| Location: | Illinois |
|---|---|
| Posted: | Sep 8, 2025 |
| Due: | Oct 6, 2025 |
| Agency: | ENERGY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | KRS-369604-JK |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
On 9/8/25, Amendment 01 was issued to revise the Subcontractor Annual Representations & Certifications (SARC) form to Rev. 4 and to extend the questions due date and proposal due date. Questions are now due 4pm CT on September 16, 2025. Proposals are now due 4pm CT on October 6, 2025. See attached files for more information.
The selected Subcontractor shall provide all labor, materials, tools, equipment, and supervision required to provide the Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear, as delineated in the attached specification and drawings. The selected Subcontractor shall deliver the prefabricated control house building in compliance with all requirements in the specification and drawings documents, in accordance with the required quality assurance plan and subject to the specified acceptance criteria.
| Aug 29, 2025 | [Solicitation (Original)] Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear |
| Sep 16, 2025 | [Solicitation (Updated)] Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear |
| Sep 25, 2025 | [Solicitation (Updated)] Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear |
| Oct 3, 2025 | [Solicitation (Updated)] Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear |
| Oct 8, 2025 | [Solicitation (Updated)] Kautz Road Substation Replacement Prefabricated Control House Building and associated Arc Safe 13.8kV Medium Voltage Switchgear |

With GovernmentContracts, you can:
Bid Title: Concrete Replacement RFQ Category: Construction Projects Status: Open Description: This project
City of Rock Island
Bid Due: 7/24/2026
Bid Title: Tuckpointing, Power Washing, and Sealant RFQ Category: Construction Projects Status: Open
City of Rock Island
Bid Due: 7/24/2026
Opens June 9 - North Merchant Street Reconstruction Project Phase 2 - Plan
Effingham city
Bid Due: 6/09/2026
Number Name Posted Date Opening Date View UE27-03-14 CCR Surface Impoundment Dewatering Well
City of Springfield
Bid Due: 6/25/2026