| Location: | Washington |
|---|---|
| Posted: | Sep 9, 2025 |
| Due: | Oct 14, 2025 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-2021-0030 |
| Publication URL: | To access bid details, please log in. |
Project Description: This Work consists of improvements to the existing force main, including temporary
erosion control measures, traffic control as necessary, installation of new air/vacuum
release valves at one location along the force main alignment within a new concrete vault,
connection to the existing force main by hot tap, installation of an odor control canister,
all piping, valves, and fittings associated with the air/vacuum valves and odor canister,
and the decommissioning of nine existing valves along the force main alignment with the
use of carbon fiber wrap and other items as shown in the Contract Drawings and
Specifications.

With GovernmentContracts, you can:
...Project ID: Title: Northwest Landing Pump Station Addenda: 4 Release Date: 5/20/2026 Due ...
Pierce County
Bid Due: 6/12/2026
...the existing motor control center in the pump station to contractor provided electrical ...
Pierce County
Bid Due: 6/10/2026
...: This Contract provides for the installation of lighting and lighting controls, at ...
City of Vancouver
Bid Due: 6/23/2026
...units to provide independent and adequate temperature control for four crew duty rooms ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 7/03/2026