| Location: | New York |
|---|---|
| Posted: | May 19, 2025 |
| Due: | Jun 10, 2025 |
| Agency: | The New York State Contract Reporter |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Description: The State University of New York at SUNY Old Westbury will receive sealed bids for project number SOW05012025 titled Media Innovation Center Renovation until 2 p.m. local time on June 10, 2025, at SUNY Old Westbury, Campus Center, H-311, 223 Store Hill Rd., Old Westbury, NY 11568, where such proposals will be publicly opened and read aloud. All work on this Contract is to be completed within/by September 2025. Complete sets of Contract Documents for bidding may be obtained from the NYSCR website or procurement@oldwestbury.edu
Procurement Calendar: NYSCR Advertisement Published: Thursday 05/19/2025 Mandatory Site Walk: Wednesday 05/27/2025 at 10:30am at Campus Center, MIC (Rm G114) Bidders’ Questions Due By: Friday 05/30/2025, 5pm College Responses Due By: Wednesday 06/04/2025 Bids Due By: Tuesday 06/10/2025 2PM EST
A Mandatory Site Walkthrough will occur on Wednesday 05/27/2025 at 10:30am meeting at Campus Center outside of Rm G114. It is the policy of the State of New York and the State University of New York to encourage minority business enterprise participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy. The State University of New York reserves the right to reject any or all bids. This is a Prevailing Wage Rate job & PRC# 2025005121 has been assigned to this project. _____________________________________________________________________
Division 1 - General Requirements SECTION A - Description of Work
Job Title: Media Innovation Center Renovation The work to be done under the Contract, in accordance with the Contract Documents, consists of performing, installing, furnishing and supplying all materials, equipment, labor and incidentals necessary or convenient for the construction of Project Number SOW04302025 , titled Media Innovation Center Project and carry out all of the duties and obligations imposed upon the Contractor by the Contract Documents.
Part I New windows are to match existing windows in “I” Wing north first floor in construction, glass, operation, screens and color (white). Existing must be observed and details noted by vender upon mandatory bid walk. Additionally, new windows in “E” Wing are to be spaced such that they coincide with vertical exterior panel joints. Shop drawings and material submittal must be approved before material purchase.
Install exterior windows in 3 rooms in the Campus Center Building, Media Innovation Center rooms G114, G115, G124. This will include cutting holes in an exterior wall. The window in Room G114 has a rough opening of 55” x 88” this could be one window or 2 windows. Windows are to be double pane and openable to allow for air flow. Room G115 has a rough opening of 55” x 84” this could be one window or 2 windows. Windows are to be double pane and openable to allow for air flow. Room G124 has a rough opening of 65” x 214” this could be one window or multiple windows. Windows are to be double pane and openable to allow for air flow.
Part II Sound proofing Rooms G114, G118, G125, G126, the project is in the Campus Center Building, Media Innovation Center. The sound proofing goes as follows:
Room G114 – Office – Sound proofing needed wall opposite door floor to ceiling Room G118 – Studio B – 3 walls (Not Door and Window Wall) Floor to Ceiling Room G125 – Studio A – 4 walls Floor to ceiling Room G126 – Edit Studio – each one of the small rooms A-E 3 walls (not door wall) Floor to Ceiling Room G119 – Brick wall needs sound proofing The Type of Sound Proofing is Grey Form other types of Sound proofing will be discussed during the visit
Part III Media Innovation Center Room G125 (Studio A) to Epoxy paint Flat Black only on Cement floor. The floor will need cleaning and minor repair work The size of the floor is 47.5 feet x 31’ feet
Schedule: All Work to be done through completion June 2025 to August 2025 Contactors provide a preliminary schedule for lead time of all main materials with their bid.
Work Not Included: Work not included in the work of the Contract are those items marked "N.I.C"; movable furnishings, except those specifically specified or indicated on the Drawings; and items marked "by others".
Due Date: 06/10/2025 2:00 PM Contract Term: N/A Location: Campus Center, Media Innovation Center Ad Type: General
|