| Location: | Idaho |
|---|---|
| Posted: | Apr 21, 2026 |
| Due: | May 6, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA489726Q0011 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This post is for market research purposes only. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests.
MHAFB is gauging the interest of total small business set aside with further potential set aside into socioeconomic categorys.
MHAFB has a requirement for design-build construction services to replace the existing Chiller and install a Buffer tank that requires a new concrete pad at Bldg 840. The following work shall be IAW with manufacture instructions in conjunction with the SOW. The following requirement will include, but not limited to, the following:
1. Dispose of the old unit and any waste materials in accordance with all environmental regulations. Base HVAC shall be given an opportunity to salvage components such as condenser motors and control boards if it does not cause a delay.
2. Prepare the existing concrete pad/structural base for the new chiller installation.
3. Install vibration isolation pads/springs as specified.
4. Install all required valves, strainers, flow switches, and instrumentation.
5. Install 5" flanged piping to tie in 500-gallon carbon steel buffer tank into chilled water system return line. Must have 2" urethane insulation with aluminum jacketing.
6. Provide BACnet integration with system chiller. (Chiller interface card provided with equipment)
7. Perform manufacturer-certified startup procedures and ensure functional system operation.
All IAW the statement of work (SOW).
The magnitude of this project is between $100,000 and $250,000.
In order to reduce chances of missed emails, the Subject line shall be "Bldg 840 Chiller Replacement Sources Sought Response"
Each company’s response to this Sources Sought shall be a maximum of 3 pages and shall include the following information:
| May 20, 2026 | [Solicitation (Updated)] Bldg 840 Chiller Replacement |
| May 23, 2026 | [Solicitation (Updated)] Bldg 840 Chiller Replacement |

With GovernmentContracts, you can:
...structural aesthetics. The scope of work may include the following: Design and fabrication... ...
ENERGY, DEPARTMENT OF
Bid Due: 8/14/2026
...shielding functions into a single, weight-optimized structural system for mobile nuclear power applications... ...
ENERGY, DEPARTMENT OF
Bid Due: 7/01/2026
...qualified vendors to provide design and installation services for entrance canopies at Buildings ...
ENERGY, DEPARTMENT OF
Bid Due: 7/31/2026
...efficiency and safety. BACKGROUND The TAN-629 hangar requires a comprehensive remodel to improve ...
ENERGY, DEPARTMENT OF
Bid Due: 9/04/2026