| Location: | Texas |
|---|---|
| Posted: | Oct 27, 2025 |
| Due: | Dec 2, 2025 |
| Agency: | Guadalupe-Blanco River Authority (GBRA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Due to the Hillside Terrace roadway expansion, approximately 826 LF of Owner’s 24-inch ductile iron waterline will need to be relocated. The relocations include a proposed 126 LF of 36-inch steel casing pipe and 20 LF of 36-inch split steel casing and 80 LF trenchless install. The connection work shall be completed within 24 hours for the GBRA 24-inch pipeline as provided in the Sequence of Construction Notes on Sheet G1 of the Plans. Shutoff must occur during the low flow months of November to April.

With GovernmentContracts, you can:
...Project: PW - CPN 100997-1 - Sanitary Sewer M-245 Parallel Relief Pipeline Part ...
City of Fort Worth
Bid Due: 7/16/2026
...Engineering Design Services for WMP Project #4 24-inch Water Pipeline along State Highway ...
City of Irving
Bid Due: 6/12/2026
...residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable...
City of Dallas
Bid Due: 7/10/2026
...Invitation To Bid Operations- Pipeline 00500 , 01000 , 03105 , 03114 , ...
Tarrant Regional Water District
Bid Due: 6/12/2026