| Location: | Minnesota |
|---|---|
| Posted: | May 30, 2025 |
| Due: | Jun 16, 2025 |
| Agency: | State Government of Minnesota |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Brief Description: MnDOT requests letters of interest to complete a corridor study. The purpose of this corridor study is to complete an assessment of the Trunk Highway progress on the District 4 ADA transition plan, make recommendations on intersection safety improvements at the north and south junctions of US 75 and TH 210 as well as along TH 9, TH 210, and TH 75. This study will assess the ADA needs, local needs for utilities, traffic operations, bike/pedestrian accommodations, safety, future developments, and intersection safety improvements, environmental considerations to ADA in the pre-design of future projects, and ADA needs to accomplish the districts progress on the current ADA transition plan adopted by the district. The goal of this project is to assess access management, intersection safety improvements and ADA transition needs in Breckenridge.
Date posted:05/30/2025
Due date: 06/16/2025

With GovernmentContracts, you can:
...Environmental Studies 5.2 Air Quality Analysis 5.3 Noise Analysis & Abatement Design 5.4 ...
State Government of Minnesota
Bid Due: 6/25/2026
...5.0 Environmental Studies 5.2 Air Quality Analysis 5.3 Noise Analysis & Abatement Design ...
State Government of Minnesota
Bid Due: 6/25/2026
...and Environmental Linkage (PEL) Study it determined the primary purpose and need for ...
State Government of Minnesota
Bid Due: 6/23/2026
...and Environmental Linkage (PEL) Study it determined the primary purpose and need for ...
State Government of Minnesota
Bid Due: 6/23/2026