| Location: | Vermont |
|---|---|
| Posted: | Jul 28, 2026 |
| Due: | Aug 25, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Windsor Keywords: Construction (Non Building), Bridge Repair and Construction, General Contractor Bid Description: Replacement of an existing water main line along Elm Street in Woodstock, Vermont. Specifically, the work will include trenching, removal of the existing asphalt and subbase, installation of water main, thrust blocks, valves, securing below the existing bridge structure, installation of roadway base and pavement patch and associated site work in accordance with the contract plans and specifications. All work outside of the bridge will be completed as night work. Alternate 1 includes sandblasting, cleaning, and painting of the bridge.
|
||||||||||||||||||||

With GovernmentContracts, you can:
...Follow White River Junction HVAC Filter Delivery and Installation BPA Active Contract Opportunity... ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 9/25/2026
...and Maintenance Place of Performance: White River Junction , VT 05009 USA Description ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 9/21/2026
...OVER WILLIAMS RIVER AT MILE POST 17.10 REPLACE EXISTING STONE FILL PLACED AFTER ...
State Government of Vermont
Bid Due: 10/09/2026
...with the Specifications on file in the office of the Department of Public ...
City of Montpelier
Bid Due: 10/16/2026