| Location: | Texas |
|---|---|
| Posted: | Oct 27, 2025 |
| Due: | Dec 2, 2025 |
| Agency: | Guadalupe-Blanco River Authority (GBRA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Due to the Hillside Terrace roadway expansion, approximately 826 LF of Owner’s 24-inch ductile iron waterline will need to be relocated. The relocations include a proposed 126 LF of 36-inch steel casing pipe and 20 LF of 36-inch split steel casing and 80 LF trenchless install. The connection work shall be completed within 24 hours for the GBRA 24-inch pipeline as provided in the Sequence of Construction Notes on Sheet G1 of the Plans. Shutoff must occur during the low flow months of November to April.

With GovernmentContracts, you can:
...of approximately 570 LF of 72-inch sanitary sewer pipe with 90-inch steel casing ...
City of Fort Worth
Bid Due: 10/29/2026
...this contract consists of furnishing all concrete, steel, appurtenances, tools, equipment, labor... feet ...
City of Irving
Bid Due: 9/25/2026
...and outlet sides of Aeration Basins with new T-304 Stainless Steel launders. Installation ...
City of League City
Bid Due: 10/01/2026
...steel piping, guide rails, guide rail support brackets, new engineered pipe supports, etc... ...
City of League City
Bid Due: 10/01/2026