Agency: | |
---|---|
State: | Arkansas |
Type of Government: | Federal |
Category: |
|
Posted: | Jan 25, 2024 |
Due: | Feb 22, 2024 |
Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
FY24 Civil Works Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock Air Force Base (LRAFB) for maintenance and repair components on civil works construction projects in support of the 19th Civil Engineer Squadron (19 CES). Construction projects to be performed under this Civil Works IDIQ include, but are not limited to, demolition of concrete, asphalt and various structures, concrete work, architectural barriers act (ABA) ramps, handrails, and site work, exterior electrical lighting, service and feeders, concrete joint sealant, asphalt maintenance, landscape establishment, bollard installation, water and gas utility line adjustments, valve, meter, and hydrants adjustments, asphalt construction, asphalt cold milling, roadway maintenance of traffic and traffic control devices, pavement markings and signage, culvert installation, modifications, and safety end sections, drop inlet, curb inlet, junction box repairs, adjustments, installations and modifications, underdrain installation, concrete steps and sidewalks, and traffic detection loop installation and repair. Types of site work may include excavation to grade, grading, compacting, various materials, clearing and grubbing, selective tree cutting, and demolition. Work may also include design/build from concept to full 100% design. Inhouse design capability or ready access to design capability is a must for projects under this IDIQ. Description of work will be identified in each individual task order. Individual task orders may require the project to be completed in multiple phases in order to facilitate base operations.
Pre-prosoal site visits will be held on 30 Jan 2024 at 10:00 AM and 01 Feb 2024 at 2:00 PM. All questions shall be submitted no later than 6 Feb 2024 at 1:00 PM CDT. No further questions will be accepted after this date and time.
With GovernmentContracts, you can:
...operations, buy may not include cabinet and housings, overlays, painting, trim decorations, and ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 5/17/2024
...concession building with plaza, three lighted ball fields, access drives, parking lot paving, ...
Arkansas Democrat-Gazette
Bid Due: 6/06/2024