Edison High School CTE Shade
Structure Project #26-21
STOCKTON UNIFIED SCHOOL DISTRICT
June 10, 2026
STOCKTON UNIFIED SCHOOL DISTRICT
TITLE PAGE
DOCUMENT 00 01 01-1
Edison High School – Shade Structure Project
STOCKTON UNIFIED SCHOOL DISTRICT
DOCUMENT 00 01 10 - TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
Division 0
Document
00 01 10
00 01 20
Title
Signature Page
Table of Contents (This Document)
List of Schedules
SOLICITATION
00 11 16
Notice to Bidders
INSTRUCTIONS FOR PROCUREMENT
00 21 13 Instructions to Bidders
00 21 13.1 Bidder Information and Forms
AVAILABLE INFORMATION
00 31 19
00 31 32
Existing Conditions (NOT part of the Contract Documents)
Geotechnical Data
PROCUREMENT FORMS AND SUPPLEMENTS
00 41 13 Bid Form and Proposal
00 43 13 Bid Bond
00 43 36 Designated Subcontractors List
00 45 01 Site-Visit Certification
00 45 19 Non-collusion Declaration
00 45 19.01 Iran Contracting Act Certification
00 45 19.02 Off-Road Diesel-Fueled Fleet Certification
00 45 26 Worker’s Compensation Certification
00 45 46.01 Prevailing Wage and Related Labor Requirements Certification
00 45 46.02 Disabled Veteran Business Enterprise Participation Certification
00 45 46.03 Drug-Free Workplace Certification
00 45 46.04 Tobacco-Free Environment Certification
00 45 46.05 Drug and Alcohol-Free Schools Certification
00 45 46.06 Workplace Violence Prevention Plan Certification
00 45 46.07 Hazardous Materials Certification
00 45 46.08 Lead-Based Materials Certification
00 45 46.09 Imported Materials Certification
00 45 46.10 Criminal Background Investigation/Fingerprinting Certification
00 45 46.11 Roofing Project Certification – Not applicable
00 45 49 Registered Subcontractors List
00 45 90 Post Bid Interview
CONTRACTING FORMS AND SUPPLEMENTS
00 51 00 Notice of Award
00 52 13 Agreement
00 55 00 Notice to Proceed
00 56 00 Escrow of Bid Documentation
00 57 00 Escrow Agreement in Lieu of Retention
PROJECT FORMS
00 61 13.13 Performance Bond
STOCKTON UNIFIED SCHOOL DISTRICT
2022-22
06/26
TABLE OF CONTENTS
DOCUMENT 00 01 10- 1
Edison High School – Shade Structure Project
STOCKTON UNIFIED SCHOOL DISTRICT
00 61 13.16
00 63 40
00 63 47
00 63 57
00 63 63
00 65 19.26
00 65 36
Payment Bond (Contractor’s Labor and Material Bond)
Allowance Expenditure Directive Form
Daily Force Account Report
Proposed Change Order Form
Change Order Form
Agreement and Release of Any and All Claims
Guarantee Form
2022-22
06/26
CONDITIONS OF THE CONTRACT
00 72 13 General Conditions
00 73 13 Special Conditions
00 73 56 Hazardous Material Procedures and Requirements
SPECIFICATIONS – GENERAL REQUIREMENTS
Division 01
Document
01 11 00
01 21 00
01 25 13
01 26 00
01 29 00
01 31 19
01 32 13
01 33 00
01 35 13.23
01 41 00
01 42 00
01 42 13
01 42 16
01 42 19
01 43 00
01 45 00
DSA 103-22
01 50 00
01 50 13
01 52 13
01 64 00
01 66 00
01 71 23
01 73 29
01 76 00
01 77 00
01 78 23
01 78 36
01 78 39
01 79 00
Title
Summary of Work
Allowance
Product Options and Substitutions
Changes is the Work
Application for Payment and Conditional and Unconditional Waiver and Release Forms
Project Meetings
Scheduling of Work
Submittals
Site Standards
Regulatory Requirements
Definitions and Standards
Abbreviations and Acronyms
Definitions
References
Materials and Equipment
Quality Control
Listing of Structural Test & Special Inspections, 2022 CBC
Construction Facilities and Temp Controls
Construction Waste Management and Disposal
Field Offices
Owner-Furnished Products
Product Delivery, Storage and Handling
Field Engineering
Cutting and Patching
Alteration Project Procedures
Contract Closeout and Final Cleaning
Operation and Maintenance Data
Warranties
Record Documents
Demonstration and Training
TECHNICAL SPECIFICATIONS
Section
Division 2
EXISTING CONDITIONS
STOCKTON UNIFIED SCHOOL DISTRICT
TABLE OF CONTENTS
DOCUMENT 00 01 10- 2
Edison High School – Shade Structure Project
STOCKTON UNIFIED SCHOOL DISTRICT
02 41 19 Selective Structure Demolition
Division 3
03 30 00
CONCRETE
Cast-in-Place Concrete
Division 5
05 50 00
METALS
Metal Fabrications
Division 7
07 51 13.10
07 62 00
07 72 00
07 92 00
THERMAL AND MOISTURE PROTECTION
BUR over LWIC
Sheet Metal Flashing and Trim
Roof Accessories
Joint Sealants
Division 8
08 33 23
OPENINGS
Overhead Coiling Doors
Division 9
09 91 00
FINISHES
Painting and Finishing
Division 10
10 14 00
10 28 00
SPECIALTIES
Signage and Graphics
Toilet, Bath, and Laundry Accessories
Division 11
11 05 13
EQUIPMENT
Common motor requirements for equipment
Division 21
21 00 00
21 05 00
21 05 53
21 13 00
FIRE SUPPRESSION
Basic Fire Protection Requirements
Common Work Results for Fire Suppression
Identification of Fire Suppression Piping and Equipment
Fire Suppression Sprinkler Systems
Division 23
23 05 10
23 05 53
23 05 93
23 07 19
23 09 33
23 23 00
23 31 00
23 37 00
23 40 00
23 74 15
HVAC
Mechanical General Provisions
Identification for Fire Suppression Piping and Equipment
Testing, Adjusting, and Balancing for HVAC
HVAC Piping Insulation
Facility Management System
Refrigeration, Piping, and Accessories
HVAC Ducts and Casings
Air Inlets and Outlets
HVAC Air Cleaning Devices
Packaged Rooftop Heat Pump Units
Division 31
EARTHWORK
Division 32
32 13 73
32 31 13
EXTERIOR IMPROVEMENTS
Concrete Pavement Joint Sealants
Chain-Link Fencing
STOCKTON UNIFIED SCHOOL DISTRICT
2022-22
06/26
TABLE OF CONTENTS
DOCUMENT 00 01 10- 3
Edison High School – Shade Structure Project
STOCKTON UNIFIED SCHOOL DISTRICT
DOCUMENT 00 01 20
LIST OF SCHEDULES
SCHEDULES
• 6/11/26 - First advertisement
• 6/15/26 - Second advertisement
• 6/17/26 – Mandatory Job/Site Walk
• 6/22/26 - Pre-Bid RFI's due by 2:00 PM
• 6/24/26 – Addendum Issued
• 6/30/26 - Bid Open at Facilities Department 2:00 PM
• 7/02/26 - Board Items Due Date
• 7/21/26 - Board Meeting Date
END OF DOCUMENT
2022-22
06/26
STOCKTON UNIFIED SCHOOL DISTRICT
SCHEDULES
DOCUMENT 00 01 20-4