| Location: | Arizona |
|---|---|
| Posted: | Sep 16, 2025 |
| Agency: | |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The 610 CACS requires a contractor to provide cost effective operations, maintenance, repair, and service functions for the Non-Real Property equipment on this site to a standard that prevents deterioration beyond that which results from normal wear and tear, or prevents degradation, of 610 CACS missions using life cycle maintenance practices. The plan and program shall include provisions for control and accountability of all contractor utilized vehicles, equipment, tools and materials, and furnish all labor, supervision, management, tools, materials, equipment, software, facilities, transportation, incidental engineering, and other items necessary to provide the services for the 610 CACS. Broad examples of contractor responsibilities include, but are not limited to, Hardness Maintenance / Hardness Surveillance, Facility Related Control Systems, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, emergency power systems including generators, paralleling switchgear, automatic transfer switches and Uninterruptable Power Supplies, electrical, fire alarm/suppression/mass notification, structural, alarms, roofing maintenance and repair, and work request management.

With GovernmentContracts, you can:
...Demolition. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, and Stream..., guardrails, etc.); ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 2/13/2028
...of the City. Qualified firms must have the ability to * Emergency HVAC ...
City of Kingman
Bid Due: 7/28/2026
...engineering equipment. Water: Specialized utility trucks, vacuum excavators, and emergency repair vehicles...
City of Tucson
Bid Due: 8/05/2026
...of Tucson's comprehensive response to the Climate Emergency declared in 2020 and ongoing ...
City of Tucson
Bid Due: 4/10/2030