| Location: | Georgia |
|---|---|
| Posted: | Apr 23, 2026 |
| Due: | May 8, 2026 |
| Agency: | HEALTH AND HUMAN SERVICES, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 75D301-26-R-73398 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility.
a. Provide all design, engineering, management, supervision, labor, materials, equipment, testing, commissioning, training, and closeout services required to modernize the B10 chilled-water plant.
b. Replace four existing 1,450-ton chillers with new 1,800-ton chillers and provide associated starters, controls, piping, isolation valves, refrigerant monitoring, and appurtenances.
c. Replace nine existing cooling tower cells with eight new cells; provide structural modifications, walkways, maintenance access, valves, piping, and roofing work required for the new configuration.
d. Replace primary chilled-water pumps, condenser-water pumps, associated starters / VFDs, and modify chilled-water and condenser-water piping as required for the new plant arrangement.
e. Perform associated medium-voltage and low-voltage electrical upgrades, BAS / controls integration, structural work, fire protection modifications, and ancillary systems work identified in Attachment A.
f. Provide phased execution that preserves campus operations; no more than two chillers may be removed from service at one time.
| Feb 4, 2026 | [Sources Sought (Original)] Chiller Replacement Roybal Campus |
| Apr 23, 2026 | [Combined Synopsis/Solicitation (Original)] Chiller Replacement Roybal Campus |
| May 11, 2026 | [Solicitation (Original)] Chiller Replacement Roybal Campus |
| May 27, 2026 | [Solicitation (Updated)] Chiller Replacement Roybal Campus |
| Jun 3, 2026 | [Solicitation (Updated)] Chiller Replacement Roybal Campus |

With GovernmentContracts, you can:
...RFPQ 26040 Water Treatment Facilities SCADA & PLC Upgrade & Integration Athens-Clarke... SCADA ...
State Government of Georgia
Bid Due: 6/09/2026
...the rehabilitation of an existing wastewater lift station, controls, bypass generator receptacle, skid/frame... ...
State Government of Georgia
Bid Due: 6/23/2026
...Project # W0301-096-01 WATER POLLUTION CONTROL PLANT IMPROVEMENTS Cairo, City Of May 11, ...
State Government of Georgia
Bid Due: 6/09/2026
...comprehensive replacement and upgrade of the building?s HVAC systems, including wall-hung and rooftop ...
State Government of Georgia
Bid Due: 7/07/2026