REQUEST FOR QUALIFICATIONS
DESIGN-BUILDER FOR THE
MSU GALLATIN COLLEGE
A/E #2025-07-05
PROGRESSIVE DESIGN-BUILD PROJECT
ON THE CAMPUS OF
Montana State University
BOZEMAN, MT
Architecture & Engineering Division
Department of Administration
PO Box 200103
Helena, MT 59620-0103
State of Montana
MSU Gallatin College PDB
Request for Qualifications
© Progressive Design-Build Consulting, LLC
June 2026
Page 1
This REQUEST FOR QUALIFICATIONS (“RFQ”) from the Owner invites the submittal of a Statement of
Qualifications (“SOQ”) from firms interested in providing design-build services for the project described below. By
submitting an SOQ, the Proposer represents that it has carefully read the terms and conditions of this RFQ and all
attachments and addenda and agrees to be bound by them. This RFQ is not an offer to enter into a contract, but
merely a solicitation of persons interested in submitting SOQ to the Owner for the Project.
All submissions must be provided pursuant to the instructions below. It is the Finalist’s sole responsibility to ensure
that the required documents are delivered in the manner required by this RFQ by the Due Date and Time. Owner
has the right to reject any submissions not properly delivered.
SECTION 1
OWNER DESCRIPTION
1.1. General
Gallatin College is Montana State University’s two-year college located in Bozeman, offering two-year associate
degrees and one-year professional certificates. Gallatin College offers professional workforce programs, transfer
programs, development coursework, and dual enrollment programs that help students gain valuable skills and
advance their career opportunities or prepare for a career change. The programs include certificates that qualify
students to work in professional offices and business environments, hospitality, construction trades, aviation, and
technology.
MSU’s long-term vision for Gallatin College will respond to and meet the high-demand occupations across Montana
in both urban and rural workforce needs across our communities. Gallatin College MSU is nimble and adaptable in
launching new programs where employer needs and student interest are the highest. The flexibility and adaptability
will be important in the future as new industries and employers move to Montana with additional workforce needs
in areas that are not addressed with current education and training programming. Hence, MSU requires a facility
that is adaptable and able to strategically “flex” in response to changing workforce training needs.
SECTION 2
OVERVIEW OF PROJECT
2.1. General Description of the Project
Currently, the campus is spread out in multiple locations which often requires students to drive between the
locations. To improve the student experience, this project will consolidate the identified Gallatin College programs
into one location. A successful Project will efficiently combine the varied programs into a single space that not only
includes the current programs but also is flexible to accommodate future uses and technology as well as fluctuations
in student enrollment. Gallatin College envisions the Project as an opportunity to connect and integrate the students
of Gallatin College with MSU students currently on campus. The Project should be welcoming to both Gallatin
College students as well as students currently on the MSU campus. The Project will provide opportunities for
industry partners to provide training and act as a living training space for students. In addition, the Design-Build
Team will provide the College with achievable options to incorporate sustainable features into the Project.
This project will be the first progressive design-build project for the Owner. The selected Design-Build Team will
be able to assist the Owner in understanding the progressive design-build process and create a collaborative
environment that promotes transparency and robust communication. Combining the varied Gallatin programs into
one location will require that the Design-Build Team work closely with the College and its stakeholders to determine
space priority, the ability for programs to share flexible spaces, and possibly incorporating the use of outdoor spaces
into the design. The Design-Build Team will also examine the available spaces on the current MSU campus to
determine whether there are spaces that could be used for the Gallatin program. In addition, the design should
take into account the total cost of ownership, including efficient operations and maintenance.
Timely completion of the Project is essential, as the College is currently spread across several leased locations.
The Project needs to be completed in time for Gallatin College to re-locate the facility to be ready for student use
as soon as possible.
The College anticipates that the following programs will be re-located into the new facility. A more complete list is
set forth in this RFQ in Exhibit D. The list below is not final. The final scope will be developed collaboratively with
the selected Design-Build team:
State of Montana
MSU Gallatin College PDB
Request for Qualifications
© Progressive Design-Build Consulting, LLC
Page 2
• Carpentry
• CNC Machine Technology
• Design Drafting & Interior Design
• Heating, Ventilation, Air Conditioning and Refrigeration
• IT Cybersecurity & Networking
• Photonics & Laser Technology
• Welding Technology
• Other Program Considerations to Meet On-Demand Statewide Workforce Needs
• Develop adaptable spaces that can “flex” with changing workforce needs and allow Gallatin College MSU
to respond with training programs for students to be educated with desirable job skills.
2.2. Project Goals
The Owner has established the following Project Goals:
1.
Execute a successful, collaborative Progressive Design-Build (PDB) process to produce
the envisioned Project: The Design-Build Team will develop a highly collaborative relationship
with the Owner and its stakeholders, using effective and efficient management of stakeholder
input, so that the needs of the stakeholders are addressed within the Owner’s budget and
schedule. Additionally, MSU is interested in how the Design-Build team will incorporate student
engagement as it relates to the students who will be learning in this facility.
2.
Efficient Facility Design: The Design-Build Team will utilize their expertise in the design and
construction of collegiate trade education facilities to develop a creative and efficient design to
consolidate the identified Gallatin College’s locations into a highly visible facility that is fully
integrated into the MSU campus. The design will also be flexible to account for future growth of
the College into account, incorporate the Total Cost of Ownership, and comply with the Owner’s
Basic Requirements for State of Montana Projects.
3.
Transparent Pricing: The Design-Build Team will conduct a robust validation process and
provide transparent pricing that allows the Owner to track the cost of design and construction
concurrently so that the Owner is fully informed regarding the cost implications of design and other
project decisions and the design can be maximized within the Owner’s budget.
4.
Efficient Scheduling, Sequencing, and Construction Means and Methods: The Design-Build
Team will use efficient and effective scheduling, sequencing, and early incorporation of innovative
construction means and methods to achieve timely completion of the Project, develop an efficient
Project scope, and enhance the quality of the project to meet or exceed the High-Performance
Building Standards (available on the A&E Division website https://doa.mt.gov/ae/) or achieve
LEED Gold.
2.3. Form of Agreement
The Project will be contracted through a progressive design-build agreement that is attached as Exhibit A
to the RFQ. The Design-Build Team will work collaboratively with the Owner to establish a project scope,
Basis of Design Documents, and Guaranteed Maximum Price after the award of the Project. The Design-
Build Agreement will be a cost plus with a Guaranteed Maximum Price, modified version of the DBIA Form
530 Standard Form of Agreement Between Design-Builder and Owner with a modified version of the DBIA
Form 535 General Conditions of Agreement.
2.4. Project Budget
The budgeted cost for design and construction for this Project is up to $43,000,000 dollars.
2.5. Project Procurement Schedule
The following is the Project Procurement Schedule. The Owner reserves the right to modify the Project
Procurement Schedule via addenda issued prior to the date set forth below.
Date
June 8
State of Montana
MSU Gallatin College PDB
Request for Qualifications
© Progressive Design-Build Consulting, LLC
Activity
Issue RFQ
Page 3
June 17
June 22
June 29
July 8
July 20
July 20
August 6
August 14
August 21
August 28
September 14
September 23
Project Information Meeting
Last Date to Submit Questions Regarding the
RFQ
Last Date to Issue Owner Addenda
SOQ Due Date
Notification of Finalists
Issue RFP
Confidential Individual Meetings
Last Date to Ask Questions or Submit
Proposed Changes to Contract
Last Date to Issue Owner Addenda
Proposal Due Date
Interviews with Finalists (optional)
Notification of Highest Scored Finalist
2.6. Definitions
2.6.1
Business Day: Monday through Friday, with the exception of official holidays observed by the
Owner.
2.6.2
Confidential Individual Meetings: The confidential meeting(s) conducted individually between
the Owner and each Finalist after the issuance of the RFP. All Confidential Individual Meetings
will be conducted pursuant to the instructions in the procurement documents, and all participants
will be required to enter into a confidentiality agreement before the meeting.
2.6.3 Design-Builder: The entity with the prime design-build contract with the Owner.
2.6.4
Design-Build Team: The Design-Builder and the individuals and entities working for or
subcontracted to the Design-Builder or its subcontractors and subconsultants.
2.6.5
Design-Build Team Member: All entities listed by the Design-Builder as providing services or
construction on the project. Members of the Design-Build Team may also be referred to as “Team
Members”.
2.6.6
Finalist: A Proposer that has been selected in the shortlist to propose in the Request for
Proposals phase of the procurement.
2.6.7
Key Team Member: Individuals who will be assigned to the Project who play an important role
in the design, construction or management of the Project.
2.6.8 Montana Resident: Means a bona fide Montana resident as defined in MCA 18-2-401.
2.6.9 Procurement: The Owner’s process for selecting a Design-Build Team for this Project.
2.6.10 Procurement Documents: All documents issued by the Owner in connection with the
Procurement or Project.
2.6.11 Projects of Similar Scope and Complexity: Projects that had substantial completion dates
within the last seven (7) years and that have many or all of the following characteristics:
a.
Projects of a similar size, budget, and complexity that include design and construction of a
similar educational facility that primarily provides one or two year certificates or degrees,
including projects where the team provided a space analysis of current programs and
assistance with prioritizing the programs;
b.
Projects where the design-build team members created flexible spaces that successfully
took into account future uses;
State of Montana
MSU Gallatin College PDB
Request for Qualifications
© Progressive Design-Build Consulting, LLC
Page 4
c.
Projects that included an integrated team that achieved strong coordination and integration
of the design and construction professionals and early involvement of the construction
professionals during design and where the Design-Builder collaborated with the Owner and
its stakeholders to develop the final scope, schedule, and price without impacting the
budget or schedule;
d.
Projects with a limited budget where an owner ‘s goal is to maximize the available scope
within the budget and minimize operations and maintenance costs;
e.
Projects that implemented schedule efficiencies and successfully met an aggressive
project schedule;
f.
Projects where the design-build team members analyzed and provided sustainable options
to incorporate into the design, construction, and/or operation of the facility.
Projects of Similar Scope and Complexity do not need to meet all of the elements above. Proposers
are encouraged to explain the relevance of the projects cited in the SOQs and Proposals. The
Owner will determine the relevance of the projects cited and reserves the right to give more weight
to projects that have more of the above characteristics. Because a significant portion of the Project
will involve technical labs, including the welding and HVAC programs, the Owner reserves the right
to give more weight to projects that include those programs.
2.6.12 Proposer: An entity that submits a Statement of Qualifications in response to this RFQ.
2.6.13 RFQ: The Owner’s Request for Qualifications.
2.6.14 RFP: The Owner’s Request for Proposals, which will be issued to those Finalists who are selected
to proceed to the next phase of this Procurement.
2.6.15 SOQ: A Statement of Qualifications submitted in response to this RFQ.
2.6.16 Team Member is any entity (rather than individual) submitted with the Design-Builder’s team in
the SOQ.
SECTION 3
PROCUREMENT PROCESS
3.1. General Information
3.1.1.
Communication with the Owner. Proposers are required to conduct the preparation of their
SOQs with professional integrity and free of lobbying activities. Communication with the Owner
regarding this Project shall be via email or regular mail only and directed to the Owner’s Contact
Person. Do not communicate about the Project or the Procurement with any other Owner
employees, representatives, or consultants. Communication with other Owner employees,
representatives, or consultants regarding the Procurement may cause the firm involved to be
disqualified from submitting under this Procurement. Any verified allegation that a responding
Proposer or Team Member or an agent or consultant of the foregoing has made such contact or
attempted to influence the evaluation, scoring, and/or selection of Finalists may be the cause for
Owner to disqualify the Proposer team from submitting an SOQ or Proposal, to disqualify the Team
Member from participating in the Procurement and/or to discontinue any further consideration of
such Proposer or Team Member. Following the Owner’s approval of the Finalists, the Owner
anticipates that certain communications and contacts will be permitted. The RFQ, RFP and/or other
written communications from Owner will set forth the rules and parameters of such permitted
contacts and communications. To the extent any Proposer intends at any time to initiate contact
with the general public regarding the Project, the nature of such intended contact and the
substance thereof must be approved in writing by Owner prior to the commencement of such
activities.
3.1.2. Expenses of Proposer. The Owner accepts no liability for the costs and expenses incurred by
firms in responding to this Procurement.
a.
Each Proposer that enters into the Procurement process shall prepare the required
materials, the SOQ, and the Proposal at its own expense and with the express
understanding that the Proposer cannot make any claims whatsoever for reimbursement
from the Owner for the costs and expenses associated with the process even in the event
State of Montana
MSU Gallatin College PDB
Request for Qualifications
© Progressive Design-Build Consulting, LLC
Page 5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.