| Location: | Florida |
|---|---|
| Posted: | Jul 20, 2025 |
| Due: | Aug 11, 2025 |
| Agency: | City of Dania Beach |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: DIRECTIONAL BORING AND ELECTRICAL UTILITY INSTALLATION, PHASE III
Addenda: 0
Release Date: 7/18/2025
Due Date: 8/11/2025
The purpose of this project is to complete Phase III of the Holiday Lighting Power initiative by installing underground electrical utility infrastructure through directional boring. This infrastructure will support the operation of holiday lighting displays in designated public areas, (medians on Dania Beach Blvd). The selected contractor will be responsible for all labor, equipment, materials, permitting, and coordination necessary to perform the work. This scope includes two (2) medians consisting of two combined medians on Dania Beach Blvd. The two medians are the 7th and 8th median starting from US-1 going East.

With GovernmentContracts, you can:
...Project ID: Title: Directional Boring & Hand Trenching Addenda: 0 Release Date: 5/15/2026 ...
Pinellas County Schools
Bid Due: 6/12/2026
...Admin Title Directional Boring & Hand Trenching Secondary Contact Number 26-CD-024 Tertiary Contact... ...
Pinellas County School Board
Bid Due: 6/12/2026
...Admin Title Directional Boring & Hand Trenching Secondary Contact Number 26-CD-024 Tertiary Contact... ...
Polk County Public Schools Facilities and Operations
Bid Due: 6/12/2026
...surveys, soil borings, geotechnical analysis and reports, environmental surveys and studies...
DEPT OF DEFENSE
Bid Due: 6/08/2026