| Location: | Florida |
|---|---|
| Posted: | Sep 2, 2026 |
| Due: | Sep 17, 2026 |
| Agency: | Escambia County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PD 25-26.114 |
| Publication URL: | To access bid details, please log in. |
Project ID: PD 25-26.114
Title: Boiler Replacement - MC Blanchard Judicial Building - Equipment Only
Addenda: 1
Release Date: 9/2/2026
Due Date: 9/17/2026
The procurement is an advanced equipment package purchase for the replacement of multiple non-operational boilers and pump equipment. This is an equipment purchase ONLY. The equipment should be delivered to Escambia County Facilities Management 100 E. Blount Street, Pensacola, FL 32501.
The non-operational equipment is beyond life expectancy and needs immediate replacement. Although the installation of this equipment is in the professional design phase, the County is seeking to advance purchase the equipment in order to time delivery with installation scheduled to be complete prior to November 15, 2026.
The design for this project is based on AERCO BENCHMARK 3000 Low NOx Boilers (natural gas fired) and TACO KS3007 vertical inline Pumps. New boiler equipment to match existing equipment at downtown Governmental Complex installed in 2026.

With GovernmentContracts, you can:
...Description: Gleneagles Aquatic Center - Pool Heat Pump Installation Department: Facilities...
Palm Beach County
Bid Due: 7/06/2030
...internal components, structural repairs, installation of new pump bases, replacement of interior piping... ...
City of Flagler Beach
Bid Due: 9/30/2026
...October 13, 2026 2:00 PM I.Q. 511 RECLAIMED WATER PUMP STATION - LIGHTNING ...
Loxahatchee River District
Bid Due: 10/13/2026
...Centrifugal pump maintenance or repair service 72154110 Fin fan cooling tower maintenance and ...
State Government of Florida
Bid Due: 9/30/2026