| Location: | Florida |
|---|---|
| Posted: | Jul 20, 2025 |
| Due: | Aug 11, 2025 |
| Agency: | City of Dania Beach |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: DIRECTIONAL BORING AND ELECTRICAL UTILITY INSTALLATION, PHASE III
Addenda: 0
Release Date: 7/18/2025
Due Date: 8/11/2025
The purpose of this project is to complete Phase III of the Holiday Lighting Power initiative by installing underground electrical utility infrastructure through directional boring. This infrastructure will support the operation of holiday lighting displays in designated public areas, (medians on Dania Beach Blvd). The selected contractor will be responsible for all labor, equipment, materials, permitting, and coordination necessary to perform the work. This scope includes two (2) medians consisting of two combined medians on Dania Beach Blvd. The two medians are the 7th and 8th median starting from US-1 going East.

With GovernmentContracts, you can:
...Project: AS NEEDED UNDERGROUND UTILITY LOCATING AND BULK ASSET INVENTORY COLLECTION SERVICES Ref... ...
Pasco County
Bid Due: 6/30/2026
...Project: Waverly Road Sidewalk Improvements Project Ref. #: IFB-048-26-CPW Department: UNDERGROUND... UTILITIES & ...
City of Tallahassee
Bid Due: 7/09/2026
...Project: Magnesium Hydroxide-Rebid Ref. #: IFB-067-26-CPW Department: UNDERGROUND UTILITIES &...
City of Tallahassee
Bid Due: 6/16/2026
...underground HDPE drainage pipelines, in various diameters, and concrete catch basins and manholes... ...
Town of Davie
Bid Due: 6/24/2026