| Location: | Vermont |
|---|---|
| Posted: | Jul 28, 2026 |
| Due: | Aug 25, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Windsor Keywords: Construction (Non Building), Bridge Repair and Construction, General Contractor Bid Description: Replacement of an existing water main line along Elm Street in Woodstock, Vermont. Specifically, the work will include trenching, removal of the existing asphalt and subbase, installation of water main, thrust blocks, valves, securing below the existing bridge structure, installation of roadway base and pavement patch and associated site work in accordance with the contract plans and specifications. All work outside of the bridge will be completed as night work. Alternate 1 includes sandblasting, cleaning, and painting of the bridge.
|
||||||||||||||||||||

With GovernmentContracts, you can:
...Linens & Towels Rental & Cleaning Request Date: 8/31/2026 7:53:17 AM Open Date: ...
State Government of Vermont
Bid Due: 9/10/2026
...; Cleaning 09/03/2026 03:00PM 09/10/2026 04:30PM Department of Buildings and General Services Office... ...
State of Vermont
Bid Due: 9/10/2026
...Mountain National Forest. Work includes but is not limited to cleaning and preparing ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/03/2026
...to cleaning and preparing the existing concrete and wingwall surface; drilling and grouting ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/03/2026