| Location: | Utah |
|---|---|
| Posted: | Dec 18, 2025 |
| Due: | Jan 29, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PR2025001018 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Work generally includes, but is not limited to, the following: Work consists of construction of a new potable water well pump house at the existing Columbia Lane Tank site. The well house shall consist of but not limited to a masonry structure, with a standing seam metal roof, a 500 HP motor, 4,000 gpm vertical turbine pump with a piping, valves, flow meter, bladder style surge tank, gas chlorination system, HVAC, electrical systems, including a natural gas emergency backup generator, control panels, sitework with grading, storm drain system, asphalt paving, and site restoration.

With GovernmentContracts, you can: