, B, and I, with J as an Alternate. The modular stalls and interlocking stall mats will be part of BP-2. Each barn is to have a conventional steel frame, with Pre-Engineered Metal Building components for the reminder of the structure, purlins, metal wall panels, metal roof panels and any miscellaneous framing required to support the roof or wall panels is to be by the Pre-Engineered Metal Building provider. These include but are not limited to: Roof purlins, base or top angles, wall girts and struts. There will be several rooms constructed at each end of each barn and will be constructed of CMU or concrete with a concrete cap over a portion of the spaces. The CMU and concrete is to be painted with an industrial urethane enamel paint. An existing transformer will serve Barns A and B, and is to remain in place. Another existing transformer is to be relocated to serve the new barns I and Alternate J. New lighting, HVAC, and plumbing is to be provided for each barn as per the contract documents. The BP-1 General Contractor is responsible for coordinating with the BP-2 General Contractor for scheduling and installation of the new custom modular stalls and mats, as part of the BP-2 scope. The schedules for both BP-1 and BP-2 are the same, as it is intended the BP-1 General Contractor will provide access for the installation of the custom modular stalls and mats during the construction period, so that both bid packs can achieve Substantial Completion at the same time.
|
Specifications
Commodity Code
912
|
Service From
06/30/2025
Service To
06/17/2026
|
View Purchase History
Additional Information
|

With GovernmentContracts, you can:
...Project: Construction Manager at Risk (CMAR)-Municipal Building Ref. #: 2026-55 Department...: The City ...
City of Bowling Green
Bid Due: 6/22/2026
...Project: Sun Valley Pool Construction Ref. #: RFP260268 Department: Parks & Recreation Type... ...
City of Louisville, Kentucky
Bid Due: 7/09/2026
...Bid Number: 26-026 Bid Title: Construction Inspection Services for KY-17 Corridor Tunnel Category... ...
Northern Kenturky's Sanitation District
Bid Due: 6/30/2026
...Follow Construction MATOC Blue Grass Army Depot Active Contract Opportunity Notice ID... and ...
DEPT OF DEFENSE
Bid Due: 6/26/2026