ROAD & BRIDGE DEPARTMENT
RYAN RIGHETTI, ROAD SUPERINTENDENT
Requests for Proposals (RFP) for 2026 Road Striping
San Miguel County, CO
San Miguel County will be accepting bids to provide the following products beginning in the
summer of 2026.
District 1 – Telluride
• Painting the following roads X48(1.9 miles), 57P (2.4 miles), 63L (2.2 miles), T60
(2.3miles) D65 (.5 miles) K69 (.4 miles), Traffic Control
o Paint stripe approximately 180,112’ 4” double yellow and 4” edge lines
o White Stop Bars 240 sq. ft.
o Placerville 4” 200’ double yellow and 4”1,200’ white single line
(SPRING/FALL)
o Ski Ranches (Fox Farm) stripe double yellow/white edge (976”) one stop bar
60 sq. ft.
District 2 - Norwood
• Painting the following county roads AA42/42ZN Traffic Control
o Paint stripe approximately 19,693’ 4” double and 4” edge lines
District 3 - Egnar
• Painting the following county roads H1 (5.5 miles) Egnar Traffic Control (FALL
2026)
o Paint stripe approximately 116,160’ 4” double yellow and 4” edge lines
Please submit bids no later than March 23, 2026. A detailed schedule will be
arranged with the successful bidder but application is expected to begin in the
summer of 2026.
Please contact me at (970)327-4835 if you have any questions. Thank you.