ADDENDUM #2
RENOVATIONS
BOYS & GIRLS CLUB
1 TUDOR ROAD
MILFORD, CT 06460
S/P+A PROJECT #25.031
DATE: August 20, 2026
The following changes to the Drawings and Project Specifications shall become a part of the Drawings
and Project Specifications; superseding previously issued Drawings and Project Specifications to the
extent modified by Addendum #2.
General Information:
* The deadline for RFIs has been extended to Tuesday, August 25, 2026.
* See attached RFI log. (6) RFIs with no responses will be answered in a future addendum.
Changes to Addenda:
* ADDENDUM #1:
Changes to the Specifications, BID FORM, delete in its entirety. A new BID FORM has been
o
added and is attached as part of this addendum. (4) (Per RFI #059)
Changes to the Drawings, the following ARCHITECTURAL drawings have been deleted in their
o
entirety. New drawings have been added and are attached as part of this addendum*: (5)
A011 DEMOLITION FLOOR PLANS (Per RFIs #060 & 061)
A111 FLOOR PLANS (Per Internal Review)
Changes to the Specifications:
* SECTION 012300, ALTERNATES, Page 2, Article 3.1, add the following:
"K. ADD ALTERNATE #11: Rain Garden: Add to the Base Bid the labor, material, and equipment
for the provision and installation of a mix of smaller perennials and shrubs as indicated on
Drawing L-3 in lieu of the seed mix." (Per RFI #059)
* SECTION 024119, SELECTIVE DEMOLITION:
Page 2, Article 1.6.B., delete in its entirety.
o
Page 4, Article 3.3.A.1., delete "and to and from occupied portions of the building" in its entirety.
o
(Per RFI #073)
* SECTION 051200, STEEL FRAMING, Page 8, Article 2.8, delete in its entirety. (Per RFI #077)
* SECTION 096566, RESILIENT ATHLETIC FLOORING, Article 3.2.D. add to the end the following:
"; remove bumps and ridges to produce a uniform and smooth substrate. Expect and include in the
Base Bid the requirement to apply and machine level at least three (3) coats of leveler (underlayment)
Boys & Girls Club Renovations - Milford
Addendum #2-1
ADDENDUM #2
in all spaces. Comply with requirements in Section 035416 "Hydraulic Cement Underlayment"." (Per
RFI #084)
* SECTION 220100. GENERAL CONDITIONS FOR PLUMBING TRADE, Page 13, Article 1.31.B.,
delete in its entirety. (Per RFI #073)
* SECTION 221316, SANITARY WASTE AND VENT PIPING, Article 1.5, delete in its entirety. (Per RFI
#073)
* SECTION 221323, SANITARY WASTE INTERCEPTORS, Page 2, Article 1.6, delete in its entirety.
(Per RFI #073)
* SECTION 231623, FACILITY NATURAL-GAS PIPING, Page 3, Article 1.10.B., delete in its entirety.
(Per RFI #073)
* SECTION 230000, BASIC MECHANICAL REQUIREMENTS:
Page 1, Article 1.3.E., delete in its entirety.
o
Page 2, Article 1.6, delete in its entirety.
o
Page 3, Article 1.11.D., delete in its entirety. (Per RFI #073)
o
* SECTION 230500, COMMON WORK RESULTS FOR HVAC, Page 2, Article 1.8, delete in its entirety.
(Per RFI #073)
* SECTION 233113, METAL DUCTS:
Page 1, Article 1.2.A., add the following:
o
"8. Double-wall round ducts and fittings."
Page 8, Part 2, add the following:
o
"2.8 DOUBLE-WALL ROUND DUCTS AND FITTINGS
A. Manufacturers: Subject to compliance with requirements, provide products by one
(1) of the following:
1. Lindab Inc.
2. McGill AirFlow LLC
3. SEMCO Incorporated
4. Sheet Metal Connectors, Inc.
B. Outer Duct: Comply with SMACNA's "HVAC Duct Construction Standards - Metal
and Flexible," Chapter 3, "Round, Oval, and Flexible Duct," based on static-
pressure class unless otherwise indicated.
1. Transverse Joints: Select joint types and fabricate according to SMACNA's
"HVAC Duct Construction Standards - Metal and Flexible," Figure 3-2,
"Transverse Joints - Round Duct," for static-pressure class, applicable
sealing requirements, materials involved, duct-support intervals, and other
provisions in SMACNA's "HVAC Duct Construction Standards - Metal and
Flexible."
2. Longitudinal Seams: Select seam types and fabricate according to
SMACNA's "HVAC Duct Construction Standards - Metal and Flexible,"
Boys & Girls Club Renovations - Milford
Addendum #2-2
ADDENDUM #2
Figure 3-1, "Seams - Round Duct and Fittings," for static-pressure class,
applicable sealing requirements, materials involved, duct-support intervals,
and other provisions in SMACNA's "HVAC Duct Construction Standards -
Metal and Flexible."
3. Tees and Laterals: Select types and fabricate according to SMACNA's
"HVAC Duct Construction Standards - Metal and Flexible," Figure 3-4, "90
Degree Tees and Laterals," and Figure 3-5, "Conical Tees," for static-
pressure class, applicable sealing requirements, materials involved, duct-
support intervals, and other provisions in SMACNA's "HVAC Duct
Construction Standards - Metal and Flexible."
C. Inner Duct: Minimum 0.028-inch solid sheet steel.
D. Interstitial Insulation: Fibrous-glass liner complying with ASTM C 1071, NFPA 90A,
or NFPA 90B; and with NAIMA AH124, "Fibrous Glass Duct Liner Standard."
1. Maximum Thermal Conductivity: 0.27 Btu x in./h x sq. ft. x deg F at 75 deg F
mean temperature.
2. Install spacers that position the inner duct at uniform distance from outer
duct without compressing insulation.
3. Coat insulation with anti-microbial coating.
4. Cover insulation with polyester film complying with UL 181, Class 1.
E. Interstitial Insulation: Flexible elastomeric duct liner complying with ASTM C 534,
Type II for sheet materials, and with NFPA 90A or NFPA 90B.
1. Maximum Thermal Conductivity: 0.25 Btu x in./h x sq. ft. x deg F at 75 deg F
mean temperature." (Per RFI #090)
* SECTION 260543, UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS:
Page 3, Article 1.7, delete in its entirety. (Per RFI #073)
o
Page 8:
o
Article 2.5.K, delete in its entirety.
Article 2.6.B., delete "manholes and" in its entirety.
Page 10:
o
Article 3.5.A, delete "manholes and" and last sentence in their entirety.
Article 3.5.D.2., delete "manholes or" in its entirety.
Article 3.5.H.2., delete in its entirety.
Page 12:
o
Articles 3.6.B.1 and 3.6.F., and 3.6.H., delete in their entirety.
Article 3.6.D., revise to read as follows:
"Waterproofing: Apply manufacturer's recommended waterproofing to exterior surfaces of
handholes after concrete has cured at least (3) days. After ducts have been connected
and grouted, and before backfilling, waterproof joints and connections and touch up
abrasions and scars."
Boys & Girls Club Renovations - Milford
Addendum #2-3
ADDENDUM #2
Page 13:
o
Article 3.6.H., delete in its entirety.
Article 3.6.G., delete "Manholes and" and "3-7/8 inches for manholes and" in their
entirety.
Page 14:
o
Article 3.9.A.3., delete "manhole and" in its entirety.
Article 3.10.B., delete in its entirety. (Per Internal Review)
* SECTION 262416, PANELBOARDS:
Page 3, Article 1.8.C., delete in its entirety. (Per RFI #073)
o
* SECTION 262713, ELECTRICITY METERING, Page 2, Article 1.7, delete in its entirety. (Per RFI
#073)
* SECTION 262816, ENCLOSED SWITCHES AND CIRCUIT BREAKERS, Page 3, Article 1.7.B., delete
in its entirety. (Per RFI #073)
* SECTION 262913, SOFT-START MOTOR CONTROLLERS, Page 3, Article 1.8.B., delete in its
entirety. (Per RFI #073)
* SECTION 263323, INVERT/BATTERY EQUIPMENT FOR EMERGENCY LIGHTING:
Page 3, Article 1.10.B., delete in its entirety. (Per RFI #073)
o
* SECTOPM 283111. DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM:
Page 1, Article 1.1.B., delete in its entirety. (Per Internal Review)
o
Page 3, Article 1.8, delete in its entirety. (Per RFI #073)
o
* SECTION 311000, SITE CLEARING, Page 3, Article 3.3.C., delete in its entirety. (Per RFI #073)
Changes to the Drawings:
* The following STRUCTURAL drawings have been deleted in their entirety. New drawings have been
added and are attached as part of this addendum*: (2)
S000 GENERAL NOTES (Per RFIs #016 & #050)
o
S110 FOUNDATION PLAN (Per RFIs #057, #058 & #075)
o
* The following ARCHITECTURAL drawings have been deleted in their entirety. New drawings have
been added and are attached as part of this addendum*: (5)
A113 ROOF PLAN (Per RFI #046)
o
A211 FINISH FLOOR PLANS (Per RFIs #080 & 083)
o
A212 FINISH SCHEDULE & DETAILS(Per RFI #080)
o
A451-A452 TOILET ROOM ELEVATIONS (Per RFI #080)
o
* The following ELECTRICAL drawings have been deleted in their entirety. New drawings have been
added and are attached as part of this addendum*: (3)
Boys & Girls Club Renovations - Milford
Addendum #2-4
ADDENDUM #2
E400 ELECTRICAL ONE LINE RISER DIAGRAM (Per Utilities)
o
ES001 ELECTRICAL DEMOLTION SITE PLAN (Per Utilities)
o
ES100 ELECTRICAL NEW WORK SITE PLAN (Per Utilities)
o
The bid date has been extended to September 3, 2026 at 3:00pm by this addendum.
The addendum consists of fifteen (15) pages of 812" x 11" text and twelve (12) 30" x 42" drawings*.
End of Addendum #2
Boys & Girls Club Renovations - Milford
Addendum #2-5
| RFI # | QUESTION | DATE RECEIVED | RESPONSE | ADDENDUM # ISSUED |
|---|---|---|---|---|
| 001 | Does the project has CHRO requirements and prevailing wage requirements? | 08/05/26 | While set aside requirements are not required, Contractor does need to follow CHRO for non- discrimination per AIA A101. Prevailing wage requirements apply per AIA A101. | 1 |
| 002 | Are there liquidated damages for the bid bond? | 08/05/26 | Project has liquidated damage requirements. Refer to AIA A101. | 1 |
| 003 | Is CHRO required? | 08/05/26 | Refer to RFI #001. | 1 |
| 004 | Specification Section 23 09 26, Paragraph 2.1, lists three (3) acceptable Building Automation System manufacturers. Please advise whether Alerton Controls may be accepted as an approved equivalent. Alerton's building automation system meets the specified performance, functionality, interoperability, and BACnet requirements outlined in the contract documents. | 08/05/26 | Substitutions are not allowed for Section 230926. | 1 |
| 005 | Per the Bid Form - Base Bid Section, Bidder is to provide a duration for commencement of work after the receipt of the Notice to Proceed or Contract signing. Section also references SIB 1.1.B. which is either not a correct reference or the referenced section does not exist. Please provide a proposed/intended date (or timeframe) of commencement of the work. If there are any limitations or milestones to the project schedule, including commencement date, completion date, etc., please advise. | 08/05/26 | Disregard reference to SIB 1.1.B. Refer to Addendum #1 for revised Bid Form. Contractor to provide the duration of the project as stated. However, project must be complete by July 31, 2027. | 1 |
| 006 | As per Door Schedule Dr. A850 door#100; 100-1,2,3; 112-3; 118; 118-1; 119-4; 129; 129-1; listed as Type-4 which is OH doors. Please clarify door type. | 08/06/26 | Refer to Addendum #1 for revised Drawing A850. | 1 |
| 007 | Please provide size of the OD doors #115-2 & 115-3. Detail 7/A450 refers to Elevation 6/A850, however Elevation 6 is missing. Please advise. | 08/06/26 | Refer to Addendum #1 for revised Drawings A450 & A850. | 1 |
| 008 | Please provide milestone/duration of the project. | 08/07/26 | Refer to RFI #005. | 1 |
| 009 | Please advise if project Budget is available. | 08/07/26 | Project budget is not available. | 1 |
| 010 | Drawing C-3 there is a catch basin with top of frame 29.7 but no invert for the pipe. Also, stmh 2 does not have a top of frame or inverts for the pipes. Please advise. | 08/10/26 | ||
| 011 | What is the last day of questions? | 08/10/26 | Refer to A701, 3.2.2. | 1 |
| 012 | The demolition drawings do not indicate the removal of existing flooring however the finish plans require new flooring installations. Are we correct to assume all existing floor finishes will be removed by Owner's Abatement Contractor? | 08/11/26 | Correct. | 1 |
| 013 | Spec. Section 035416 Hydraulic Cement Underlayment - Ardex K 15 is included in the project manual but the documents do not indicate the areas where Ardex K 15 should be applied. Please provide the areas where it is required. | 08/11/26 | Refer to flooring sections within Division 09 of the project manual for references to Section 035416. | 1 |
| 014 | Spec. Section 074646 Fiber-Cement Siding was included in the project manual but the drawings do not indicate where this material is required. Please advise location(s). | 08/11/26 | Refer to Elevations, Window Types/Elevations & respective details for fiber cement panels. | 1 |
| 015 | Please provide anticipated start date for the Project. | 08/11/26 | Contractor can start immediately upon 'Notice to Proceed' or signing of contract. Contractor to provide commencement time frame where indicated on the Bid Form. | 1 |
| 016 | Spec 078100 Applied Fireproofing provided. Note 15 on dr. S000 stated "spray-on fireproofing shell be applied to all structural steel, however only one detail for applied fireproofing provided on G003. Please provide more details/areas of steel decks where fireproofing should be applied. | 08/11/26 | 2 | |
| 017 | As per Alternate #2 Acoustic Wall Panel (AWP) should be installed where indicated on Drawings, however drawings not showing AWP. Please advice. | 08/11/26 | Refer to Finish Key Note #01 on Drawing A211. | 1 |
| 018 | During the walkthrough on Tuesday, August 11, we notes that some site work equipment and piles of dirt and back fill material on the back parking lot. Is the owner performing some site work in the area? Please advice. | 08/11/26 | The gas company is temporarily using the parking lot for equipment & materials. All will be removed before the project starts. | 1 |
| 019 | Please specify which products are acceptable for "Classroom Sec. Lockset". Is this a standard Schalge ND Vandlguard lock, or is the spec writer looking for something more robust like a Securitech safebolt lock? | 08/12/26 | Standard Schlage ND Vandlguard lock, classroom security lock function. | 1 |
| 020 | Please confirm all hollow metal doors are the drawn "Type 1" flush elevation as drawn. Doors in corridors should have vision kit provisions. | 08/12/26 | Confirmed.No vision lites are required. | 1 |
BID RFI LOG
SILVER PETRUCELLI + ASSOCIATES
3190 Whitney Avenue | Hamden CT 06518
311 State Street | New London CT 06320
Project:Milford Boys & Girls Club Renovations
08/20/2026
State Project/Bid #: RFI Deadline:08/25/2026
08/27/26, 3:00p
S/P+A Project #:25.031 Bids Due:09/03/26, 3:00p
RFI # QUESTION DATE RESPONSE ADDENDUM #
RECEIVED ISSUED
While set aside requirements are not required,
Does the project has CHRO requirements and prevailing Contractor does need to follow CHRO for non-
001 08/05/26 1
wage requirements? discrimination per AIA A101. Prevailing wage
requirements apply per AIA A101.
Project has liquidated damage requirements. Refer to
002 Are there liquidated damages for the bid bond? 08/05/26 1
AIA A101.
003 Is CHRO required? 08/05/26 Refer to RFI #001. 1
Specification Section 23 09 26, Paragraph 2.1, lists three (3)
acceptable Building Automation System manufacturers.
Please advise whether Alerton Controls may be accepted as
004 an approved equivalent. Alerton's building automation system 08/05/26 Substitutions are not allowed for Section 230926. 1
meets the specified performance, functionality,
interoperability, and BACnet requirements outlined in the
contract documents.
Per the Bid Form - Base Bid Section, Bidder is to provide a
duration for commencement of work after the receipt of the
Notice to Proceed or Contract signing. Section also
Disregard reference to SIB 1.1.B. Refer to Addendum
references SIB 1.1.B. which is either not a correct reference
#1 for revised Bid Form. Contractor to provide the
005 or the referenced section does not exist. Please provide a 08/05/26 1
duration of the project as stated. However, project must
proposed/intended date (or timeframe) of commencement of
be complete by July 31, 2027.
the work. If there are any limitations or milestones to the
project schedule, including commencement date, completion
date, etc., please advise.
As per Door Schedule Dr. A850 door#100; 100-1,2,3; 112-3;
006 118; 118-1; 119-4; 129; 129-1; listed as Type-4 which is OH 08/06/26 Refer to Addendum #1 for revised Drawing A850. 1
doors. Please clarify door type.
Please provide size of the OD doors #115-2 & 115-3. Detail
Refer to Addendum #1 for revised Drawings A450 &
007 7/A450 refers to Elevation 6/A850, however Elevation 6 is 08/06/26 1
A850.
missing. Please advise.
008 Please provide milestone/duration of the project. 08/07/26 Refer to RFI #005. 1
009 Please advise if project Budget is available. 08/07/26 Project budget is not available. 1
Drawing C-3 there is a catch basin with top of frame 29.7 but
010 no invert for the pipe. Also, stmh 2 does not have a top of 08/10/26
frame or inverts for the pipes. Please advise.
011 What is the last day of questions? 08/10/26 Refer to A701, 3.2.2. 1
The demolition drawings do not indicate the removal of
existing flooring however the finish plans require new flooring
012 08/11/26 Correct. 1
installations. Are we correct to assume all existing floor
finishes will be removed by Owner's Abatement Contractor?
Spec. Section 035416 Hydraulic Cement Underlayment -
Ardex K 15 is included in the project manual but the Refer to flooring sections within Division 09 of the
013 08/11/26 1
documents do not indicate the areas where Ardex K 15 should project manual for references to Section 035416.
be applied. Please provide the areas where it is required.
Spec. Section 074646 Fiber-Cement Siding was included in
Refer to Elevations, Window Types/Elevations &
014 the project manual but the drawings do not indicate where this 08/11/26 1
respective details for fiber cement panels.
material is required. Please advise location(s).
Contractor can start immediately upon 'Notice to
Proceed' or signing of contract. Contractor to provide
015 Please provide anticipated start date for the Project. 08/11/26 1
commencement time frame where indicated on the Bid
Form.
Spec 078100 Applied Fireproofing provided. Note 15 on dr.
S000 stated "spray-on fireproofing shell be applied to all
structural steel, however only one detail for applied
016 08/11/26 2
fireproofing provided on G003. Please provide more
details/areas of steel decks where fireproofing should be
applied.
As per Alternate #2 Acoustic Wall Panel (AWP) should be
017 installed where indicated on Drawings, however drawings not 08/11/26 Refer to Finish Key Note #01 on Drawing A211. 1
showing AWP. Please advice.
During the walkthrough on Tuesday, August 11, we notes that
The gas company is temporarily using the parking lot for
some site work equipment and piles of dirt and back fill
018 08/11/26 equipment & materials. All will be removed before the 1
material on the back parking lot. Is the owner performing
project starts.
some site work in the area? Please advice.
Please specify which products are acceptable for "Classroom
Sec. Lockset". Is this a standard Schalge ND Vandlguard Standard Schlage ND Vandlguard lock, classroom
019 08/12/26 1
lock, or is the spec writer looking for something more robust security lock function.
like a Securitech safebolt lock?
Please confirm all hollow metal doors are the drawn "Type 1"
020 flush elevation as drawn. Doors in corridors should have vision 08/12/26 Confirmed.No vision lites are required. 1
kit provisions.
Page 1 of 6
| RFI # | QUESTION | DATE RECEIVED | RESPONSE | ADDENDUM # ISSUED |
|---|---|---|---|---|
| 021 | Please confirm if hardware sets with electrified hardware should have EPT preps/electrified hinges and wiring harnesses added to the hardware sets. | 08/12/26 | All prep and wiring required for complete installations are to be included. | 1 |
| 022 | Please confirm what kind of key system will be used in this building. | 08/12/26 | Refer to Section 087100, 2.12. | 1 |
| 023 | Must all round ductwork in gym be double wall construction? | 08/12/26 | Yes. | 1 |
| 024 | Will there be a bid extension? | 08/12/26 | No. Yes, refer to Addendum #2. | 1 2 |
| 025 | Must all ductwork in locker room and toilet areas be aluminum? | 08/12/26 | Yes. | 1 |
| 026 | Are galvanized secondary drain pans required for all ducts fcu's? | 08/12/26 | Yes. | 1 |
| 027 | What is the schedule for this project? | 08/12/26 | Refer to RFIs 005 & 015. | 1 |
| 028 | Is Antimicrobial Coating to all ductwork required for this project? | 08/12/26 | Yes. | 1 |
| 029 | Must all duct liner be 1" closed cell? | 08/12/26 | Yes. | 1 |
| 030 | Will there be duct liner 10 feet down stream supply and return for RTUS,ERVS,FCUS? | 08/12/26 | Yes. | 1 |
| 031 | For KEF-1 must the ductwork be black iron or stainless construction? | 08/12/26 | Stainless-steel, not less than 18-gauge. | 1 |
| 032 | Must all rectangle duct connected to RTU-1 be single or double wall construction? | 08/12/26 | Single wall. | 1 |
| 033 | Are Buckley es200 duct roof supports acceptable? | 08/12/26 | No, provide per drawings & specifications. | 1 |
| 034 | Please confirm that hardware sets on doors 137 & 135 are correct. Door 137 (Men's room) is scheduled to have an auto operator and a deadbolt (hardware set 26). The deadbolt should be removed to prevent damaging the auto operator. Also, door 135 has a different hardware set (28) yet should have the same intended function as door 137, please confirm. | 08/12/26 | Confirmed, they are correct. Power operator on Door 137 must have the ability to stop opening on resistance. Door 135 does not require a power operator per ADA therefore has a different hardware set as indicated. | 1 |
| 035 | Please confirm auto operators are specified on correct doors, currently, operators are scheduled on aluminum doors 100 & 100-2. And are scheduled on hollow metal doors 104, 120, 126, 128-2, 130, 137, & 120-1. Please confirm auto operators are intended to be on these doors. | 08/12/26 | Confirmed. | 1 |
| 036 | All the new panels have notes regarding "provide electronic breakers" (note #2 drawing E500) but they don't specify on the panel schedule which ones have to be electronic. Also, on panel KP (note #6 drawing E501) they mention Ground fault breakers and shunt trip breakers, but they really don't specify which breakers need this. | 08/13/26 | The electronic trip breaker note is not intended for every branch circuit breaker. Standard thermal-magnetic breakers are acceptable unless an electronic trip breaker is specifically required by the equipment manufacturer. For Panel KP, GFCI breaker protection shall be provided for 125V, single-phase kitchen receptacle circuits where required by NEC. Shunt trip breakers are only required for kitchen equipment/receptacle circuits under the exhaust hood that are required to shut down upon activation of the hood fire-suppression system. Final requirements to be coordinated with the approved kitchen equipment & hood/fire-suppression submittals. Refer to Addendum #1 for Drawing E500 & E501 revisions. | 1 |
| 037 | Specifications refer to window shades. I cannot locate these anywhere on the plans. Are they required? If so, where? | 08/14/26 | Refer to Finish Key Note #04 on Drawing A211. | 2 |
| 038 | Does this project have SBE, WBE, MBE requirements? | 08/14/26 | Refer to RFI #001. | 2 |
| 039 | Do they having funding for the project? | 08/14/26 | Yes. | 2 |
| 040 | Is a project sign required? If so, please provide size and details. | 08/14/26 | ||
| 041 | Are we to include testing agency costs? | 08/14/26 | Unless otherwise indicated in the project manual, Owner is responsible to retain and pay for third-party testing. | 2 |
| 042 | Is this project tax exempt? | 08/14/26 | Yes. | 2 |
| 043 | Are we to include building permit fees or just State of CT Education fees? | 08/14/26 | Refer to A201, 3.7. | 2 |
| 044 | How much area is to be included with the hydraulic cement underlayment? | 08/14/26 | Refer to RFI #013. | 2 |
BID RFI LOG
SILVER PETRUCELLI + ASSOCIATES
3190 Whitney Avenue | Hamden CT 06518
311 State Street | New London CT 06320
Project:Milford Boys & Girls Club Renovations
08/20/2026
State Project/Bid #: RFI Deadline:08/25/2026
08/27/26, 3:00p
S/P+A Project #:25.031 Bids Due:09/03/26, 3:00p
RFI # QUESTION DATE RESPONSE ADDENDUM #
RECEIVED ISSUED
Please confirm if hardware sets with electrified hardware
All prep and wiring required for complete installations
021 should have EPT preps/electrified hinges and wiring 08/12/26 1
are to be included.
harnesses added to the hardware sets.
Please confirm what kind of key system will be used in this
022 08/12/26 Refer to Section 087100, 2.12. 1
building.
023 Must all round ductwork in gym be double wall construction? 08/12/26 Yes. 1
No. 1
024 Will there be a bid extension? 08/12/26
Yes, refer to Addendum #2. 2
Must all ductwork in locker room and toilet areas be
025 08/12/26 Yes. 1
aluminum?
Are galvanized secondary drain pans required for all ducts
026 08/12/26 Yes. 1
fcu's?
027 What is the schedule for this project? 08/12/26 Refer to RFIs 005 & 015. 1
Is Antimicrobial Coating to all ductwork required for this
028 08/12/26 Yes. 1
project?
029 Must all duct liner be 1" closed cell? 08/12/26 Yes. 1
Will there be duct liner 10 feet down stream supply and return
030 08/12/26 Yes. 1
for RTUS,ERVS,FCUS?
For KEF-1 must the ductwork be black iron or stainless
031 08/12/26 Stainless-steel, not less than 18-gauge. 1
construction?
Must all rectangle duct connected to RTU-1 be single or
032 08/12/26 Single wall. 1
double wall construction?
033 Are Buckley es200 duct roof supports acceptable? 08/12/26 No, provide per drawings & specifications. 1
Please confirm that hardware sets on doors 137 & 135 are
correct. Door 137 (Men's room) is scheduled to have an auto Confirmed, they are correct. Power operator on Door
operator and a deadbolt (hardware set 26). The deadbolt 137 must have the ability to stop opening on resistance.
034 08/12/26 1
should be removed to prevent damaging the auto operator. Door 135 does not require a power operator per ADA
Also, door 135 has a different hardware set (28) yet should therefore has a different hardware set as indicated.
have the same intended function as door 137, please confirm.
Please confirm auto operators are specified on correct doors,
currently, operators are scheduled on aluminum doors 100 &
035 100-2. And are scheduled on hollow metal doors 104, 120, 08/12/26 Confirmed. 1
126, 128-2, 130, 137, & 120-1. Please confirm auto operators
are intended to be on these doors.
The electronic trip breaker note is not intended for every
branch circuit breaker. Standard thermal-magnetic
breakers are acceptable unless an electronic trip
breaker is specifically required by the equipment
manufacturer.
All the new panels have notes regarding "provide electronic
For Panel KP, GFCI breaker protection shall be
breakers" (note #2 drawing E500) but they don't specify on the
provided for 125V, single-phase kitchen receptacle
panel schedule which ones have to be electronic.
036 08/13/26 circuits where required by NEC. Shunt trip breakers are 1
Also, on panel KP (note #6 drawing E501) they mention
only required for kitchen equipment/receptacle circuits
Ground fault breakers and shunt trip breakers, but they really
under the exhaust hood that are required to shut down
don't specify which breakers need this.
upon activation of the hood fire-suppression system.
Final requirements to be coordinated with the approved
kitchen equipment & hood/fire-suppression submittals.
Refer to Addendum #1 for Drawing E500 & E501
revisions.
Specifications refer to window shades. I cannot locate these
037 08/14/26 Refer to Finish Key Note #04 on Drawing A211. 2
anywhere on the plans. Are they required? If so, where?
038 Does this project have SBE, WBE, MBE requirements? 08/14/26 Refer to RFI #001. 2
039 Do they having funding for the project? 08/14/26 Yes. 2
Is a project sign required? If so, please provide size and
040 08/14/26
details.
Unless otherwise indicated in the project manual, Owner
041 Are we to include testing agency costs? 08/14/26 2
is responsible to retain and pay for third-party testing.
042 Is this project tax exempt? 08/14/26 Yes. 2
Are we to include building permit fees or just State of CT
043 08/14/26 Refer to A201, 3.7. 2
Education fees?
How much area is to be included with the hydraulic cement
044 08/14/26 Refer to RFI #013. 2
underlayment?
Page 2 of 6
| RFI # | QUESTION | DATE RECEIVED | RESPONSE | ADDENDUM # ISSUED |
|---|---|---|---|---|
| 045 | Please provide complete material specifications for all countertops, shelving, and cabinetry for ALL millwork scopes associated with this project. For each applicable material, please include: -Manufacturer -Product/series name -Product number -Color and/or finish -Edge treatment or edge banding requirements -Any other relevant product or installation specifications These specifications are required to ensure accurate material procurement, fabrication, and coordination. | 08/14/26 | Refer to Sections 064116, 090000, 123616, & 123661.16. | 2 |
| 046 | Drawing A113 calls for "removal of existing roofing material down to decking" in the demo construction notes. However, the description over "Roof C" calls for the existing insulation/coverboard/cementitious wood fiber deck all to remain. Which of the two should we carry? -full roof replacement + deck removal where needed -or just the removal of existing roofing membrane and additions of 1 layer of new coverboard + new EPDM membrane Does roof decks A & B have the same roof compilation as roof C? | 08/14/26 | Refer to Addendum #2 for revised Drawing A113 and Section 070150.19 for additional information. | |
| 047 | Sheet L5/1 Shows details for Playground Equipment. Confirm the owner will be contracting Kompan for supply/installation and that the contractor will only be required for coordination. | 08/14/26 | Incorrect. GC is responsible for playground equipment provision and installation. | 2 |
| 048 | Confirm the owner will be contracting the K.E.C. and the Contractor will only be required to coordinate. | 08/14/26 | Incorrect. GC is responsible for all foodservice equipment provision and installation. | 2 |
| 049 | Please confirm if the existing roof deck and structural steel has existing spray applied fire proofing. | 08/14/26 | No existing spray fireproofing. | 2 |
| 050 | Sheet S000 states to apply fire proofing to all Structural steel and Steel Roof Decking. Please confirm what rating is to met, Notes on S000 do not specifically state a rating. | 08/14/26 | Refer to RFI #015. | 2 |
| 051 | Please confirm the Contractor is not required to hold builders risk insurance. | 08/14/26 | Confirmed. | 2 |
| 052 | Please confirm the Contractor is not required to hold OCP insurance. | 08/14/26 | Confirmed. | 2 |
| 053 | At the 8/11 Walkthrough, there seemed to be more demolition completed than what is shown on the original set of drawings sent out for bidding. Are these documents intended to be updated with, updated scope for the project? | 08/14/26 | Refer to Addendum #1 for revised drawings. | 2 |
| 054 | At the 8/11 Walkthrough, it appeared that there was construction materials already on site such as Masonry items, Electrical items, etc. Are any of these items intended to be used as part of this project? If so can a list be provided of what items are to be set aside for the contractor so extra items are not provided? | 08/14/26 | ||
| 055 | When is the current demolition/abetment contractor set to complete there initial scope of work in the building? | 08/14/26 | Most of the work will be completed before the start of this project however there will be overlap, specifically regarding the doors and windows. | 2 |
| 056 | New Footing locations shown on S110, F40T (A/1), F4030 (A/2), F4030 (B/1) are shown as different sizes and or extents than what is shown on the architectural Plans Please advise the correct locations for the new footings and slab location. | 08/14/26 | Locations are the same. Architectural drawings show a wider area to account for overage and room to do footing work. | 2 |
| 057 | New Footing locations shown on S110, F40T (A/1), F4030 (A/2), F4030 (B/1) appear to be located on the face of or past the inside face of the existing exterior wall. Is there conflict with existing footings and or structures below? | 08/14/26 | Refer to 2/S200 for new footing at existing foundation detail & Addendum #2 for revised Drawing S110. | 2 |
| 058 | New Footing locations shown on S110, F4030 (B/1) appear to be located past the inside face of the exterior wall. Please provide a detail on how this footing should be poured in place with out disrupting existing construction. | 08/14/26 | Refer to 2/S200 for new footing at existing foundation detail & Addendum #2 for revised Drawing S110. | 2 |
| 059 | Sheet L-3 shows Add Alternate Design for Rain Garden Plantings. There is not alternate in the bid form and or specifications, please advise where this bid alternate should be caried. | 08/14/26 | Refer to Addendum #2 for revised Bid Form and Section 012300. | 2 |
| 060 | Demo Key Note D25 Notes Remove and replace damaged pieces of Masonry. Please quantify the amount and extent of damaged masonry to be replaced. | 08/14/26 | Refer to Addendum #2 for revised Drawing A011. |
BID RFI LOG
SILVER PETRUCELLI + ASSOCIATES
3190 Whitney Avenue | Hamden CT 06518
311 State Street | New London CT 06320
Project:Milford Boys & Girls Club Renovations
08/20/2026
State Project/Bid #: RFI Deadline:08/25/2026
08/27/26, 3:00p
S/P+A Project #:25.031 Bids Due:09/03/26, 3:00p
RFI # QUESTION DATE RESPONSE ADDENDUM #
RECEIVED ISSUED
Please provide complete material specifications for all
countertops, shelving, and cabinetry for ALL millwork scopes
associated with this project. For each applicable material,
please include:
-Manufacturer
-Product/series name Refer to Sections 064116, 090000, 123616, &
045 08/14/26 2
-Product number 123661.16.
-Color and/or finish
-Edge treatment or edge banding requirements
-Any other relevant product or installation specifications
These specifications are required to ensure accurate material
procurement, fabrication, and coordination.
Drawing A113 calls for "removal of existing roofing material
down to decking" in the demo construction notes. However,
the description over "Roof C" calls for the existing
insulation/coverboard/cementitious wood fiber deck all to
remain. Which of the two should we carry?
Refer to Addendum #2 for revised Drawing A113 and
046 -full roof replacement + deck removal where needed 08/14/26
Section 070150.19 for additional information.
-or just the removal of existing roofing membrane and
additions of 1 layer of new coverboard + new EPDM
membrane
Does roof decks A & B have the same roof compilation as
roof C?
Sheet L5/1 Shows details for Playground Equipment. Confirm
Incorrect. GC is responsible for playground equipment
047 the owner will be contracting Kompan for supply/installation 08/14/26 2
provision and installation.
and that the contractor will only be required for coordination.
Confirm the owner will be contracting the K.E.C. and the Incorrect. GC is responsible for all foodservice
048 08/14/26 2
Contractor will only be required to coordinate. equipment provision and installation.
Please confirm if the existing roof deck and structural steel
049 08/14/26 No existing spray fireproofing. 2
has existing spray applied fire proofing.
Sheet S000 states to apply fire proofing to all Structural steel
050 and Steel Roof Decking. Please confirm what rating is to met, 08/14/26 Refer to RFI #015. 2
Notes on S000 do not specifically state a rating.
Please confirm the Contractor is not required to hold builders
051 08/14/26 Confirmed. 2
risk insurance.
Please confirm the Contractor is not required to hold OCP
052 08/14/26 Confirmed. 2
insurance.
At the 8/11 Walkthrough, there seemed to be more demolition
completed than what is shown on the original set of drawings
053 08/14/26 Refer to Addendum #1 for revised drawings. 2
sent out for bidding. Are these documents intended to be
updated with, updated scope for the project?
At the 8/11 Walkthrough, it appeared that there was
construction materials already on site such as Masonry items,
Electrical items, etc. Are any of these items intended to be
054 08/14/26
used as part of this project? If so can a list be provided of
what items are to be set aside for the contractor so extra
items are not provided?
Most of the work will be completed before the start of
When is the current demolition/abetment contractor set to
055 08/14/26 this project however there will be overlap, specifically 2
complete there initial scope of work in the building?
regarding the doors and windows.
New Footing locations shown on S110, F40T (A/1), F4030
Locations are the same. Architectural drawings show a
(A/2), F4030 (B/1) are shown as different sizes and or extents
056 08/14/26 wider area to account for overage and room to do 2
than what is shown on the architectural Plans Please advise
footing work.
the correct locations for the new footings and slab location.
New Footing locations shown on S110, F40T (A/1), F4030
(A/2), F4030 (B/1) appear to be located on the face of or past Refer to 2/S200 for new footing at existing foundation
057 08/14/26 2
the inside face of the existing exterior wall. Is there conflict detail & Addendum #2 for revised Drawing S110.
with existing footings and or structures below?
New Footing locations shown on S110, F4030 (B/1) appear to
be located past the inside face of the exterior wall. Please Refer to 2/S200 for new footing at existing foundation
058 08/14/26 2
provide a detail on how this footing should be poured in place detail & Addendum #2 for revised Drawing S110.
with out disrupting existing construction.
Sheet L-3 shows Add Alternate Design for Rain Garden
Plantings. There is not alternate in the bid form and or Refer to Addendum #2 for revised Bid Form and
059 08/14/26 2
specifications, please advise where this bid alternate should Section 012300.
be caried.
Demo Key Note D25 Notes Remove and replace damaged
060 pieces of Masonry. Please quantify the amount and extent of 08/14/26 Refer to Addendum #2 for revised Drawing A011.
damaged masonry to be replaced.
Page 3 of 6
| RFI # | QUESTION | DATE RECEIVED | RESPONSE | ADDENDUM # ISSUED |
|---|---|---|---|---|
| 061 | Demo Key Note D42 Notes to Clean section of exterior masonry. Please quantity the area of masonry to be cleaned. Please explain in more detail what is to be cleaned from the masonry. | 08/14/26 | Refer to Addendum #2 for revised Drawing A011. | |
| 062 | Overhead Roll Up Doors 115-2 & 115-3. Type 3 & 4 note see schedule. The door schedule is blank in the area where the size of the doors should be noted. Please advise on the exact sizes for each door type. | 08/14/26 | Refer to RFI #007. | 2 |
| 063 | Note #4 on C-3 states all unsuitable material shall be removed and replaced at no additional cost to the owner. There does not appear to be a Geotech Report Provided. Without any additional information, how is the contractor supposed to accommodate. Please provide a report and or more detail on what soils are to be removed and the quantity of material. | 08/14/26 | ||
| 064 | The specification do not state an exact date for the Prebid RFI Deadline. Please advise when RFIs will be accepted until. | 08/14/26 | Refer to RFI #011. | 2 |
| 065 | Sheet A211 notes sleeve's for new Volleyball Nets. Is the GC responsible for providing Volleyball Nets. | 08/14/26 | No. | 2 |
| 066 | Regarding the bid time for the Milford B&G club, I was wondering if it could be extended? An extra week, 09/03, would help contractors get accurate sub pricing. | 08/17/26 | Refer to RFI #024. | |
| 067 | Are utilities (electric and water) available for construction use free of charge? | 08/17/26 | ||
| 068 | Will the building/construction site remain occupied by owner? | 08/17/26 | Refer to Section 011000, 1.3. | 2 |
| 069 | Quality assurance testing is by Owner? | 08/17/26 | Refer to RFI #041. | 2 |
| 070 | Drawing A600 SECTION DETAILS is in the drawing list but missing, please advise. | 08/17/26 | Refer to Addendum #1 for revised Drawing G001. | 2 |
| 071 | AIA A101 Exhibit A requires subcontractors to maintain the same types and limits of insurance required of the Contractor unless otherwise approved by the Owner in writing. Please confirm whether all subcontractors, regardless of trade or scope, are required to carry the full Contractor insurance limits, including the $5,000,000 umbrella/excess liability and contractor's pollution liability coverage, or provide the minimum insurance limits required for subcontractors. | 08/17/26 | All subcontractors shall maintain insurance coverage that is equal to or greater than the insurance requirements set forth in the bid & contract documents. No subcontractor may carry alternative or lesser coverage unless the City has agreed in writing to accept different insurance terms. | 2 |
| 072 | Multiple MEP/technology sections require commissioning or functional performance testing with a Commissioning Agent; however, Section 019113 "General Commissioning Requirements" is not included in the issued Project Manual. Provide the applicable commissioning specification and identify systems subject to commissioning, or confirm formal commissioning is not required. | 08/17/26 | ||
| 073 | Section 024119 references Owner-occupancy restrictions under Section 011000, and various technical sections require continuity of existing systems serving occupied areas. Confirm whether any portion of the building will remain occupied or operational during construction and identify systems/areas required to remain continuously operational. | 08/17/26 | Refer to RFI #068 and Addendum #2 for revised Sections. | 2 |
| 074 | A011 Demolition Keynote D5 requires removal and abatement of existing aluminum windows, glazing, caulking and associated components, with removal coordinated with the Owner's selected abatement contractor. No hazardous- material survey or abatement specification is included in the issued Project Manual. Provide the hazardous-material survey/report and clarify the respective abatement/removal resposibilities of the Owner's abatement contractor and General Contractor. | 08/17/26 | D5 is for reference only per the large, bold note on Drawing A011 therefore hazardous materials survey/report is not required. | 2 |
| 075 | Drawing S110 Footing Schedule identifies footing F4030 as 4'- 0" x 3'-0" x 2'-0" with reinforcing top and bottom; however, the reinforcing quantity and bar size are not provided in the schedule. Drawing S200 indicates F4030 reinforcing as (6)-#6 "A" bars and (6)-#6 "B" bars. Please confirm the reinforcing shown on S200 is the intended reinforcement for footing F4030. | 08/17/26 | All F4030 footings to follow Detail 2/S200. Refer to Addendum #2 for revised Drawing S110. | 2 |
BID RFI LOG
SILVER PETRUCELLI + ASSOCIATES
3190 Whitney Avenue | Hamden CT 06518
311 State Street | New London CT 06320
Project:Milford Boys & Girls Club Renovations
08/20/2026
State Project/Bid #: RFI Deadline:08/25/2026
08/27/26, 3:00p
S/P+A Project #:25.031 Bids Due:09/03/26, 3:00p
RFI # QUESTION DATE RESPONSE ADDENDUM #
RECEIVED ISSUED
Demo Key Note D42 Notes to Clean section of exterior
masonry. Please quantity the area of masonry to be cleaned.
061 08/14/26 Refer to Addendum #2 for revised Drawing A011.
Please explain in more detail what is to be cleaned from the
masonry.
Overhead Roll Up Doors 115-2 & 115-3. Type 3 & 4 note see
schedule. The door schedule is blank in the area where the
062 08/14/26 Refer to RFI #007. 2
size of the doors should be noted. Please advise on the exact
sizes for each door type.
Note #4 on C-3 states all unsuitable material shall be removed
and replaced at no additional cost to the owner. There does
not appear to be a Geotech Report Provided. Without any
063 08/14/26
additional information, how is the contractor supposed to
accommodate. Please provide a report and or more detail on
what soils are to be removed and the quantity of material.
The specification do not state an exact date for the Prebid RFI
064 08/14/26 Refer to RFI #011. 2
Deadline. Please advise when RFIs will be accepted until.
Sheet A211 notes sleeve's for new Volleyball Nets. Is the GC
065 08/14/26 No. 2
responsible for providing Volleyball Nets.
Regarding the bid time for the Milford B&G club, I was
066 wondering if it could be extended? An extra week, 09/03, 08/17/26 Refer to RFI #024.
would help contractors get accurate sub pricing.
Are utilities (electric and water) available for construction use
067 08/17/26
free of charge?
068 Will the building/construction site remain occupied by owner? 08/17/26 Refer to Section 011000, 1.3. 2
069 Quality assurance testing is by Owner? 08/17/26 Refer to RFI #041. 2
Drawing A600 SECTION DETAILS is in the drawing list but
070 08/17/26 Refer to Addendum #1 for revised Drawing G001. 2
missing, please advise.
AIA A101 Exhibit A requires subcontractors to maintain the
same types and limits of insurance required of the Contractor All subcontractors shall maintain insurance coverage
unless otherwise approved by the Owner in writing. Please that is equal to or greater than the insurance
confirm whether all subcontractors, regardless of trade or requirements set forth in the bid & contract documents.
071 08/17/26 2
scope, are required to carry the full Contractor insurance No subcontractor may carry alternative or lesser
limits, including the $5,000,000 umbrella/excess liability and coverage unless the City has agreed in writing to accept
contractor's pollution liability coverage, or provide the different insurance terms.
minimum insurance limits required for subcontractors.
Multiple MEP/technology sections require commissioning or
functional performance testing with a Commissioning Agent;
however, Section 019113 "General Commissioning
072 Requirements" is not included in the issued Project Manual. 08/17/26
Provide the applicable commissioning specification and
identify systems subject to commissioning, or confirm formal
commissioning is not required.
Section 024119 references Owner-occupancy restrictions
under Section 011000, and various technical sections require
continuity of existing systems serving occupied areas. Confirm Refer to RFI #068 and Addendum #2 for revised
073 08/17/26 2
whether any portion of the building will remain occupied or Sections.
operational during construction and identify systems/areas
required to remain continuously operational.
A011 Demolition Keynote D5 requires removal and abatement
of existing aluminum windows, glazing, caulking and
associated components, with removal coordinated with the
Owner's selected abatement contractor. No hazardous- D5 is for reference only per the large, bold note on
074 material survey or abatement specification is included in the 08/17/26 Drawing A011 therefore hazardous materials 2
issued Project Manual. Provide the hazardous-material survey/report is not required.
survey/report and clarify the respective abatement/removal
resposibilities of the Owner's abatement contractor and
General Contractor.
Drawing S110 Footing Schedule identifies footing F4030 as 4'-
0" x 3'-0" x 2'-0" with reinforcing top and bottom; however, the
reinforcing quantity and bar size are not provided in the
All F4030 footings to follow Detail 2/S200. Refer to
075 schedule. Drawing S200 indicates F4030 reinforcing as (6)-#6 08/17/26 2
Addendum #2 for revised Drawing S110.
"A" bars and (6)-#6 "B" bars. Please confirm the reinforcing
shown on S200 is the intended reinforcement for footing
F4030.
Page 4 of 6
| RFI # | QUESTION | DATE RECEIVED | RESPONSE | ADDENDUM # ISSUED |
|---|---|---|---|---|
| 076 | Section 042000 requires control joints in concrete masony; however, control-joint locations are not indicated on the architectural or structural drawings. Please provide required control-joint locations for new CMU construction. | 08/17/26 | Provide at 24 feet on center. Refer to 2/S401 for additional information. | 2 |
| 077 | Section 051200, Article 2.8 specifies prefabricated fireproofed building columns and references exterior columns on "line 22.2." No grid line 22.2 or corresponding prefabricated building column condition is identified on the Contract Drawings. Confirm Article 2.8 is not applicable to this project, or identify the locations where prefabricated fireproofed building columns are required. | 08/17/26 | Article 2.8 is not applicable to this project. Refer to Addendum #2 for revised Section 051200. | 2 |
| 078 | Alternate No. 2 requires acoustic wall panels in accordance with Section 098433 where indicated on the Drawings. Section 090000 identifies AWP-1 as TURF Wave Wall Scape and directs the panel size and location to the elevations and finish plans. However, the specific AWP-1 locations and extents are not clearly identified on the drawings reviewed. Please identify the exact rooms, walls, elevations, and limits of AWP-1 required under Alternate No. 2. | 08/17/26 | Refer to RFI #017. AWP is intended to be wall-to-wall, top of wall base to ceiling. | 2 |
| 079 | Demolition Note D66 exists in the Demo Scope Legend, but is not shown on plans. Please Advise if scope is in project. | 08/17/26 | D66 is for reference only per the large, bold note on Drawing A011. | 2 |
| 080 | Section 01 23 00 states that plumbing walls receiving tile in the Base Bid are indentified on A212, with Alternate No. 3 providing tile on all walls within applicable Toilet Rooms and Shower 125. The Finish Floor Plan also specifically identifies PWT-1 at certain plumbing walls; however, the toilet rooms generally carry the F02 designation, and the corresponding elevations on A451/A452 do not consistently depict wall tile. For example, Toilet 107-1 does not depict tile at the plumbing wall. Please clarify the intended wall tile scope and confirm: 1. Whether all toilet room plumbing walls are to receive PWT- 1 in the Base Bid, or only those that specifically identified with PWT-1 on the Finish Floor Plan/A212. 2. The intent of the F02 designation as it relates to Base Bid wall tile scope. 3. Alternate No. 3 is to provide PWT-1/GWT-1/GWT-2 on all remaining wall surfaces within the applicable Toilet Rooms and Shower 125. 4. Identify any walls intended to remain untiled under either the Base Bid or Alternate No. 3. | 08/17/26 | Base Bid intent is for all gypsum board plumbing walls to receive tile & CMU plumbing walls to receive epoxy paint. Alternate intent is for all toilet & shower room walls to receive tile. Tile walls in all instances are to be as indicated in 19/A451. Refer to Addendum #2 for revised Drawings. | 2 |
| 081 | Alternate No. 9 is identified as Classroom AV Equipment & Cabling; however S1 speaker symbols and ID-75 Interactove Displays are also shown in non-classroom spaces, including Teen Center Areas 109, 110, 119, and 201. Please confirm whether S1 speakers and ID-75 Interactive Displays located in non-classroom spaces are included in Alternate No. 9, or if Alternate No. 9 is limited to S1 speakers and associated AV components serving classroom systems only. | 08/17/26 | ||
| 082 | The specifications reference dampproofing and/or waterproofing; however, no dedicated specification section or clearly defined locatons are provided. Please confirm whether dampproofing and/or waterproofing is required as part of this project. | 08/17/26 | Overall dampproofing and/or waterproofing is not required however there may be instances where a manufacturer may require it per their installation. | 2 |
| 083 | Drawing A211 appears to depict LVT-4 at Toilet 107-1, Toilet 108-1, Family Restroom 105, and All-Gender 106; however Section 09 00 00 identifies PFT for Toilet Rooms and Shower Rooms. Please confirm PFT-1 is the required floor finish within Toilet 107-1, Toilet 108-1, Family Restroom 105, and All- Gender 106, and clarify whether any of these rooms are intended to receive LVT-4. | 08/17/26 | Graphic on Drawing A211 is incorrect for these rooms however the tags are correct. Refer to Addendum #2 for revised Drawing A211. | 2 |
| 084 | Sections 09 65 16, 09 65 19, and 09 68 13 specifically require hydraulic cement underlayment in accordance with Section 03 54 16; however, Section 09 65 66 for RSF-1 athletic flooring only references localized hydraulic-cement-based patching/leveling. Please confirm whether Section 03 54 16 hydraulic cement underlayment is required and relevant Flatness tolerance is required below RSF-1 in Multi-Purpose 112, or if only localized substrate patching/leveling per Section 09 65 66 is required. | 08/17/26 | Section 035416 is required. Refer to Addendum #2 for revised Section 096566. | 2 |

With GovernmentContracts, you can:
RFP # 927024 HVAC Upgrade Stanley T. Williams Community Center (STWCC) The Town
State Government of Connecticut
Bid Due: 9/16/2026
Apparel and Promotional Items Start Date : August 18, 2026 04:30:00 PM EDT
State Government of Connecticut
Bid Due: 9/18/2026
2027-05 HVAC Upgrades - Wilcoxson School due 09/17/2026 2027-05 HVAC Upgrades - Wilcoxson
Town of Stratford
Bid Due: 9/17/2026
2027-04 Property Redevelopment of former Ella T. Grasso Regional Center due 09/30/2026 2027-04
Town of Stratford
Bid Due: 9/30/2026