RFQ - Flooring Services Cost Sheet

Location: Tennessee
Posted: Apr 30, 2026
Due: May 26, 2026
Agency: Tennessee Tech University
Type of Government: State & Local
Category:
  • 65 - Medical, Dental, and Veterinary Equipment and Supplies
  • N - Installation of Equipment
  • R - Professional, Administrative and Management Support Services
  • S - Utilities and Training Services
Publication URL: To access bid details, please log in.
Due Date Description Purchasing Contact

5/26/2026

RFQ - Flooring Services

Cost Sheet

Tina Girdley

Attachment Preview

Note: The Percentage of Work listed below are estimates ONLY do not a guarantee of work.
Item Number % of Work Description Unit of Measure Unit Cost
1-500 501-2000 2001+
1 5 Removal of Existing Resilient Tile (Non-asbestos) sq. ft.
2 5 Removal of Existing Base linear ft.
3 3 Floor Preparation ** sq. ft.
4 1 Provide moisture testing for slab*** each
5 5 Installation of New Vinyl Composition Tile* sq. ft.
6 10 Installation of New Luxury Vinyl Tile or Vinyl Plank* sq. ft.
7 10 Installation of New Linoleum Tile* sq. ft.
8 2 Installation of New Linoleum or Vinyl Sheet Goods* sq. ft.
9 1 Heat welding seams in sheet good products linear ft.
10 15 Installation of standard 4" Rubber Base linear ft.
11 2 Installation of specialty or Millwork Rubber Base 6" max. ht. linear ft.
12 2 Installation of Transition Strips linear ft.
13 5 Installation of New Broadloom Jute or Action Back**** sq. ft.
14 5 Installation of New Carpet Tile sq. ft.
15 2 Installation of Quarter Round or Shoe Mold linear ft.
16 2 Removal of Quarter Round or Shoe Mold linear ft.
17 5 Removal of Existing Carpet sq. ft.
18 10 Skilled Labor hourly
19 10 Unskilled Labor hourly

Bid Cost Sheet
Note: The Percentage of Work listed below are estimates ONLY do not a guarantee of work.
Item
% of Work Description Unit of Measure Unit Cost
Number
1-500 501-2000 2001+
1 5 Removal of Existing Resilient Tile (Non-asbestos) sq. ft.
2 5 Removal of Existing Base linear ft.
3 3 Floor Preparation ** sq. ft.
4 1 Provide moisture testing for slab*** each
5 5 Installation of New Vinyl Composition Tile* sq. ft.
6 10 Installation of New Luxury Vinyl Tile or Vinyl Plank* sq. ft.
7 10 Installation of New Linoleum Tile* sq. ft.
8 2 Installation of New Linoleum or Vinyl Sheet Goods* sq. ft.
9 1 Heat welding seams in sheet good products linear ft.
10 15 Installation of standard 4" Rubber Base linear ft.
11 2 Installation of specialty or Millwork Rubber Base 6" max. ht. linear ft.
12 2 Installation of Transition Strips linear ft.
13 5 Installation of New Broadloom Jute or Action Back**** sq. ft.
14 5 Installation of New Carpet Tile sq. ft.
15 2 Installation of Quarter Round or Shoe Mold linear ft.
16 2 Removal of Quarter Round or Shoe Mold linear ft.
17 5 Removal of Existing Carpet sq. ft.
18 10 Skilled Labor hourly
19 10 Unskilled Labor hourly
* Unit pricing shall include basic pattern work that uses multiple colors. Bid prices includes cutting and installing tile into doorways and niches as required. Bid prices does
not include graphics, logos, or intricate patterns which will be billed hourly to be pre-approved by the appropriate Tennessee Tech personnel in writing. All flooring
installations shall be warrantied for workmanship and installation for a minimum of one (1) year from date of install.
** Floor preparation may include floor leveling, skimming, grinding, etc., rountine sweeping and vacuuming shall not be considered floor preparation and shall be included in
the installation unit pricing. Any additional floor prep shall be approved by the Project Manager prior to commencement of work.
*** Moisture tests to be provided and implemented by Contractor upon request by Tennessee Tech.
**** The above rates should include the cutting and transporting of new carpet to the installation site and the return of any remnants (as applicable), adhesives, base, etc. to
Tennessee Tech warehouse facility
Note: Square footage pricing is for actual square footage measurement of the room or space, not the quanitity of materials provided. Overages will be provided in material
supplied by Tennessee Tech. Remaining materials should be returned to the warehouse after completion of the installation.

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Event 32913-13962 Terms and Conditions Specifications 07/21/2026 08/19/2026 UPS Replacement

State Government of Tennessee

Bid Due: 8/19/2026

Project: Region 3 New Rutherford County Maintenance Complex Region 3 - Middle TN

State Government of Tennessee

Bid Due: 8/20/2026

Project: Davy Crockett Tower - Elevator Replacement Davy Crockett Tower Nashville, Davidson County,

State Government of Tennessee

Bid Due: 8/20/2026

Document ID & Hyperlink: Solicitation Notice 34320-20827 Event Start - Response Due: 07/23/2026

State Government of Tennessee

Bid Due: 9/03/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.