| Location: | Vermont |
|---|---|
| Posted: | Jul 28, 2026 |
| Due: | Aug 25, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Windsor Keywords: Construction (Non Building), Bridge Repair and Construction, General Contractor Bid Description: Replacement of an existing water main line along Elm Street in Woodstock, Vermont. Specifically, the work will include trenching, removal of the existing asphalt and subbase, installation of water main, thrust blocks, valves, securing below the existing bridge structure, installation of roadway base and pavement patch and associated site work in accordance with the contract plans and specifications. All work outside of the bridge will be completed as night work. Alternate 1 includes sandblasting, cleaning, and painting of the bridge.
|
||||||||||||||||||||

With GovernmentContracts, you can:
...Springfield Water Service Hydroexcavation Request Date: 10/12/2026 7:21:23 AM Open Date: Closing... 56 ...
State Government of Vermont
Bid Due: 11/06/2026
...of the Main and Stevens Branch of the Winooski), along with the removal ...
City of Montpelier
Bid Due: 10/30/2026
..., Construction (Non Building) Bid Description: Constructing water main line along Meadowbrook Drive... ...
State Government of Vermont
Bid Due: 11/19/2026
...Mountainside Resort Interconnection with Stowe Water System Request Date: 10/1/2026 1:23:28 PM...: WESTON ...
State Government of Vermont
Bid Due: 10/30/2026