Main Wastewater Treatment Plant Oxygen Plant Rehabilitation

Location: California
Posted: Sep 18, 2024
Due: Oct 23, 2024
Agency: East Bay Municipal Utility District
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.

Main Wastewater Treatment Plant Oxygen Plant Rehabilitation

[Sign In] Current Construction Bid Opportunities
Title: Main Wastewater Treatment Plant Oxygen Plant Rehabilitation
Specification Number: SD428
Bid Walk: Tuesday, July 30, 2024, 9:00 AM
The District will conduct a MANDATORY pre-bid jobsite conference/inspection to familiarize prospective bidders with the project site and conditions. Bidders submitting a bid must attend the pre-bid conference for their bid to be responsive. Attendees will be required to sign a waiver prior to entering the plant site. See Appendix A for waiver. The pre-bid meeting will be conducted on July 30, 2024 at 9:00 a.m. Bidders/bid walk attendees (Attendees) shall assemble at 2020 Wake Avenue, Oakland, California 94607. This is the only time that the Oxygen Plant will be open for inspection. The conference/inspection will last approximately 2 hours. No photography by the Attendees will be allowed. The District will take photographs, as requested by the Attendees, restricted to the work zone. The District will release photographs to Attendees after the bid walk, pending review by District. All Attendees are required to have a photo ID and sign a confidentiality agreement not to share, sell, or publish photos.

The Prime Contractor and its subcontractors are strongly encouraged to attend the jobsite inspection where a "sign-in" sheet will be provided. Requirements of the District's Contract Equity Program, including the pilot Local Hire component, will be discussed and explained at the pre-bid meeting.
Project Engineer:
Bid Opening Date: Wednesday, October 23, 2024, 1:30 PM
Estimated Cost: $9,000,000 to $10,000,000
Description: Work includes demolition and replacement of motors, valves, instruments, controls, and other appurtenances associated with the cryogenic oxygen production facility at East Bay Municipal Utility District's Main Wastewater Treatment Plant (MWWTP). Existing pneumatic controls will be replaced with new electronic instruments and controls. The work also includes re-coating of existing steel cold boxes, new controls, integration of controls into the MWWTP's distributed controls system (DCS), fire protection, fall protection, seismic retrofit of panels, and all materials, equipment, services, and construction inherent to the Work.
Request a Bid Set
Notice to Contractors
Plan Holders List
Questions and Answers
Bid Walk Sign-In Sheet
Bid Walk Location Map
Bid Results
Addendum 1
Addendum 1 (unlocked)
Addendum 2
Addendum 2 (unlocked)
Pre Bid Conference PowerPoint
Specifications Volume I-A
Specifications Volume I-A (unlocked)
Specificatons Volume I-B
Specifications Volume I-B (unlocked)
Specifications Volume II-A
Specificatons Volume II-A (unlocked)
Specifications Volume II-B
Specifications Volume II-B (unlocked)
Plans Volume III
Plans Volume III (unlocked)
Plans Volume IV
Plans Volume IV (unlocked)
Specifications
Plans - PDF

For more
information, please contact the Specifications Section .
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.