| Location: | California |
|---|---|
| Posted: | May 7, 2025 |
| Due: | Jun 3, 2025 |
| Agency: | City of Alameda |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Clement Avenue / Tilden Way Improvement Project, P.W. No. 04-25-14.
The City of Alameda (“City”) will accept sealed bids for its Clement Avenue / Tilden Way Improvement Project, (“Project”) on before June 3, 2025, at 2:00 p.m., at the City’s Public Works Office, located at 950 West Mall Square, Suite 110, Alameda, CA 94501 at which time the bids will be publicly opened. No bids will be accepted unless submitted on the Bid Proposal and Schedule Form provided in the Project Manual.
The Project includes, but is not limited to, performing the following Work:
Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with the work to be performed under these specifications. The work to be performed includes, but is not limited to: mobilizing/demobilizing, traffic and pedestrian control, water pollution control, temporary construction staging, construction staking, removal of concrete, asphalt concrete pavement, and base, pavement markings, drainage facilities, fencing, railroad platforms, contaminated material, and railroad track and ties; clearing and grubbing, roadway excavation, adjusting utility covers to grade, concrete improvements including sidewalks, driveways, curb and gutters, and curb ramps; aggregate base, asphalt improvements; installing culverts, storm drains, bioswales, storm drains, sanitary sewers, thermoplastic striping and markings, signs, mulch, landscape planting, trees, irrigation, privacy fence, decomposed granite, park furnishing, traffic signal modification, lighting, and communication system.
This Project is situated on the following City streets:
- Tilden Way, between Buena Vista Avenue and Miller Sweeny Bridge
- Blanding Avenue, between Broadway and Tilden Way
- Broadway, between Tilden Way and Blanding Avenue
- Fernside Boulevard, between Tilden Way and Versailles Avenue.
Approximate cost of construction: $7.66 million
Printed or electronic copies of the plans, specifications, and contract documents, including the Project Manual, and/or any issued addenda may be obtained from BPX Printing & Graphics located at 4903 Central Avenue, Richmond, CA 94804 for a non-refundable cost of $140 per set, exclusive of shipping and handling. Copies of the documents may be viewed and ordered at https://www.alamedaplanroom.com/ or by contacting BPX at (510) 559-8299 or at Richmond@bpxprinting.com .
There will be no pre-bid meeting for this Project. There is a non-mandatory Pre-Bid Meeting scheduled for May 19, 2025 at 10:00am.
Prospective bidders will meet virtually on Microsoft Teams (Meeting ID: 211 537 609 724 4 , Passcode: go7hX3AU )
A sign-in sheet will be issued, and shared, to record attendees.
Contact Ali Hatefi at
ahatefi@alamedaca.gov
for more information.
Questions about interpretation of contract documents must be submitted in writing on or before 12:00 PM on May 21. 2025.
Virtual Meeting on Microsoft Teams
May 19, 2025, 10:00am
Meeting ID:
211 537 609 724 4
Passcode:
go7hX3AU
Tuesday, June 3, 2025
2:00 p.m.
Public Works Office
950 West Mall Square Suite 110
Alameda, CA 94501
Ali Hatefi at ahatefi@alamedaca.gov
Questions must be submitted in writing on or before 12:00 pm on May 21st

With GovernmentContracts, you can:
...including survey staking, traffic control, coordination with various public agencies including Caltrans, and ...
City of Oakland
Bid Due: 7/02/2026