| Location: | California |
|---|---|
| Posted: | Mar 17, 2025 |
| Due: | Apr 10, 2025 |
| Agency: | Ventura County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RD25-09 |
| Publication URL: | To access bid details, please log in. |
Project Description: Construction of sidewalk and buffered bike lanes on the eastern side of Ventura Avenue, along with curb ramps for pedestrian safety, and drainage improvements. Work includes Potholing, Roadway Preparation, Tree Removal, Chain Link Fence, Drive Gate, Removal of Existing Structures, Crushed Miscellaneous Base, PCC Curb and Gutter, Curb Drain, PCC Sidewalk, PCC Driveway Approach, PCC Cross Gutter, PCC Curb Ramps, Minor Concrete, Earthen Swale, Reinforced Concrete Pipe, Storm Drain Manhole, Curb Opening Catch Basin, Drop Inlet for Concrete Pipe, Surface Preparation & Crack Treatment, Tack Coat, Mill & Fill, AC Widening, AC Miscellaneous Paving, Type II Emulsion-Aggregate Slurry, Roadside Mailbox, Pavement Delineation, Striping & Signing, and appurtenant work

With GovernmentContracts, you can:
...preparation and crack seal/fill, pavement delineation striping and signing, constructing asphalt berms..., surface ...
City of Mailbu
Bid Due: 6/18/2026
...preparation and crack seal/fill, pavement delineation striping and signing, constructing asphalt berms..., surface ...
City of Malibu
Bid Due: 6/18/2026