CUNY Medgar Evers College – AB1 Domestic Hot Water System Upgrade and AsbestosAbatement (EOI: For Minority and Women-Owned Business Concerns only)

Location: New York
Posted: Sep 16, 2026
Due: Oct 15, 2026
Agency: State Government of New York
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 363180 / C1858
Publication URL: To access bid details, please log in.
CUNY Medgar Evers College – AB1 Domestic Hot Water System Upgrade and AsbestosAbatement (EOI: For Minority and Women-Owned Business Concerns only)
Solicitation #: 363180 / C1858
Issue Date: 09/16/2026
Proposal Due: 10/15/2026 - 2:00 PM
Classification: Construction Contracts
Type: Expression of Interest (EOI)
Status: New
Subcontracting Provisioning Goals (%)
Minority Owned: 18
Women Owned: 12
Service Disabled Veteran Owned: 6
Equal Employment Opportunity: 45
Contract Terms
March 9, 2028
Location Where Goods to be Delivered or Service Performed
Medgar Evers College, 1638 Bedford Avenue Brooklyn, NY 11225
RFQ Note
Firms shall provide one (1) copy in PDF format of the EOI package via e-mail to ccontracts@dasny.org by 2:00PM on 10/15/2026. Only those Expression of Interest packages in the hands of DASNY, from Minority and Women-Owned Business Concerns as defined under the Small Business Concerns Set Aside Program, in accordance with Article 8, Title 4A, 4B, and 4C of the Public Authorities Law of the State of New York, will be considered. Minority firms must be certified by Empire State Development – New York State Government (ESD).

CUNY Medgar Evers College – AB1 Domestic Hot Water System Upgrade and Asbestos Abatement (EOI: For Minority and Women-Owned Business Concerns only)

THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY

See the Eligibility Requirements further down in this document.

The scope of work includes the removal of two dual-fuel (gas and #2 fuel oil) domestic hot water tanks and associated valves, fittings, and appurtenances in the Academic Building 1 boiler room. The removal includes all the associated piping for the cold water, domestic water, hot water supply, gas, fuel oil, breeching, and drains. The removal of all electrical wiring and conduits from the equipment. The removal of three circulating pumps, an existing mixing valve, and associated piping. Partial removal of the existing shaft from the basement to the 6th floor to allow for the installation of 3” city water and domestic hot water piping. Remove a section of the existing roof to install new heat pumps and pipe penetrations. The new work includes the installation of new 15-ton air source heat pumps at the roof level and the installation of two new hot water heaters, including circulation pumps and associated aquastat, mixing valve, cold and hot water piping, and heat tracing, including but not limited to all Plumbing, electrical, architectural, structural, demolition and mechanical connections as shown in the bid documents.

The estimated construction cost range is between $2,787,775.00 to $3,081,225.00.

Project Labor Agreement

The successful low bidder as a condition of being awarded this Contract, must execute the PLA included in the Contract Documents following the Form of Bid. The Work undertaken in connection with this Project will be governed by, and subject to the conditions set forth in the PLA. All Subcontractors of every tier, will be required to execute a Letter of Assent, included in the enclosed PLA, agreeing to be bound by the PLA. The PLA has been approved by the Building and Construction Trades Department, AFL-CIO.

Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice.

Only those bids in the hands of DASNY, from Minority and Women-Owned Business Concerns as defined under the Small Business Concerns Set Aside Program, in accordance with Article 8, Title 4A, 4B, and 4C of the Public Authorities Law of the State of New York, will be considered. Minority firms must be certified by Empire State Development – New York State Government (ESD).

Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid.

Please find links to the specifications and drawings below:

Project Manual

Drawings

General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents.

The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows:

Percent of Total Work Force (EEO):

Minority & Women Workforce Goal (for all trades) 45%

Percent of Total Contract (M/WBE):

Minority Business Enterprise Goal 18%

Women's Business Enterprise Goal 12%

Service-Disabled Veteran Owned Businesses 6%

Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid.

Firms shall provide one (1) copy in PDF format of the EOI package via e-mail to ccontracts@dasny.org .

Upon receipt, confirmation of delivery will be provided by email for each submission. If a firm does not receive confirmation of receipt, the EOI package shall be deemed not received. Firms are responsible for ensuring that confirmation of receipt is obtained and should follow up promptly if confirmation is not received.

Instructions for Submission of the EOI Packages:

Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection.

Each package shall be submitted with:

  1. A Cover Page that clearly identifies:
  • The Legal Name of the Company submitting the EOI
  • The Project Name for which the EOI is being submitted
  • The Date of Submission
  1. Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number.
  2. The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation.
  3. All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation.

Tabs must be in the following sequence:

Tab 1 – Company Profile

Provide a company profile that includes the following information:

  • Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project.
  • Date Established – When the company was founded.
  • Company Address – Primary business location.
  • Ownership Information – Name and resumes of all principal owners.
  • Client List – Summary of public and private sector clients.
  • Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers.
  • Equipment - Overview of all equipment owned by the company.
  • Self-Performed Services - Description of all services the company performs directly (not subcontracted).
  • MWBE and SDVOB Certifications – Provide a copy of the company’s MWBE and/or SDVOB certification. MWBE firms must be certified by the Empire State Development – New York State Government (ESD).

Tab 2 –Experience

Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed.

Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years.

For each project, include the following information:

  • Name of the project designer
  • Firm name and contact information
  • Project title and location/facility
  • Brief description of the project
  • Total construction cost
  • Construction start date
  • Substantial completion date
  • Indicate role as prime contractor or subcontractor
  • Percentage of the work that was self-performed

If applicable, also include a list of all DASNY projects completed within the last 5 years.

Tab 3 – Project Schedules

Provide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project.

Tab 4 – Safety Program

Provide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety.


Tab 5 – Résumés

Provide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative.


Tab 6 – Potential Subcontractors

Provide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work.


Tab 7 – Anticipated Workload

Provide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe.

Tab 8 – Experience Modification Rating

Provide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation.

Tab 9 – Bonding Capacity

Provide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements.

Tab 10 – NYS Vendor Responsibility Questionnaire

Provide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy.

Eligibility/Qualifications Requirements/Preferences:

Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY.

Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details.

In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and ccontracts@dasny.org . Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website ( www.dasny.org ) for Authority policy and procedures regarding this law, or the OGS website ( www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil ) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

Primary Contact

Norberto Dolores

Field Representative

Dormitory Authority of the State of New York

Downstate Construction

DASNY Field Office Trailers

2900 Bedford Avenue

Brooklyn, NY 11210

United States

Phone: 718-421-2621

Email: ndolores@dasny.org

Submit To Contact

Joshua Powers

Sr. Procurement Administrator

DASNY

Procurement

515 Broadway

Albany, NY 12207

United States

Phone: 5182573341

Email: ccontracts@dasny.org

Attachment Preview

515 BROADWAY ALBANY, NY 12207-2964 518.257.3000 28 LIBERTY STREET 55TH FLOOR NEW YORK, NY 10005-1400 212.273.5000 800.992.2788 6047 TRANSIT ROAD SUITE 103 EAST AMHERST, NY 14051 716.566.4400 3495 WINTON PLACE BUILDING C, SUITE 1 ROCHESTER, NY 14623 585.450.8400
THESE DOCUMENTS CONTAIN POTENTIALLY SENSITIVE INFORMATION AND SHALL BE USED FOR THEIR INTENDED PURPOSE. ONCE THE INTENDED PURPOSE HAS CEASED, THE DOCUMENTS SHALL BE DESTROYED IN A SECURE MANNER. IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS, DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT (C) 2022

PROJECT MANUAL
MEDGAR EVERS COLLEGE - AB1
Domestic Hot Water System
Upgrade and Asbestos Abatement
Medgar Evers College
515 BROADWAY
1638 Bedford Avenue
ALBANY, NY 12207-2964
518.257.3000
Brooklyn, NY, 11225
28 LIBERTY STREET
55TH FLOOR
NEW YORK, NY 10005-1400
212.273.5000
800.992.2788 DASNY PROJECT NUMBER: 3631809999
Click here to enter text.
6047 TRANSIT ROAD
SUITE 103
EAST AMHERST, NY 14051 DATE: 0 0 3 9 / /1 2 0 8 / / 2 2 0 0 2 2 5 5
716.566.4400
BID DOCUMENTS
NOT FOR CONSTRUCTION
3495 WINTON PLACE
BUILDING C, SUITE 1 VOLUME 1 1
OF
ROCHESTER, NY 14623
585.450.8400
Willdan
629 Fifth Avenue
Pelham, NY, 10803
914-633-6490
Seals & Signatures
THESE DOCUMENTS CONTAIN POTENTIALLY
SENSITIVE INFORMATION AND SHALL BE USED FOR
THEIR INTENDED PURPOSE. ONCE THE INTENDED
PURPOSE HAS CEASED, THE DOCUMENTS SHALL BE
DESTROYED IN A SECURE MANNER.
IT IS A VIOLATION OF STATE EDUCATION LAW FOR
ANY PERSON, UNLESS UNDER THE DIRECTION OF A
LICENSED ARCHITECT/ENGINEER TO ALTER THIS
DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE
THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF
THE ALTERATIONS, DATE AND
ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT
(C) 2022

AB-1 Domestic Hot Water System Upgrade
Medgar Evers College
JDE# 3631809999
TABLE OF CONTENTS
VOLUME I OF I
DIVISION 00 - CONSTRUCTION FRONT END DOCUMENTS
Cover Page - Construction Bidding Requirements
Notice to Bidders
Information to Bidders
Form of Bid
Schedule of Values
Omnibus Procurement Certification
W-9 Form
Bid Bond
Cover Page - Construction Contract Forms
Scope Verification Form
Insurance Form (draft)
Agreement (draft)
Payment Bond (draft)
Performance Bond (draft)
Cover Page - Construction General Conditions
General Conditions
Prevailing Wages Rates
Hazardous Materials Report
DIVISION 01 - GENERAL CONDITIONS
011200 Contract Summary of Work
012900 Payment Procedures
013100 Project Management and Coordination
013200 Project Scheduling - Single Prime
013300 Submittal Procedures
014000 Quality and Code Requirements
014000A Statement of Special Inspections
015000 Temporary Facilities and Controls
016000 Product Requirements
017329 Cutting and Patching
017419 Construction Waste Management
017700 Contract Closeout Requirements
017823 Operation and Maintenance Data
017839 As Built Documentation
019113 General Commissioning Requirements
DIVISION 02 - HAZADOUS MATERIALS
024100 Selective Demolition Removals
028200 Asbestos Removal
028700 Universal Waste Removal
TABLE OF CONTENTS TOC - 1

AB-1 Domestic Hot Water System Upgrade
Medgar Evers College
JDE# 3631809999
DIVISION 03 - CONCRETE
032500 Concrete Anchors
DIVISION 05 - METALS
051200 Structural Steel Framing
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 Rough Carpentry
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
075100 Built Up Roofing
078400 Firestopping
079200 Joint Sealants
DIVISION 08 - OPENINGS
081100 Hollow Metal Doors and Frames
087100 Door Hardware
DIVISION 09 - FINISHES
092100 Gypsum Board Systems
099000 Painting
DIVISION 22 - Plumbing
220513 Comon Motor Requirements for Plumbing Equipment
220519 Meters and Gauges for Plumbing Piping
220523.12 Ball Valves for Plumbing Piping
220523.14 Check Valves for Plumbing Piping
220529 Hangers and Supports for Plumbing Piping and Equipment
220533 Heat Tracing for Plumbing Piping
220553 Identification for Plumbing Piping and Equipment
220719 Plumbing Piping Insulation
220800 Commissioning of Plumbing
221116 Domestic Water Piping
221119 Domestic Water Piping Specialties
221123.21 Inline, Domestic Water Pumps
223400 Fuel-Fired, Domestic-Water Heaters and Storage Tanks
223600 Air to Water Heat Pumps
DIVISION 23 - HVAC
230800 Commissioning of HVAC
230923 Direct Digital Control (DDC) System for HVAC
230923.14 Flow Instruments
230923.23 Pressure Instruments
230923.27 Temperature Instruments
231123 Facility Natural Gas Piping
232913 Enclosed Controllers
235123 Gas Vents
TABLE OF CONTENTS TOC - 2

AB-1 Domestic Hot Water System Upgrade
Medgar Evers College
JDE# 3631809999
DIVISION 24 - COMMISSIONING
240100 Commissioning Requirements
DIVISION 26 - ELECTRICAL
260501 Basic Electrical Materials And Methods
260519 Low-Voltage Electrical Power Conductors and Cables
260526 Grounding and Bonding for Electrical Systems
260529 Hangers and Supports for Electrical Systems
260533 Raceway And Boxes For Electrical Systems
260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling
260553 Identification for Electrical Systems
262416 Panelboards
260800 Commissioning of Electrical
262813 Fuses
262816 Enclosed Switches and Circuit Breakers
End of Table of Contents
TABLE OF CONTENTS TOC - 3

Construction Bidding Requirements
ALBANY (HEADQUARTERS): 515 Broadway, Albany, NY 12207 | 518-257-3000 DASNY
BUFFALO: 6047 Transit Road, Suite 103, East Amherst, NY 14051 | 716-566-4400 WE FINANCE, DESIGN & BUILD
NEW YORK CITY: 28 Liberty Street, Fl 55, New York, NY 10005 | 212-273-5000 NEW YORK'S FUTURE.
ROCHESTER: 3495 Winton Place, Building C, Suite 1, Rochester, NY 14623 | 585-461-8400 www.dasny.org

NOTICE TO BIDDERS
PLACE HOLDER
PROJECT SPECIFIC NOTICE TO BIDDERS
TO BE PROVIDED BY DASNY CONTRACTS UNIT
UPON APPROVAL FOR BIDDING

INFORMATION FOR BIDDERS
PLACE HOLDER
PROJECT SPECIFIC INFORMATION FOR BIDDERS
TO BE PROVIDED BY DASNY CONTRACTS UNIT
UPON APPROVAL FOR BIDDING

BIDDING REQUIREMENTS for CONSTRUCTION
FORM OF BID
TO THE DORMITORY AUTHORITY OF THE STATE OF NEW YORK
(Owner)
For
(Title of Project)
Pursuant to and in compliance with the Owner's Notice to Bidders dated
and the Contract Documents relating hereto, the undersigned hereby offers to Provide all plant, labor,
materials, supplies, equipment, Allowances, if applicable and other facilities and things necessary or proper
for or incidental to the Work of:
(Contract Type or Trade)
as required by, and in strict accordance with applicable Contract Documents, including written changes
thereto, and addenda issued by the Owner and sent to the undersigned or delivered to the bidder or available
to the bidder prior to the opening of bids, whether received by the undersigned or not, for the total sum of:
(Written Dollar Amount)
($ )
(Figure Dollar Amount)
The above Written Dollar Amount is the undersigned's bid and no other number on any page submitted
with this page 1 of the FORM OF BID can be the undersigned's bid under any circumstance.
The bid may be withdrawn at any time prior to the scheduled time for the opening of bids or any authorized
postponement thereof.
If the Letter of Intent is sent or delivered to the undersigned within sixty (60) days after the date of opening
of the bids, or any time thereafter before the bid is withdrawn, the undersigned shall, within fourteen (14)
days after the date of such Letter of Intent, execute and deliver the Agreement in the form included in the
Contract Documents.
The undersigned hereby designates as the undersigned's office to which the Letter of Intent may be sent or
delivered:
Name:
Firm's Legal Name:
Street Address:
PO Box #:
City, State, Zip Code:
Phone Number:
Email Address:
FORM OF BID
December 4, 2024 Page 1

BIDDING REQUIREMENTS for CONSTRUCTION
FORM OF BID
Date of Bid Submission:
Firm's Legal Name:
New York State Department of Labor Registration Number: ____________________________________
(*Bid shall be rejected as non-responsive for failure to provide the NYS DOL registration number)
Street Address:
PO Box #:
City, State, Zip Code:
By:
(Signature of Officer)
Title:
Officer Name:
(Print)
Phone Number:
Fax Number:
E-Mail Address:
Taxpayer ID or Social Security Number:
Submit Bid to:
DASNY
Attn: CONTRACTS UNIT - BID ENCLOSED
515 Broadway
Albany, New York 12207
FORM OF BID
December 4, 2024 Page 2

Instructions for Schedule of Values Setup and Entry for PMWeb
General Instructions for 'PMWeb Contractor Entry' worksheet
1 Enable Macros, if prompted by the workbook
2 The file will be protected so that only certain information may be entered into certain worksheets.
Design Professional / DASNY Project Manager Instructions
3 Shaded cells cannot be adjusted on the 'PMWeb Contractor Entry' worksheet.
4 Complete the project information section on the 'PMWeb Contractor Entry' worksheet.
The Schedule of Values has been set up with some preset lines. Blank lines are available on the bottom. To add additional blank
5
lines, at the top of the worksheet, enter the number of blank lines needed and click the Add Lines button.
6 Enter the CSI codes in the CSI column. Select relevant specification sections per the Project Manual
7 Enter descriptions in the Description column. Use standard abbreviations.
8 Select Labor or Material (as applicable) in the Labor/Material column. Separate rows are required for Labor and Material.
9 Enter the Unit of Measure in the UM column. Select relevant unit from 'UM Codes' worksheet. Must be CAPS.
10 Enter the Quantity in the Quantity column. Use whole numbers, no decimals.
(Optional) In the Allowance/Contingency? column, select the appropriate type if the line represents a general allowance or
11
Design/Construction Contingency
(Optional) In the Hazardous? column, select Yes if the line represents existing or possible hazardous material remediation (e.g.
12 assessments, sampling, cleanups, etc.). Please note that any SOV lines indicated as Hazardous must represent 100% of the
expense. Do NOT combine Hazardous/Non-Hazardous expenses on one SOV line.
13 Enter Notes/Grouping (as applicable). This section can be used later to filter the SOV lines in PMWeb by area/location/etc.
14 The Budget Category column should have 05 entered for every row.
Contractor Instructions
15 Do not enter anything in the shaded cells on the 'PMWeb Contractor Entry' worksheet.
Review the Proposed SOV line Descriptions, Units of Measure, and Quantities if pre-filled). Update Units of Measure in the UM
16
Column (the full list on the 'UM Codes' worksheet) and any Quantities in the Quantity column.
17 Enter Unit Cost values in the Unit Cost Column. Unit Costs must be two decimal places only.
(Optional) In the Allowance/Contingency? column, select the appropriate type if the line represents a general allowance or
18
Design/Construction Contingency
(Optional) In the Hazardous? column, select Yes if the line represents hazardous material remediation (e.g. assessments,
19 cleanups, etc.). Please note that any SOV lines indicated as Hazardous must represent 100% of the expense. Do NOT combine
Hazardous/Non-Hazardous expenses on one SOV line.
The Total Scheduled Value will auto-calculate based on the Schedule of Value lines below. The Total Scheduled Value should
20
match the Contract Value field (an error message will appear next to the Total Scheduled Value field if that is not the case).
21 Return the completed SOV excel workbook to the DASNY Project Manager.
1

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...R.J. Metzger Webster WTP Wood Stave Tanks Liner Replacement Click here for details. ...

Monroe County Water Authority

Bid Due: 10/30/2026

...CUNY Queens College Hot Water Storage Tank Replacement and Asbestos Abatement Solicitation... Storage ...

State Government of New York

Bid Due: 11/17/2026

...04 Title: CUNY Queens College Hot Water Storage Tank Replacement and Asbestos Abatement ...

The New York State Contract Reporter

Bid Due: 11/17/2026

...portions of the tank. The scope of OH-CP3 also includes installation of all ...

City of New York

Bid Due: 11/17/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.