Weeks Middle School
Pre-Approval Advertisement
ADVERTISEMENT
Turner Construction will receive Statements of Qualification per Iowa Code Chapter 26A (also
referred to as Preapproval Forms herein) for construction of Des Moines Public Schools Weeks
Middle School Classroom Addition in Des Moines, Iowa. The project consists of a two-story,
12,898 square foot, classroom addition to the south side of the existing middle school. The
project is located at:
901 East Park Avenue, Des Moines, Iowa 50315
PREAPPROVAL FORM SUBMISSION
Statement of Qualifications Preapproval Forms must be filled out, compiled, and submitted by or
before 2:00 PM, January 14th, 2026. Any submissions received after this time will not be
accepted nor opened. All Statements of Qualification Preapproval Forms must be submitted
electronically to the Building Connected website. Submitters are to contact Elise Brooten at
ebrooten@tcco.com to request setup and access to the Building Connected website for
Preapproval Form submission. (Note, when requesting setup and access, please indicate which
package(s) you are interested in prequalifying for in your email request.)
PREAPPROVAL FORM SUBMISSION WEBINAR
A Preapproval Form Submission Webinar will be conducted on Thursday, December 18th, 2025,
for interested submitters. Contact Elise Brooten at ebrooten@tcco.com to request access to the
virtual meeting.
LISTING OF WORK SCOPE PACKAGES
Per Iowa Code Chapter 26A, Preapproval Form submissions are only being accepted at this time
for the work scope packages listed below:
BP 03.01 Concrete Foundations – scope of work to include, but not be limited to, providing
concrete formwork, concrete reinforcement, cast-in-place concrete placement and finishing,
precast embed and anchor rod placement, and excavation and backfill as required by the contract
documents for structural foundations.
BP 03.02 Concrete Flatwork – scope of work to include, but not be limited to, providing
concrete formwork, concrete reinforcement, cast-in-place concrete placement and finishing,
embed and anchor rod placement, as required by the contract documents for interior slabs on
grade, interior/exterior structural slabs, exterior stoop slabs, interior/exterior slabs on deck, and
exterior pavements or walks.
BP 05.01 Precast, Structural Steel, Steel Deck, & Metal Fabrications – scope of work to
include, but not be limited to, providing vertical and horizontal precast architectural and
structural concrete elements, structural steel framing, steel decking, metal fabrications, metal
stairs, and railings as required by the contract documents for the core and shell construction.
Page 1 of 4
Weeks Middle School
Pre-Approval Advertisement
BP 07.01 Roofing & Sheet Metal Flashing – scope of work to include, but not be limited to,
providing the composite elements associated with the thermoplastic polyolefin roofing assembly
and sheet metal flashing and trims as required by the contract documents for a finished weather-
tight roof assembly.
BP 08.03 Shutters – scope of work to include, but not be limited to, providing the tornado
resistant coiling doors as required by the contract documents for a finished tornado resistant
assembly.
BP 08.04 Aluminum Storefront, Curtainwall, & Glazing – scope of work to include, but not
be limited to, providing the glazed aluminum storefront framed assemblies, glazed curtainwall
assemblies, and interior/exterior float, insulated, spandrel, and transom glazing as required by the
contract documents for finished openings.
BP 09.01 Gypsum Board Assemblies & Acoustical Treatments – scope of work to include,
but not be limited to, providing finished non-structural metal framed gypsum board assemblies,
Portland cement and acrylic plaster finishes, acoustical tile ceilings, acoustical wall panels, and
sound-absorbing ceiling units as required by the contract documents for finished wall and ceiling
assemblies.
BP 22.01 Plumbing & Mechanical – scope of work to include, but not be limited to, providing
underground, above ground, and overhead sanitary and storm sewer and domestic water
distribution piping and valves; domestic water pumps; plumbing equipment; plumbing fixtures;
miscellaneous plumbing trims and accessories; insulated and non-insulated ductwork; ductwork
accessories; diffusers, registers, and grilles; insulated mechanical piping assemblies; power
ventilators; air terminal units; packaged outdoor make-up air units; unit heaters; and
instrumentation and controls as required by the contract documents for a complete and
operational plumbing and heating, ventilating, and air conditioning (HVAC) system.
BP 26.01 Electrical, Communications, & Electronic Safety & Security – scope of work to
include, but not be limited to, providing underground, above ground, and overhead electrical,
communications, and electronic safety and security raceways, boxes, supports, and conductors;
transformers, panelboards, fuses and circuit breakers; wiring devices; interior/exterior lighting
fixtures; structured cabling; audio-visual, public address, and clock systems; and
digital/addressable fire alarm systems as required by the contract documents for a complete and
operational electrical, communications, and electronic safety and security system.
BP 31.01 Site Demo, Earthwork, & Utilities – scope of work to include, but not be limited to,
providing site clearing, earthwork, trenching and backfilling, erosion and sediment control, and
storm sewer piping and structure assemblies as required by the contract documents for proposed
site development.
Page 2 of 4
Weeks Middle School
Pre-Approval Advertisement
DOCUMENT AVAILABILITY
Statement of Qualification Preapproval Documents may be examined at the following locations:
Hard Copy Review Location(s):
Turner Construction
4200 Corporate Drive, Suite 180
West Des Moines, Iowa 50266
*Contact ebrooten@tcco.com to set up viewing appointment.
Document Download Via Web Access:
Building Connected – Contact Elise Brooten at ebrooten@tcco.com to request access to the
Building Connected website to download documents. In your email, please indicate which
package(s) you are interested in prequalifying
Plan Room Review Location(s):
1. Des Moines Public Schools: https://www.dmschools.org/departments/business-
finance/purchasing/open-proposals/
2. Master Builders of Iowa: https://www.constructconnect.com
3. Beeline & Blue: https://www.beelineplanroom.com/
4. CityBlue Technologies: https://www.citybluetechnologies.com/
5. Turner Plan Room: https://app.buildingconnected.com/public/54f0e584a238df0800778ee6
SUBMISSION PROCEDURE
Completed Preapproval Form submissions shall only be accepted electronically via upload to the
project’s Building Connected website. Contact Elise Brooten at ebrooten@tcco.com to request
access to the Building Connected website.
SUBMISSION WITHDRAWAL
Submissions may be withdrawn by submitter upon written request any time prior to the
submission.
SUBMISSION ACCEPTANCE
The Construction Manager and/or Owner will review, and score submitted Preapproval Forms
based upon an objective scoring process and statutory criteria. Submissions meeting or
exceeding minimum scoring criteria shall be deemed as an approved bidder for the project. The
Construction Manager and/or Owner retain the right to reject any/all submission documents if
documentation is deemed flawed, incomplete, or insufficient to properly score.
All submitters must complete and submit the correct Prequalification Forms and supporting
documentation to be considered responsive.
Page 3 of 4
Weeks Middle School
Pre-Approval Advertisement
QUESTION / CLARIFICATION REQUESTS
Any/all questions are to be submitted electronically via Building Connected website. Questions
can be submitted at any time but must be submitted no later than 12:00 PM on Friday,
January 2nd, 2026. Responses to questions received will be published as a clarification
document and posted to Building Connected by 5:00 PM on Tuesday, January 6th, 2026.
Page 4 of 4
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.