Docusign Envelope ID: 14BC03EB-D842-8461-8065-B00E91F882A5
II. INDEX OF CONTENTS
I. TITLE PAGE ...………………………………………..…………………………1
II. INDEX OF CONTENTS ............................................................................. 3
III. NOTICE CITY OF THORNTON REQUEST FOR CONTRACTOR
QUALIFICATIONS.......................................................................................... 5
IV. REQUEST FOR CONTRACTOR QUALIFICATIONS ............................... 9
• SECTION I – INQUIRIES ................................................................ 9
• SECTION II –SUBMITTAL DATE AND LOCATION ...................... 10
• SECTION III – CONFIDENTIAL INFORMATION .......................... 10
• SECTION IV – DEFINITION, CONTEXT, AND GENDER ............. 11
• SECTION V – CONDITIONS OF SOQ SUBMITTAL..................... 11
• SECTION VI – EVALUATION OF SOQ’s...................................... 13
• SECTION VII – EVALUATION CRITERIA..................................... 14
• SECTION VIII – INSTRUCTIONS ................................................. 16
APPENDIX A – STATEMENT OF QUALIFICATIONS FORM....................... 19
APPENDIX B – RESPONDENT’S QUALIFICATION AFFIDAVIT ................. 31
APPENDIX C – REFERENCE AUTHORIZATION AND RELEASE FORM... 33
APPENDIX D – (EXAMPLE) GENERAL CITY OF THORNTON TYPICAL
INSURANCE REQUIREMENTS................................................................... 35
APPENDIX E – ACCEPTANCE OF CONDITIONS STATEMENT ................ 41
APPENDIX F – RESPONDENT’S CERTIFICATION AFFIDAVIT ................. 43
APPENDIX G – IFB DOCUMENTS .............................................................. 45
APPENDIX H – STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND
CONSTRUCTION OF PUBLIC AND PRIVATE IMPROVEMENTS CITY OF
THORNTON – OCTOBER 2012................................................................... 47
Page 3 of 47
S:\SS\C-P\2025\25-46A Cherrywood Park\2BD\Final Bid Docs\25-46A RFQ 4-22-26
Docusign Envelope ID: 14BC03EB-D842-8461-8065-B00E91F882A5
III. NOTICE CITY OF THORNTON REQUEST FOR CONTRACTOR
QUALIFICATIONS
FOR
CHERRYWOOD PARK PLAYGROUND REHABILITATION –
CONSTRUCTION PHASE
PROJECT NO. 25-46A
Notice of Request for Contractor Qualifications: The City of Thornton (“Thornton”) is
requesting Statement of Qualifications (SOQ) submittals from Contractors
(“Respondents”) interested in bidding on Construction of the Cherrywood Park
Playground Rehabilitation – Construction Phase, Project No. 25-46A.
Thornton reserves the right to qualify Respondents based on company size, type of work,
past and present, previous experience, and other factors as Thornton deems appropriate.
Thornton will limit the number of Qualified Respondents that may be prequalified to five
Respondents. Thornton’s intent is to qualify Respondents based on their demonstrated
past performance on decorative concrete and civil complexity construction. At time of
selection of qualified vendors, Thornton will request bids for pricing from selected
contractors. Please view additional requirements which are outlined in the Request for
Qualification (RFQ).
Project Description: The project scope includes the renovation/construction of
Cherrywood Park playground and includes all site preparation, demolition/removal,
construction, procurement, installation, and site restoration as depicted in the attached
construction drawings.
• All play equipment and structures shall meet ISO 9001/ISO 14001; ASTM
standards for equipment (F1487-07a) and for use zones and must meet
current accessibility regulations.
• All equipment must meet IPEMA certifications and must follow the CPSC
Handbook for Public Playground Safety. Concrete shall conform to City of
Thornton Section 600-Concrete-4500 psi CDOT Class D concrete with fiber
mesh reinforcement and shall meet ADA standards.
• The existing concrete sidewalk and edging surrounding the playground will
be re-used unless otherwise noted. All respondents must measure and verify
the existing play area, existing stie conditions and verify that all proposed
playground equipment will work with the current site configuration including
with existing tree locations.
• Demolition and Playground Surfacing Contractor will provide the preparation
and compaction of the sub-base for the installation of new equipment and will
excavate the play area to a depth of 12-inches. Contractor will remove and
dispose of the existing EWF and equipment including below-grade
Page 5 of 47
S:\SS\C-P\2025\25-46A Cherrywood Park\2BD\Final Bid Docs\25-46A RFQ 4-22-26