| Location: | Federal |
|---|---|
| Posted: | Feb 20, 2025 |
| Due: | Mar 7, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA8525-25-R-B006 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Government is conducting market research to identify potential sources that have the knowledge and experience to provide System Integration Lab (SIL) in support of the C-5M fleet. This effort would require up to SECRET security clearance.
These services include but not limited, ensuring the SIL/s are maintained and configurable to support all fielded C-5 AMP/RERP modified aircraft. This includes a mix of real hardware and software simulations to provide the Government support for DR investigations, Aircraft test support, LRU test support and software development testing. The SIL must be available on-demand to support 80 hours of operation per thirty (30) day calendar period (within the constraints of one shift during the normal five-day workweek). The Contractor shall provide the Government and other contractors supporting C-5 aircraft systems that interface with or support the C-5 avionics suite impacted by the C-5M software configurations access to their facility as well as the use of test venues and associated SIL equipment.
There is no foreign participation required in this effort.
The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor’s facility.
Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey.
Part I. Business Information
Please provide the following business information for your company/institution and for any teaming or joint venture partners:
Based on the Government proposed NAICS Code, state whether your company is:
Responses to the Capability Survey Part I and Part II must be received by March 7th, 2025 at 5pm Eastern Standard Time in accordance with the instructions above. Please ensure data is in a readable electronic format that can be received through a firewall. Attachments shall not exceed 10 MB per email. Multiple emails are acceptable. Responses must be sent via email to the following:
Contracting Point of Contacts (POCs)
Requirements Point of Contacts (POCs):
Part II. Capability Survey Questions
A. General Capability Questions:
B. Commerciality Questions:

With GovernmentContracts, you can: