| Location: | Ohio |
|---|---|
| Posted: | Aug 24, 2026 |
| Due: | Sep 21, 2026 |
| Agency: | Ohio Facility Construction Commission |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | DAS-260015 DAS-260016 DAS-260018 DAS-260021 DAS-260022 DAS-260023 |
| Publication URL: | To access bid details, please log in. |
| Publish Date | Due Date | Project Number | Owner | Authority | Project Name | Primary Service | Estimated Project Cost | Q&A | Short List | Notes | ||
| 2026/08/24 | 2026/09/21 |
DAS-260015
DAS-260016 DAS-260018 DAS-260021 DAS-260022 DAS-260023 |
Ohio Department of Administrative Services | OFCC | DAS Facility Improvements FY27 | CM-R | Various | N/A | TBD |
Request for Qualifications (CM at Risk Contract)
State of Ohio Standard Forms and Documents
Administration of Project: Ohio Facilities Construction Commission
Project Name DAS Facility Improvements FY27 Response Deadline 9/21/2026 2:00 PM local time
Project Location Central Ohio Facilities Project Number Various, See Below
City / County Columbus / Franklin Project Manager Phillip Haley / Ben Trick
Owner Dept of Administrative Services Contracting Authority OFCC
Delivery Method CM at Risk Prevailing Wages State
Publish Date 8/24/2026
No. of paper copies requested (stapled, not bound) 0 No. of electronic copies requested (PDF) 1
Submit the requested number of Statements of Qualifications (Form F110-330) directly to Jill Hoobler at
Jill.Hoobler@OFCC.Ohio.gov. See Section J of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to Jill Hoobler at Jill.Hoobler@OFCC.Ohio.gov with the project number
included in the subject line (no phone calls please). Questions will be answered and posted to Opportunities page on the
OFCC website at https://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party
submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
The Ohio Department of Administrative Services (ODAS), Office of Properties and Facilities (OPF), is seeking to engage
CM at Risk firms to provide construction management services for a range of major facility upgrades/renovations/repair
needs across its managed building portfolio. These services will support the FY 27/28 biennium funding cycle. The
buildings included in this RFQ, along with their associated project numbers, are listed following.
DAS-260015 Front Facility Improvements FY27
25 South Front Street
Columbus, Franklin County
State Funding: $12,410,000.00
Estimated Construction Cost: $10,725,000.00
DAS-260016 Riffe Facility Improvements FY27
Vern Riffe Center for Gov't and the Arts
77 South High Street
Columbus, Franklin County
State Funding: $41,350,000.00
Estimated Construction Cost: $36,100,000.00
DAS-260018 SOCC Facility Improvements FY27
State of Ohio Computer Center (SOCC)
1320 Arthur E. Adams Drive
Columbus, Franklin County
State Funding: $14,810,000.00
Estimated Construction Cost: $12,800,000.00
DAS-260021 Rhodes Facility Improvements FY27
James A. Rhodes State Office Tower
30 East Broad Street
Columbus, Franklin County
State Funding: $35,430,000.00
Estimated Construction Cost: $31,075,000.00
F170-01-2026-JAN Publish Date: 8/24/2026 Page 1 of 6
Request for Qualifications (CM at Risk Contract) continued
DAS-260022 Surface Facility Improvements FY27
Office Services Building
4200 Surface Road
Columbus, Franklin County
State Funding: $3,600,000.00
Estimated Construction Cost: $2,900,000.00
DAS-260023 NHC Facility Improvements FY27
North High Complex
35 East Chestnut Street & 246 North High Street
Columbus, Franklin County
State Funding: $24,400,000.00
Estimated Construction Cost: $21,275,000.00
Professional design services are being acquired by the Contracting Authority under a separate contract. The A/E services
include facility condition assessments which will help DAS tailor the scope of work that will be implemented via the CMR
contract(s). The exact scope of work is not yet known at this time but may include building MEP end of life/maintenance
needs, aesthetic and tenant functional upgrades, roofing repairs/replacement, facade repairs/restoration, code/ADA upgrades.
The estimated per building costs should be regarded as preliminary approximations only and are subject to significant
adjustment based on DAS prioritization of work and actual authorized capital releases. The selected CMR teams may be
requested to assist/support the A/E's facility condition assessment field work, etc.
It is anticipated that the top six (6) ranked CMR teams will be shortlisted for Proposal Request. Multiple selections of CMR
firms are planned, and selection of a CMR team for one or multiple projects (sites) will be at the sole discretion of the
Contracting Authority and the Owner. Projects and associated services may be awarded and implemented on a slightly
staggered schedule, the timelines provided in section D should be regarded as a preliminary approximation only. Each
project/site will be executed under a separate CMR best value agreement and will result in a separate construction contract.
All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or
Owner's policies and procedures.
B. Scope of Services
The selected Construction Manager at Risk ("CMR") firms, as a portion of their required Scope of Services and prior to
submitting their proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the
Agreement detailed cost components, to address the Owner's project requirements and refine the project schedule.
Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement.
As required by the Agreement, and as properly authorized, provide the following categories of services: provide
constructability review comments on documents produced by the A/E during the Schematic Design, Design Development,
and Construction Document stages; develop and maintain estimates of probable construction cost, value engineering,
project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process,
Construction and Closeout Stage.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
The preconstruction and construction services are generally described below. Subcontracts including but not limited to
Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using
a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be
based upon competitive pricing that will be reviewed by the Contracting Authority and/or Owner, the A/E and the CM. The
Contracting Authority and/or Owner shall have access to all books, records, documents and other data in the CM's
possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the
Agreement.
Preconstruction Services: The CM will work cooperatively with the Contracting Authority and/or Owner, A/E, and Project
Team, and will provide, among other services, schedule development, estimate development, Guaranteed Maximum
Price ("GMP") proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, value
engineering, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications
are at the stage of completion specified in the Agreement, such partially completed documents (the "Basis Documents")
shall be provided to the CM, together with the A/E's detailed listing of any incomplete design elements and the A/E's
F170-01-2026-JAN Publish Date: 8/24/2026 Page 2 of 6
Request for Qualifications (CM at Risk Contract) continued
statement of intended scope with respect to such incomplete elements (the "Design Intent Statement"). Contingent upon
the Contracting Authority's approval of the GMP, the parties will enter into an amendment to the Agreement establishing
the Contract Sum ("GMP Amendment"). If the proposed Contract Sum exceeds the Project Budget established for
construction, then the Contracting Authority may terminate the agreement with the CM and seek proposals from other
firms for completion of the Project.
Construction Services: The CM shall construct the Project pursuant to the construction documents and in accordance with
the schedule requirements. The CM shall hold all subcontracts and shall be fully responsible for the means and methods
of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase,
compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment,
and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All
subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-03-02. The Contracting Authority
reserves the right to approve the CM's selection of subcontractors and any supplemental terms to the form subcontract.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Project Delivery Method: Construction Manager at Risk
2. Role on Project: CMR
3. LEED Status: N/A
4. State of Ohio OFCC (Standard Documents / OAKS CI) experience
5. Maintenance of mid- & high-rise office buildings in urban environments
6. Secure Government Facilities
7. Experience with MEP systems with BAC systems
8. Experience with Building Facade Restoration
9. Experience with Fire Alarm systems
10. Experience with Tenant Buildouts / Office renovations
C. Funding / Estimated Budget
Total Project Cost $See Section A for per project costs State Funding $See Section A for per project costs
Construction Cost $See Section A for per project costs Other Funding $0.00
D. Anticipated Schedule E. EDGE Participation Goal
CM Preconstruction Services Start 04 / 27
Percent of the CM's total compensation
Construction Stage Notice to Proceed 09 / 27 excluding CM's Contingency* 5.0%
Substantial Completion of all Work 10 / 29
*Preconstruction Stage Compensation plus Contract Sum
CM Services Completed 01 / 30 minus CM's Contingency
F. Evaluation Criteria for Selection
Selection Criteria: The CM will be selected using (i) qualifications-based process during the Request for Qualifications
("RFQ") stage to develop a short list and (ii) best value process during the Request for Proposal stage. The qualifications-
based criteria for the RFQ is included in this announcement. The best value criteria used in evaluating proposals from
short listed firms will include such factors that are determined to derive or offer the greatest value to the State and Owner,
combining both qualifications and fee.
Short List: Each firm responding to this RFQ will be evaluated and selected based on its qualifications and the
qualifications and experience of the particular individuals identified as the candidate's proposed team for the Project. After
evaluating the responses to this RFQ, the Contracting Authority anticipates selection of a short list of six candidates that it
considers to be the most qualified.
Request for Proposal: The short-listed firms shall be sent a Request for Proposal ("RFP") that will invite the shortlisted
firms to submit technical and pricing proposals elaborating on their qualifications and containing their proposed
preconstruction stage compensation, construction stage personnel costs, itemized construction stage general conditions
costs, construction stage contingency percentage, and construction stage fee percentage. The short-listed candidates will
also receive (i) form of Agreement with the Contracting Authority containing the contract terms and conditions, (ii) set of
the most recent design documents and (iii) proposed Project schedule.
Pre-Proposal Meeting: Prior to submitting a response to the RFP, the short-listed firms will be invited to meet individually
with the Contracting Authority and/or Owner. The purpose of the pre-proposal meeting is to permit the short-listed firms an
F170-01-2026-JAN Publish Date: 8/24/2026 Page 3 of 6
| Qualifications Due | 9/21/2026 |
|---|---|
| RFP issued to the Short-Listed Firms | 10/16/2026 |
| Interviews | 12/7/2026 |
| Selection of CM | 12/11/2026 |
Request for Qualifications (CM at Risk Contract) continued
opportunity to ask the Contracting Authority and/or Owner questions in an individual setting to help the firms prepare their
responses to the RFP. The Contracting Authority will notify each short-listed firm to schedule individual times for the pre-
proposal meetings.
Interview: After submitting responses to the RFP, the short-listed firms will be interviewed by the Contracting Authority and
Owner. The purpose of the interview will be to meet the proposed Project team, become familiar with key personnel, and
understand the project approach and ability to meet the stated objectives for the Project. Please be prepared to discuss
with specificity the firm's capacity to conduct this work in compliance with the timetable, budget and EDGE expectations.
The Contracting Authority will notify each short-listed firm to schedule individual times for the interviews.
Selection Schedule: Tentative schedule is subject to change.
Qualifications Due 9/21/2026
RFP issued to the Short-Listed Firms 10/16/2026
Interviews 12/7/2026
Selection of CM 12/11/2026
Cancellation and Rejection: The Contracting Authority reserves the right to reject all proposals and, at any time for any
reason, cancel this solicitation, any portion of this solicitation or any phase of the Project. The Contracting Authority shall
have no liability to any proposer arising out of such cancellation or rejection. The Contracting Authority reserves the right
to waive minor variations in the selection process.
The OFCC is pursuing an initiative for state standards regarding BIM for state buildings, and some BIM may ultimately be
desired for these projects. Interested CM firms should include experience and level of training of staff related to BIM,
incorporation of team partners that have previous BIM experience, and an understanding of collaborative BIM processes,
including but not limited to the State of Ohio BIM Protocol available at the OFCC website at https://ofcc.ohio.gov.
Interested CM firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program
form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract
with and use EDGE-certified Business(es), as a part of the CM's team. The Intent to Contract and to Perform and / or
waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be attached to
the CM's Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The Intent to Contract and
to Perform form is again required at the Fee Proposal stage.
If the CM firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a completed
Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform form signed by both parties
with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business(es), by name, which will participate in the
delivery of the proposed professional services solicited in the RFQ.
Interested CM firms must indicate on their Statement of Qualifications, the locations where their services will be performed
in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D related to
providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting purchases
from or investment in any Russian institution or company. Failure to do so may cause their Statement of Qualifications to
be rejected.
F170-01-2026-JAN Publish Date: 8/24/2026 Page 4 of 6
Request for Qualifications (CM at Risk Contract) continued
G. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals should be combined into one PDF file named with the project number listed on the RFQ and your
firm's name, followed by "SOQ". Use the "print" feature of Adobe Acrobat or similar software for creating a PDF rather
than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then PDF Optimizer.
Electronic submittals are limited to a maximum file size of 25 MB.
Facsimile copies of the Statement of Qualifications will not be accepted.
Unless otherwise noted or exempt, all documents submitted to the Contracting Authority in response to this RFQ and
subsequent RFP are public and will be available for inspection at the conclusion of the selection process. The following
information shall remain confidential and will not be released: (1) Proposal Form(s), except for cost category subtotals
which will be transferred to the Best Value Rating Form; (2) Financial Capacity; and (3) Bonding/Insurance.
Proposers are requested to submit the following information in response to this RFQ within Section H of Form F110-330.
1. Summary: Provide a summary, on one page or less, describing why your firm/team is the most qualified for the
Project.
2. Bonding/Insurance: Provide evidence of capacity to provide bonding in the amount of the construction budget
(e.g. a letter from your Surety agent stating that one or more Sureties will issue Bonds in the amount of the
construction budget if your team is selected) and a copy of the firm's certificate of insurance showing the firm's
current limits of liability for commercial general liability, employer's liability, business automobile liability, and
professional liability insurance.
3. Management Systems: Describe the scheduling and cost control systems the firm would propose to use for the
Project
4. Self-Performed Work: Indicate whether the firm intends to self-perform any work on the Project through a
competitive process and, if so, the nature of the work and capability to self-perform.
5. Estimating: Demonstrated track record of performance of in-house estimating on projects comparable to the
Project.
6. Scheduling: Demonstrated track record of performance of managing projects to the original schedule.
Firms are requested to identify professional registrations, memberships and credentials including but not limited to:
LEED GA, LEED AP, LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and
construction industry credentials. Identify that information on the resume page for individual in Block 22, Section E of the
F110-330 form.
F170-01-2026-JAN Publish Date: 8/24/2026 Page 5 of 6
| Selection Criteria | Value | Score | ||||||
|---|---|---|---|---|---|---|---|---|
| 1. Primary Firm Location and Workload (Maximum 10 points) | ||||||||
| a. Proximity of firm to project site | Less than 25 miles | 5 | ||||||
| 25 miles to 50 miles | 2 | |||||||
| More than 50 miles | 0 | |||||||
| b. Amount of contracts awarded by Contracting Authority in previous 24 months | Less than $20,000,000 | 5 | ||||||
| $20,000,000 to $50,000,000 | 2 | |||||||
| More than $50,000,000 | 0 | |||||||
| 2. Primary Qualifications (Maximum 40 points) | ||||||||
| a. Project management lead | Experience / ability of project manager to manage scope / budget / schedule / quality | 0 - 10 | ||||||
| b. Project administration lead | Experience / ability to effectively administer project controls and processes | 0 - 10 | Max = 30 | |||||
| c. Technical staff | Experience / ability of technical staff to develop accurate estimates and schedules | 0 - 5 | ||||||
| d. Construction administration staff | Experience / ability of field representative to identify and solve issues during construction | 0 - 15 | ||||||
| 3. Key Consultant Qualifications (Maximum 10 points) | ||||||||
| a. Key consultants | Experience / ability of key consultants to perform effectively and collaboratively | 0 - 5 | ||||||
| b. Proposed EDGE-certified Consultant participation* | One point for every 2 percent increase in | 0 - 5 | ||||||
| Services compensation** over the EDGE | ||||||||
| participation goal | ||||||||
| 4. Overall Team Qualifications (Maximum 10 points) | ||||||||
| a. Previous team collaboration | Less than 4 sample projects | 1 | Max = 3 | |||||
| 4 to 6 sample projects | 2 | |||||||
| More than 6 sample projects | 3 | |||||||
| b. LEED*** Registered / Certified project experience | Registered LEED v4 or v4.1 projects | 0 | Max = 0 | 0 | ||||
| Certified LEED v4 or v4.1 projects | 0 | |||||||
| c. BIM project experience | Training and knowledge | 1 | Max = 3 | |||||
| Direct project experience | 3 | |||||||
| d. Team organization | Clarity of responsibility / communication demonstrated by table of organization | 0 - 2 | ||||||
| 5. Overall Team Experience (Maximum 30 points) | ||||||||
| a. Previous team performance | Past performance as indicated by evaluations and letters of reference | 0 - 10 | ||||||
| b. Experience with similar projects / delivery methods | Less than 4 projects | 0 - 3 | ||||||
| 4 to 6 projects | 4 - 6 | |||||||
| More than 6 projects | 7 - 10 | |||||||
| c. Budget and schedule management | Performance in completing projects within original construction budget and schedule | 0 - 5 | ||||||
| d. Knowledge of Ohio Capital Improvements process | Less than 3 projects | 0 - 1 | ||||||
| 3 to 6 projects | 2 - 3 | |||||||
| More than 6 projects | 4 - 5 | |||||||
| Subtotal |
CM at Risk Selection Rating Form
State of Ohio Standard Forms and Documents
Project Name DAS Facility Upgrades FY 27 - Central Ohio Sites Proposer Firm
Project Number DAS-260015, 16, 18, 21, 22, 23 City, State, Zip
Selection Criteria Value Score
1. Primary Firm Location and Workload (Maximum 10 points)
Less than 25 miles 5
a. Proximity of firm to project site 25 miles to 50 miles 2
More than 50 miles 0
Less than $20,000,000 5
b. Amount of contracts awarded by Contracting
$20,000,000 to $50,000,000 2
Authority in previous 24 months
More than $50,000,000 0
2. Primary Qualifications (Maximum 40 points)
Experience / ability of project manager to
a. Project management lead 0 - 10
manage scope / budget / schedule / quality
Experience / ability to effectively administer
b. Project administration lead 0 - 10
project controls and processes
Experience / ability of technical staff to Max =
c. Technical staff 0 - 5
develop accurate estimates and schedules 30
Experience / ability of field representative to
d. Construction administration staff 0 - 15
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 10 points)
Experience / ability of key consultants to
a. Key consultants 0 - 5
perform effectively and collaboratively
One point for every 2 percent increase in
b. Proposed EDGE-certified Consultant participation* Services compensation** over the EDGE 0 - 5
participation goal
4. Overall Team Qualifications (Maximum 10 points)
Less than 4 sample projects 1
Max =
a. Previous team collaboration 4 to 6 sample projects 2
3
More than 6 sample projects 3
Registered LEED v4 or v4.1 projects 0 Max =
b. LEED*** Registered / Certified project experience 0
Certified LEED v4 or v4.1 projects 0 0
Training and knowledge 1 Max =
c. BIM project experience
Direct project experience 3 3
Clarity of responsibility / communication
d. Team organization 0 - 2
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
Past performance as indicated by
a. Previous team performance 0 - 10
evaluations and letters of reference
Less than 4 projects 0 - 3
b. Experience with similar projects / delivery methods 4 to 6 projects 4 - 6
More than 6 projects 7 - 10
Performance in completing projects within
c. Budget and schedule management 0 - 5
original construction budget and schedule
Less than 3 projects 0 - 1
d. Knowledge of Ohio Capital Improvements process 3 to 6 projects 2 - 3
More than 6 projects 4 - 5
* Must be comprised of consulting firm(s) and NOT the lead firm - For more information on scoring this and
other criteria refer to Document F199-01 - PS Selection Rating Rubric.
** Preconstruction Stage Compensation plus Contract Sum minus Subcontracted Work, Self-performed Subtotal
Work, and CM's Contingency
*** Leadership in Energy & Environmental Design administered by Green Business Certification Inc.
Notes: Evaluator:
Name
Signature Date
F170-01-2026-JAN Publish Date: 8/24/2026 Page 6 of 6

With GovernmentContracts, you can:
...for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents ...
Ohio Facility Construction Commission
Bid Due: 9/25/2026
...for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents ...
Ohio Facility Construction Commission
Bid Due: 9/25/2026
...PM Inquiry End Date: 9/18/2026 4:00:00 PM Commodity: Public enterprises management or financial..., ...
State Government of Ohio
Bid Due: 9/28/2026
...Ohio Department of Natural Resources, Division of Oil & Gas Resources Management is ...
State Government of Ohio
Bid Due: 10/02/2026