Encino Park Water Transmission Main

Location: Federal
Posted: May 15, 2026
Due: May 27, 2026
Agency: San Antonio Water System
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: PS-00194-RL
Publication URL: To access bid details, please log in.
Encino Park Water Transmission Main
Solicitation No. PS-00194-RL

Status: Currently Accepting Submissions

Due Date: 10:00 AM Wednesday, 5/27/26

Please see Addendum 2 for update on Proposal Due Date.

Please see Addendum 1 for Responses to Questions and updated Proposal Due Date.

Request for Qualifications (RFQ)

Encino Park Water Transmission Main

The San Antonio Water System (SAWS) is has issued this Request for Qualifications (RFQ) and is accepting Statements of Qualifications (SOQs) from interested firms (Respondents) for professional engineering services for the Encino Park Water Transmission Main (“Project”), which will require the scope of services to be performed by a qualified professional engineering firm who shall provide engineering services entailing planning, engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, start-up/commissioning, and overall project management services for the design and construction of the Project.

The anticipated services will include project management and coordination, civil, surveying, permitting, geotechnical engineering, subsurface utility engineering, environmental services, archeological services, preliminary engineering, design, scheduling, cost estimating, construction management and other services as necessary for the Project.

Estimated Timeline

April 15,2026

RFQ Released
April 22, 2026, at 2:30 p.m. (CDT) In-Person Non-MandatoryPre-Submittal Conference
May 1, 2026, by 4:00 p.m. (CDT) Receipt of Written Questions Due
May 8, 2026, by 2:00 p.m. (CDT) Q&A Posted to Website
May 27 , 2026, by 10:00 a.m. (CDT) Proposals Due
May/June 2026 Proposals Evaluated
July 2026 Interviews, if necessary
September 1, 2026 SAWS Board Consideration and Award
September 2026 Non-Selection Notices Mailed
September 2026 Start Work


Non-Mandatory
Pre-Submittal

Meeting 2:30 PM, Wednesday Apr. 22, 2026

San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room C-154

Notify Me


Receive updates sent straight to your inbox.
Subscribe
Interested Firm List
Firms who have obtained the RFQ proposal.
Downloads

Not logged in
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document

Evaluation Criteria Forms (Word)


Apr. 15, 2026

Non-Mandatory Pre-Submittal Conference Presentation


Apr. 23, 2026

Redlined - Section 1. Project Information


May. 8, 2026

Addendum 1


May. 8, 2026

Addendum 2


May. 15, 2026



Questions? Please contact

Roxanne Lockhart

at 210-233-3095
|

Receive Email Updates
|

Registration Agreement

Attachment Preview

Test Title

Sub-Consultant Table

Team Experience and Qualifications

When answering the questions below, use only the space provided in this form, unless otherwise indicated. If all fields are not completed, the Respondent is at risk for being rejected due to non-responsiveness. It is not acceptable to indicate “see attached” on this form.

1) Using the table, describe your firm’s most relevant experience. Include a description of the role of any sub-consultants your firm is proposing and their experience. Any firm or sub-consultant experience provided is to be relevant to the Scope of Services requested within this RFQ.

Experience Relevant to Scope of Work

(I.E.: Trenchless technology, open cut pipeline installation, conducting preliminary archaeological and environmental reviews, etc.)

Respondent

Sub 1:

Sub 2:

Sub 3:

Sub 4:

Sub 5:

Sub 6:

Sub 7:

Sub 8:

Sub 9:

Sub 10:

Project Table

Similar Past Projects and Performance

1) Complete the table provided within the Evaluation Criteria forms identifying three (3) relevant projects of similar Scope of Services that details the entire project life cycle to the projects identified within this RFQ that were completed within the past seven (7) years. Identify key personnel, who are part of the proposed team, and their roles and responsibilities for at least two (2) of the three (3) projects.

Photos can be inserted but could hinder your availability to provide further project description within the allotted page and are not encouraged. Projects in the close-out phase with facilities in service are considered completed.

Project #1 Name:

Description.

Key Personnel (to include personnel titles and specific project

tasks).

Number of Change Orders (not requested

by the Project Owner).

Construction Contract

Value:

Project Owner

Name:

Project Owner’s

Current Phone

Number:

Project Owner’s

Current E-mail

Address:

Project #2 Name:

Description.

Key Personnel (to include personnel titles and specific project

tasks).

Number of Change Orders (not requested

by the Project Owner).

Construction Contract

Value:

Project Owner

Name:

Project Owner’s

Current Phone

Number:

Project Owner’s

Current E-mail

Address:

Project #3 Name:

Description.

Key Personnel (to include personnel titles and specific project

tasks).

Number of Change

Orders (not requested by the Project Owner).

Construction Contract

Value:

Project Owner

Name:

Project Owner’s

Current Phone

Number:

Project Owner’s

Current E-mail

Address:

Attachment III Evaluation Criteria Form

Opinions of Probable Construction Cost (OPCC) Table Similar Past Projects and Performance

(continued)

1) Using the table within the Evaluation Criteria form, provide project information for the three (3) projects submitted in section 1) of this criteria, as well as three (3) additional projects that the prime has been involved, as it relates to the accuracy of the OPCC and change orders, comparing the 100% design phase estimate to approved construction awards.

Project Name

100% OPCC –

Engineer’s Estimate

Low Responsive Bidder – Contract

Award

Percent Difference between OPCC and

Low Bid

Number of Bidders

Average of all other Bids

Const. Start Date

Const. Finish Date

Total Number Change Orders

Total Change Orders Cost

Change Orders as % of Contract

Award

Project 1

$

$

%

$

$

%

Project 2

$

$

%

$

$

%

Project 3

$

$

%

$

$

%

Project 4

$

$

%

$

$

%

Project 5

$

$

%

$

$

%

Project 6

$

$

%

$

$

%

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...of existing conditions, preparation of schematic designs, space plans, construction documents... and preparation ...

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/17/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.