Ground Power Modernization

Location: Federal
Posted: Nov 14, 2024
Due: Nov 27, 2024
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • 61 - Electric Wire, and Power and Distribution Equipment
Solicitation No: FA8532-25-R-GPM
Publication URL: To access bid details, please log in.
Follow
Ground Power Modernization
Active
Contract Opportunity
Notice ID
FA8532-25-R-GPM
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Major Command
AIR FORCE MATERIEL COMMAND
Sub Command
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
Sub Command 2
AGILE COMBAT SYSTEMS
Office
FA8532 AFLCMC WNKAA
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Sources Sought (Updated)
  • Updated Published Date: Nov 14, 2024 11:43 am EST
  • Original Published Date: Nov 12, 2024 11:47 am EST
  • Updated Response Date: Nov 27, 2024 04:00 pm EST
  • Original Response Date: Nov 27, 2024 04:00 pm EST
  • Inactive Policy: 15 days after response date
  • Updated Inactive Date: Dec 12, 2024
  • Original Inactive Date: Dec 12, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 6115 - GENERATORS AND GENERATOR SETS, ELECTRICAL
  • NAICS Code:
    • 335312 - Motor and Generator Manufacturing
  • Place of Performance:
Description

144 kW Ground Power Unit (GPU)



The Government is conducting market research to determine an acquisition strategy to design, develop, test and produce immediately a minimal mission essential quantity of 6 144kW GPU (of a total fleet of 250) units. This includes identifying potential sources that possess the expertise, capabilities and experience to design, test, and produce a 144kW GPU for the DoD. The potential acquisition strategies being considered range from an Undefinitized Contracting Action (UCA) for a minimum mission essential quantity of 6 completed/tested units. The 6 units would be comprised of 2 prototypes to be available not later than July 30, 2025 and 4 production units to be available not later than 1 October 2026. Other options include awarding a long-term contract, to multiple contracts for design, with a down select prior to production for the balance of 244 units. The Government seeks to maximize the use of non-developmental items.



This requirement for a 144 kW/180 kilovolt-ampere (kVA) generator set, hereinafter referred to as the 144kW GPU, defined by PD21WRWZEA007, is used to provide 115/200 volts alternating current (VAC), 400 Hertz (Hz), 28.5 volts direct current (VDC), and 270 VDC external ground power, at locations world-wide, for multiple external power receptacle United States Air Force (USAF) aircraft such as the E-3, E-4, E-8, EC-130, KC-46, OC/RC-135, and other specialized aircraft for various ground-based maintenance activities. Simultaneously with all other outputs, the GPU shall be capable of providing low amperage single phase, 120 VAC, 60 Hz and low amperage three phase 208 VAC, 60 Hz. The GPU shall be the latest state of the art design and shall comply with the requirements of the Purchase Description unless specified otherwise by the governing contract.



Attached also is a Statement of Work used for the original procurement and a Purchase Description and its amendments (available upon registration) identifying the requirement for which we are seeking industry input. The USAF is seeking to maximize commercial and existing DoD technologies as much as possible. The USAF is also seeking information concerning the production capacity that currently exists.



144 kW Universal Load Bank (ULB)



The Government is conducting market research to determine an acquisition strategy to design, develop, test and produce immediately a minimal mission essential quantity of 6 144 kilo-watt (kW) ULB (of a total fleet of 300) units. This includes identifying potential sources that possess the expertise, capabilities and experience to design, test, and produce a 144kW ULB for the DoD. The potential acquisition strategies being considered range from an Undefinitized Contracting Action (UCA) for a minimum mission essential quantity of 6 completed/tested units. The 6 units would be comprised of 2 prototypes to be available not later than July 30, 2025 and 4 production units to be available not later than 1 October 2026. Other options include awarding a long-term contract, to multiple contracts for design, with a down select prior to production for the balance of 294 units. The Government seeks to maximize the use of non-developmental items.



This requirement, as defined by PD21WRWNZEA009, is for a 144 kW/180 kilovolt-ampere (kVA) ULB, hereinafter referred to as the ULB. The ULB is used as a mobile test set for periodic maintenance and troubleshooting of United States Air Force (USAF) flightline generator sets including the Ground Power Units (GPUs) defined by PD21WRWZEA008, motor generators, solid-state frequency converters, solid-state direct current (DC) power supplies, and the B-52H Stratofortress aircraft’s on-board alternating current (AC) generators. The ULB shall be the latest state of the art design and shall comply with the requirements of this document unless specified otherwise by the governing contract.



Attached is a Statement of Work used for the original procurement, and a Purchase Description (PD) and its amendments identifying the requirement for which we are seeking industry input. The USAF is seeking to maximize commercial and existing DoD technologies as much as possible. The USAF is also seeking information concerning the production capacity that currently exists.


Attachments/Links
Contact Information
Contracting Office Address
  • CP 478 222 1902 235 BYRON ST BLDG 300 STE 19A
  • ROBINS AFB , GA 31098-1670
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Nov 13, 2024[Sources Sought (Original)] Ground Power Modernization
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow 5935 - 01-678-7255 SWA5 MK48 Torpedo Receptacle (Ethernet) Active Contract Opportunity... Code: ...

DEPT OF DEFENSE

Bid Due: 6/25/2026

...Follow 5935 - 01-678-7255 SWA5 MK48 Torpedo Receptacle (Ethernet) Active Contract Opportunity... Original ...

DEPT OF DEFENSE

Bid Due: 8/06/2026

...STRUCTURES NAICS Code: 238210 - Electrical Contractors and Other Wiring Installation Contractors Place... ...

DEPT OF DEFENSE

Bid Due: 6/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.