| Location: | Kansas |
|---|---|
| Posted: | Aug 24, 2026 |
| Due: | Sep 3, 2026 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 12FPC126Q0050 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The United States of America, acting through the United States Department of Agriculture’s Natural Resources Conservation Service (NRCS), purchases conservation easements to assist the landowners in restoring, protecting and enhancing wetlands. These lands may be placed under a conservation easement through the Agricultural Conservation Easement Program -Wetland Reserve Easement Component (ACEP-WRE).
The purpose of ACEP-WRE is to protect, restore, and enhance the functions and values of wetland ecosystems and lands enrolled are farmed or converted wetlands, former or degraded wetlands, agricultural lands that altered by flooding or soil saturation and water table elevation as a result of offsite or subsurface hydrologic changes, riparian areas, or land currently or previously enrolled in the conservation reserve program (CRP). Previously restored lands and adjacent lands are also included in the areas enrolled in ACEP-WRE.
NRCS plans to obtain an Areawide Market Analysis (AWMA) for an initial fiscal year (FY) and subsequent annual recertifications or AWMA amendments for each following FY not to exceed 4 additional years beyond the base year.

With GovernmentContracts, you can:
...Event Name NGS 2nd tier analysis, dried blood spots for LD Business Unit ...
State Government of Kansas
Bid Due: 10/13/2026
...-foot by 4-foot reinforced concrete box. No hydrologic or hydraulic analysis was completed ...
City of Salina
Bid Due: 9/18/2026
...Consultant to assist KCC in analysis of environmental impacts of the Evergy electric ...
State Government of Kansas
Bid Due: 9/22/2026
...will include conducting a job analysis, developing need-to-know criteria, developing and coordinating...
State Government of Kansas
Bid Due: 9/30/2026