| Location: | Montana |
|---|---|
| Posted: | Sep 20, 2024 |
| Due: | Oct 24, 2024 |
| Agency: | St. Louis Post-Dispatch |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Notice to Contractors Lake Saint Louis Boulevard Sidewalk Enhancement Project, Bid No. 07-21. Sealed bids for Lake Saint Louis Boulevard Sidewalk and Enhancement Project, TAP-5418(622), will be received at: 200 Civic Center Drive, Lake Saint Louis MO 63367 until 12:00 Noon (Prevailing Local Time) on the 24th day of October, at the office of the Lake Saint Louis City Clerk, and will be publicly opened and read at 2:00 P.M or soon thereafter on the same day. All bids shall be submitted in triplicate with "Bid No 07-21 Lake Saint Louis Boulevard Sidewalk and Enhancement Project" clearly labeled on envelope. The proposed work includes:_Asphalt Pavement Resurfacing, curb and gutter replacement, paver sidewalk, streetscape features and Rectangular Rapid Flashing Beacons. Plans and specifications are now on file and can be viewed at https://planroom.drexeltech.com/View/Default.aspx . Plans and specifications can be downloaded or ordered from this site for the fee listed online. Drexel Technologies, 135A Weldon Parkway, Maryland Heights, MO 63043, phone 314.872.0900. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher.The City of Lake Saint Louis hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award."All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project.A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal.The City of Lake Saint Louis reserves the right to reject any or all bids.The DBE Goal for this project is 9%. No 2nd tier subcontracting will be allowed on this project.

With GovernmentContracts, you can:
Follow NCMD SECTION 110 CULTURAL INVENTORIES Active Contract Opportunity Notice ID 140L3626Q0041 Related
INTERIOR, DEPARTMENT OF THE
Bid Due: 8/14/2026
Follow Yellowstone National Cemetery National Shrine Project Active Contract Opportunity Notice ID 36C78626B50214
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 8/27/2026
RFP Survey Term Contracts 2026-2029 The Montana Department of Transportation (MDT) is accepting
State Government of Montana
Bid Due: 8/07/2026
Bid Title: Animal Shelter Operation and Optional Lease Category: Request for Proposals Status:
City of Billings
Bid Due: 8/14/2026