| Location: | Texas |
|---|---|
| Posted: | Oct 27, 2025 |
| Due: | Dec 2, 2025 |
| Agency: | Guadalupe-Blanco River Authority (GBRA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Due to the Hillside Terrace roadway expansion, approximately 826 LF of Owner’s 24-inch ductile iron waterline will need to be relocated. The relocations include a proposed 126 LF of 36-inch steel casing pipe and 20 LF of 36-inch split steel casing and 80 LF trenchless install. The connection work shall be completed within 24 hours for the GBRA 24-inch pipeline as provided in the Sequence of Construction Notes on Sheet G1 of the Plans. Shutoff must occur during the low flow months of November to April.

With GovernmentContracts, you can:
...Project: PW - 102052-3 - Westside Water Treatment Plant (WTP) WS-3 and WS-4 ...
City of Fort Worth
Bid Due: 10/01/2026
...Project ID: Title: Cedar Creek Section 4 Pipeline Replacement and Cedar Creek Lake ...
Tarrant Regional Water District
Bid Due: 9/23/2026
...Project ID: Title: Cedar Creek Section 4 Pipeline Replacement and Cedar Creek Lake ...
Tarrant Regional Water District
Bid Due: 9/25/2026
...SUPPLY FACILITIES NAICS Code: 237120 - Oil and Gas Pipeline and Related Structures ...
DEPT OF DEFENSE
Bid Due: 10/01/2026