| Location: | Maryland |
|---|---|
| Posted: | Nov 6, 2026 |
| Due: | Nov 24, 2026 |
| Agency: | Cambridge city |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 10152026 |
| Publication URL: | To access bid details, please log in. |
| Bid Number: |
10152026
|
| Bid Title: |
CAMBRIDGE CREEK INTERCEPTOR SEWER REHABILITATION
|
| Category: | Engineering Division |
| Status: | Open |
|
REQUEST FOR PROPOSALS
ENGINEERING SERVICES
CAMBRIDGE CREEK INTERCEPTOR SEWER REHABILITATION
CAMBRIDGE, MARYLAND
SECTION I: INTRODUCTION
The City of Cambridge, Maryland is soliciting proposals from qualified engineering firms for design
services related to the rehabilitation of the Cambridge Creek Interceptor Sewer consisting of
approximately 6,200 linear feet of 21", 24", 27" and 30" gravity sewer main and approximately 35
manholes. See Attachment A- Sewer Map showing the proposed project limits.
SECTION II: BACKGROUND INFORMATION
The Cambridge Creek Interceptor was constructed around 1935 and consists of vitrified clay pipe
and brick manholes. It conveys wastewater from approximately one-third of Cambridge residents,
as well as the Downtown business core, to the Trenton Street pumping station. As indicated on
Attachment A- Sewer Map, the line begins in the City's West End area and runs along the Choptank
River to High Street. It then turns and runs in a southern direction along the west side of Cambridge
Creek, around the head of the creek, and then in a northerly direction along the east side of the
creek to the Trenton Street pumping station. The interceptor is approximately 11,200 linear feet
long, starting as a 10" sewer and increasing in size to a 30" sewer where it terminates at the
pumping station. The City has previously replaced approximately 4,100 linear feet of sewer from
Talbot Avenue to High Street and approximately 900 linear feet within the Deep Harbour
development. This project would consist of rehabbing the remaining 6,200 linear feet of sewer. Due
to the location and depth of the sewer, slip lining the preferred method of
sewer line rehab. Part of the design will include an evaluation of the sewer lines and manholes
utilizing CCTV inspection, sonar profiling and laser porro pfiilpineg bursting atore the best option
for sewer line rehab and to determine whether the manholes can be repaired in place or need to be
replaced. in order determine
SECTION III: SCOPE OF SERVICES
Proposals should include all services necessary to obtain construction bids and provide
a contractor with all information needed to complete the proposed construction project.
Services shall include, but may not be limited to, sewer system investigation, survey work,
utility design, permitting, preparation of detailed construction contract plans and
specifications and cost estimating.
Sewer System Investigation and Preliminary Engineering Services:
Pre-Design Meeting- A meeting will be held between the consultant and City staff to clarify
project design objectives.
-1 -
Sewer System Investigation- The consultant shall be responsible for an evaluation of the
condition of all of the existing sewer lines and manholes utilizing CCTV inspection, sonar
profiling and laser profiling methods. The City hopes that this integrated approach will
allow for a complete condition assessment in a single pass, without the need for bypass
pumping or a full cleaning. (See Attachment B- Sewer System Inspection Specs).
Site Survey and Utility Information- The City will provide aerial topography of the project
area, utility drawings, easement plats, and available sewer invert information. The
consultant shall perform additional survey work as needed for design and completion of the
construction plans. The location of underground utilities shall be confirmed by reviewing
surface evidence and by contacting the various utility companies. Test pitting by the
consultant to find or verify locations of underground utilities will not be required.
Preliminary -
Engineering Report (PER) The consultant shall p repare a PER which satisfies
the Maryland Department of the Environment funding requirements as outlined in
Attachment C. The PER will be used as a basis for final design.
Final Design Engineering Services:
Preparation of Detailed Plans and Specifications - Prepare detailed plans and specifications,
providing all information needed for bidding and construction.
Obtain any approvals or permits needed from approval from Maryland Department of the
Environment and the Dorchester County Soil Conservation District.
Final Cost Estimate- A cost estimate based on the final documents shall be prepared.
Bid Phase Services:
The consultant shall provide bid phase services, including solicitation of bids from potential
contractors, attendance at a pre-bid conference, responding to contractor questions,
issuance of addenda and review of bids. The City will be responsible for advertising the
invitation to bid.
SECTION IV: QUALIFICATIONS
A. The selected consultant shall be fully qualified in the municipal engineering field with a
minimum of ten (10) years experience in water and sewer design and completion of a
minimum of ten similar projects.
B. Significant and applicable selection criteria will include the following:
1. The professional qualifications of the firm and staff necessary for the performance
of the required service.
2. The firm's specialized experience and technical competence in the required
engineering services.
3. The firm's capacity and financial capability to accomplish the project within the
required time and cost constraints.
-2 -
4. Past performance and experience for comparable work on contracts with federal,
state and local agencies. Indicate references for which the same or similar
product/services were provided during the past 5 years.
SECTION VI: FORM OF PROPOSAL
A. All proposals shall include the following information:
1. List of similar work the firm and any sub-consultants have completed in the last five
years including the name of the project, the name and phone number of the client
contact person, and the project cost.
2. Brief resume of key personnel to be assigned to this project.
3. Description of Project Approach.
4. Lump sum, not to exceed fee to perform the Scope of Work described above, broken
down by task.
5. Anticipated schedule to complete the project (based on a December 17, 2026 notice
to proceed).
B. A copy of the proposal shall be emailed to City Engineer Joel Leifer at
jleifer@choosecambridge.com no later than 4:00 p.m. on Tuesday, November 17, 2026.
SECTION VII: EVALUATION OF PROPOSALS
A. Proposals will be evaluated based on the following criteria:
1. Experience and qualifications of firm and staff to be assigned to project
2. Quality and quantity of performances on similar projects
3. Project approach
4. Fee
5. Schedule
B. As part of the selection process, the City may choose to conduct interviews with one or
more of the consultants submitting favorable proposals.
Any questions regarding this request for proposal shall be directed to City Project Manager George
Hyde at ghyde@choosecambridge.com.
The City of Cambridge reserves the right to reject any and all bids and/or waive any informalities or
irregularities as it may deem best for its interest.
- 3 -
ATTACHMENT A
Project Map
YELLA NAMELOC
C
YELLA SNIKREP E L M
S
TS RALPOP
S
H C R U H M ILL ST
W
T T A
C T
E D
A R S T
C E M E M U
TS ECAR
G A Y S T
E S U M T S G
NI
R P
S
R U O C T
S
M
AI L LI W
VUE
DE LEA U ST T S
R E
L IG H T S P L E A
T
E R Y A V E
IR
S T T
S
253 2 N . L 4
T
6 2 0 4 .5
T S
A N T
S
M
A
9. 6 0 3 2 1 9 .3
T TS YMEDACA B R K 3 6 0
U N K E R
S
E T S Q 6. 8 21 1 6 0 .2 8. 1 9 2 .8 HIG H ST
T
4.481
2.09
8.08
13.152
5
7
.
9
M 1.444 A
PEACHBLOSSOM
AVE
R
K E T
C
A M
3 S B
3 T R
4 ID
. G
84 8 E
L
334.6 N
D
G
EVA DNALEROM 2.802
S
H
IP
4
0
5
. 6 TS
NOTNERT S L
A
N
D IN
G
L
N
S
A
IL
O VC
LIATTAC
HAYWARD
ST
E V
P
A
AI NI G RI V
ERIMORE ST
6. 1
4
5
5 9 1
S
M A R
S
H Y C V TC YA
N
W
L
R A
Y
D
A
E
W
S R E
A
.S
T
E
A
S
WEDIT
R S L N
T
S
Y R N E H
E V A
D
N A L Y R A M T S N R
Y
B
FRANKLIN
ST
H
1
3 IP
7 Y
LAKE ST
178.8
5 0
1
2. A
R
D
D
R NL
RETAWLLITS
6.
L
AURORA
ST
E
C
O
M
P
T
E
S
T
1
inch
=
300
feet
CAMBRIDGE
CREEK
240
115
Legend
Sewer Interceptor MH
30
21
24
27
ATTACHMENT B
Sewer Investigation Specs
Cambridge Creek Interceptor RFP
ATTACHMENT B
SECTION 02640 -TECHNICAL PROVISIONS FOR INSPECTION AND CLEANING
PART 1 GENERAL
1.1 SUMMARY
A. This section includes technical provisions for all sewer collection system inspection and cleaning
work.
B. Related Work Specified in Other Sections Include, but is Not Limited to, the Following:
1. Section 02650, Sanitary Sewer Line Cleaning
2. Section 02956, Sewer System Inspection
3. Section 02960, Temporary Bypass Pumping (If Needed)
1.2 PUBLIC OUTREACH
A. Contractor shall manage the efforts for access to the sewer pipes and manholes. These efforts
may include verifying easement locations, obtaining permissions, permits, and coordinating with
the public.
B. A Resident or Business Notification Letter, 2-sided (1 side English, 1 side Spanish), shall be
provided by the Contractor and approved by the City. The notification letter shall be delivered by
the Contractor, to each residence or business affected by inspection or cleaning processes, a
minimum of two business days prior to commencing work. The Notification Letter shall be hand
delivered or mailed to each affected resident or business prior to commencement of work.
C. The notice shall include a brief description of the project and what to expect during cleaning and
inspection along with contact information for questions or concerns.
1.3 SAFETY
A. General: The Contractor is responsible for completing work safely and responsible for conditions
within the job site, including safety of all persons (including employees) and property within the
job site. This requirement shall apply continuously and not be limited to normal working hours.
Additionally, maintain suitable, safe access to the premises for staff and visitors.
B. Safety Protection: The Contractor shall comply with Federal, State, and local safety and fire
codes and regulations. The Contractor shall give all notices and comply with all applicable laws,
ordinances, rules, regulations, permits, resolutions and lawful orders of any public authority
bearing on the safety of persons or their protection from damage, injury or loss. Where
requirements conflict, the most stringent requirement shall apply.
1.4 TRAFFIC MAINTENANCE AND PROTECTION - GENERAL REQUIREMENTS
A. Contractor assumes responsibility for conducting operations in a manner to ensure the safety
and convenience of all travelers and adjoining property owners within the limits of and for the
duration of the work.
B. Abide by laws and regulations of governing authorities when using public roads. If the work
requires that public roads be temporarily impeded or closed, approvals shall be obtained from
governing authorities and permits paid for before starting any work.
C. Be responsible for providing safe and expeditious movement of traffic through work zones. A
work zone is defined as the immediate areas of actual work and all abutting areas which are
02640-1
Cambridge Creek Interceptor RFP
ATTACHMENT B
SECTION 02640 -TECHNICAL PROVISIONS FOR INSPECTION AND CLEANING
used and interfere with the driving or walking public.
D. Remove temporary equipment and facilities when no longer required. Restore area to original
or specified conditions. Every precaution shall be taken to ensure that cleaning and inspection
work does not interfere with the movement of pedestrian traffic.
E. The Contractor shall be responsible for maintaining "local" traffic at all times and for notifying the
proper authorities regarding the closing of the roads.
F. The Contractor shall not begin work until standard barricades and warning signs are in an
acceptable position and the markers and signs conform to the Federal Highway Administration
(FHWA) "Manual of Uniform Traffic Control Devices for Streets and Highways" and all applicable
state and local requirements. The Contractor assumes all responsibilities and liabilities regarding
strict adherence to applicable sections for the maintenance of traffic and public safety as set
forth in the FHWA "Manual of Uniform Traffic Control Devices for Streets and Highways", and
other applicable regulations. All traffic control devices must be in place prior to starting work.
1.5 WATER USAGE FROM FIRE HYDRANTS
The City will provide access to water from a nearby fire hydrant at no cost to the Contractor.
1.6 USE OF PREMISES
A. The Contractor shall not trespass upon or in any way disturb private property without first
obtaining oral or written permission from the property Owner and/or Owner or Prime Contractor
as appropriate to do so.
B. It shall be the Contractor's responsibility to navigate labor, materials and equipment around
poles, trees, or other obstructions and to do so at their own expense.
C. The Contractor shall, at no additional expense, restore such property to the original condition.
D. The Contractor shall ensure all employees have a badge or visible identification during any time
that they are on the project site or within private property. This identification must be worn so
that it is readily recognized and readable to the public.
1.7 WORKING HOURS
A. The Contractor must complete all work such that no customer is without sewer service, unless
otherwise approved by the Owner. The Contractor must adhere to local noise ordinances or
working hours unless otherwise approved by the City.
B. The Contractor may be required to work nights or weekends to achieve the lowest depth flows
in the sewer pipes.
C. No work will be allowed on weekends or holidays except at the discretion of the Owner.
1.8 PROPERTY DAMAGE
A. The Contractor shall immediately investigate any and all reports of sewage backing up into
fixtures served by the sewer section that is being cleaned or televised.
B. The Contractor will be required to notify the City immediately if he causes any damage to private
or public property caused by activities related to this contract. The Contractor shall make repairs
and/or clean the property immediately in a timeframe that is acceptable to the City.
02640-2
Cambridge Creek Interceptor RFP
ATTACHMENT B
SECTION 02650 - SANITARY SEWER LINE CLEANING
PART 1 GENERAL
1.1 SUMMARY
A. The intent of this work is to remove debris from the sanitary sewers for successful inspection of
the sewer system. The Contractor shall furnish all labor, equipment, material, supplies and
perform all operations necessary for the cleaning of sewers. Cleanup of debris accumulated in
a manhole or access structure is included in the work. The sanitary sewers range from 21-inches
to 30-inches in diameter. Inspection methods include closed circuit television (CCTV), sonar and
laser inspections.
B. Related work specified in other sections include, but is not limited to, the following:
1. Section 02640, Technical Provisions for Inspection and Cleaning
2. Section 02956, Sewer System Inspection
3. Section 02960, Temporary Bypass Pumping Systems
1.2 DEFINITIONS:
A. Debris: Debris shall consist of dirt, rocks, bricks, gravel, sand, silt, grease, roots, sticks and other
materials that may accumulate in a sanitary sewer pipe.
B. Light Cleaning:
1. Removal of Settled Deposits
a. 8 - 15-inch diameter pipes with settled deposits less than or equal to 25% of pipe
diameter.
b. 16 - 24inch diameter pipes with settled deposits less than or equal to 15% of pipe
diameter.
c. > 24-inch diameter pipes with settled deposits less than or equal to 10% of pipe
diameter.
2. The contractor shall clean the sewer and associated manholes, including drop connection
and benches, to remove all settled deposits so the sewer is ready for inspection. This will
require unlimited number of passes of high velocity, hydro jetting, and vacuum cleaning
equipment to prepare for inspection. All debris must be removed from the sewer including
any debris that may have washed up into any service connections, drop connections or
the bench/walls of the manhole. Light cleaning does not include any root cutting or
attached deposit removal.
C. Heavy Cleaning:
1. Removal of all obstructions and settled deposits that exceed the percentages established
for light cleaning. This also includes removal of attached deposits and grease by unlimited
number of passes of specialty nozzles and/or mechanical methods including but not
limited to hydraulic cleaning, rodding, bucketing, brushing, root cutting, grease cutting,
vacuuming and flushing. This includes cutting all root balls and roots <1-inch in diameter
using special mechanical tools.
02650-1
Cambridge Creek Interceptor RFP
ATTACHMENT B
SECTION 02650 - SANITARY SEWER LINE CLEANING
2. All debris must be removed from the sewer including any debris that may have washed
up into any service connections, drop connections or the bench/walls of the manhole.
3. Cutting tap roots greater than 1-inch in diameter are not included in these services. If tap
roots greater than 1-inch in diameter are encountered, they will be paid separately.
1.3 REFERENCED DOCUMENTS
A. All work must also conform to the latest edition of the following specifications
1. Most recent version of NASSCO Sewer Pipe Cleaning Specification Guideline.
1.4 PROJECT INFORMATION:
A. The Owner will provide the Contractor with the scope and location of work.
B. The sewer shall be cleaned to such a condition that the inspection can adequately discern
structural defects, misalignments, and points of infiltration.
C. The Contractor shall protect the sanitary sewer lines/manholes from damage as a result of the
cleaning operation. This also includes protecting public/private site and access. Sanitary sewer
lines/manholes or site damaged as a result of the Contractor's improper operations shall be
promptly repaired by the Contractor at no cost to the Owner.
D. Contractor shall immediately notify owner if any of the cleaning activities result in deterioration
of the pipe and possibly result in sewer collapse. Owner shall decide if the cleaning operation
needs to continue or be stopped.
E. Contractor is responsible to comply with all local, state and federal permitting requirements
associated with the cleaning operation.
PART 2 EXECUTION
2.1 GENERAL
A. Sanitary sewer lines shall be cleaned by accessing the pipe from the downstream manhole.
Cleaning should take place in the downstream direction only, while pulling back the nozzle.
B. The Contractor shall monitor the effluent from cleaning operations and abandon cleaning if
excessive sand and gravel are encountered. Once the source has been located and potential
drainage to the pipe mitigated, cleaning may resume.
C. If an obstruction is encountered preventing the equipment from traversing the entire pipe section,
cleaning operations shall be paused and the Contractor shall perform an investigation in
accordance with Section 02956.
1. If an obstruction is found which requires immediate repair (e.g. collapsed pipe) the
Contractor shall notify the Owner and abandon any further action for the pipe section.
2. If the obstruction does not require immediate action by the Owner (e.g. a protruding
lateral), the Contractor shall perform a television inspection.
3. If the need to perform heavy cleaning is identified, the Contractor shall perform the heavy
cleaning as specified below.
02650-2

With GovernmentContracts, you can:
...Editing column ID Title Status Due / Close Date Publish Date Main Category ...
State Government of Maryland
Bid Due: 1/01/2028
...: 10/7/2027 Publish Date: 9/8/2025 10:03:58 AM Main Category: Water and sewer utilities ...
State Government of Maryland
Bid Due: 10/07/2027
...Id Title Status Due/Close Date Main Category Solicitaion Type Issuing Agency eMM ID ...
State Government of Maryland
Bid Due: 3/30/2029
...ID: BPM059309 Title: Fruitland Sewer Extension Preliminary Engineering Report Status: Open Due... / ...
State Government of Maryland
Bid Due: 12/02/2026