HVAC Equipment Replacement, Memphis

Agency: AGRICULTURE, DEPARTMENT OF
State: Tennessee
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Posted: May 25, 2023
Due: Jun 8, 2023
Solicitation No: 12639523R0014
Publication URL: To access bid details, please log in.
Follow
HVAC Equipment Replacement, Memphis
Active
Contract Opportunity
Notice ID
12639523R0014
Related Notice
12639523R0014
Department/Ind. Agency
AGRICULTURE, DEPARTMENT OF
Sub-tier
ANIMAL AND PLANT HEALTH INSPECTION SERVICE
Office
MRPBS MINNEAPOLIS MN
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
  • Updated Published Date: May 25, 2023 02:14 pm CDT
  • Original Published Date: Apr 25, 2023 01:32 pm CDT
  • Updated Date Offers Due: Jun 08, 2023 12:00 pm CDT
  • Original Date Offers Due: May 25, 2023 10:00 am CDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Jul 08, 2023
  • Original Inactive Date: Jun 09, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Y1AA - CONSTRUCTION OF OFFICE BUILDINGS
  • NAICS Code:
    • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • Place of Performance:
    Bartlett , TN 38133
    USA
Description View Changes

The USDA AMS Cotton and Tobacco Program wishes to replace certain equipment within their Headquarters building at 3275 Appling Road in Memphis, Tennessee. The list of equipment is tabulated in the attached Proposal Package Schedule. Also attached to the solicitation are bid forms describing each bid package in detail, including mechanical, plumbing, and electrical work associated with each item of equipment (attachment 6). Generally, the scope will include labor, materials, equipment, and associated electrical work to install and commission the equipment in place, and to connect it to the existing Seimens Building Automation System.



The chiller equipment (one, two or three 200 NET ton capacity chillers) will be procured on a life cycle cost basis. Each offeror shall provide multiple selections of various equipment manufacturers (Carrier, Daikin, Trane, York), and will be asked to list on the bid form the following information for each proposal package designation: total first cost to install each option, and IPLV efficiency of the chiller at ARI 550 conditions. The life cycle cost of ownership of the chiller, including first cost, energy cost, and maintenance cost will be calculated over the 20-year life of the chiller. Lead times from release of order to jobsite arrival shall be listed on the bid form. For each chiller, and each manufacturer, submit costs for the shortest lead time chiller, the lowest cost chiller, the most efficient chiller, and the best combination of the above criteria. Each manufacturer may submit four selections meeting this criterion. Offerors shall include all options corresponding to the proposal package schedule attached. All selections shall meet the capacities in the construction documents and shall be installed in accordance with the drawings and specifications. Award of proposal packages will be based on life-cycle cost, and delivery time.



Other items to be procured include one, two or three 2821 MBH output 15 psig steam/natural gas boilers (selection based on weighted first cost, efficiency, and lead time); a single plate frame heat exchanger; one, two or three net 200-ton cooling towers; and one or two 40-50 HP 125 psig air compressors with refrigerated air dryers.



Offerors are asked to submit selections (submittal and performance data) for all equipment proposed for evaluation based on the selection criteria. Selection criteria are included in the solicitation documents. Each proposal package will be submitted per item of equipment. For example, Offer Package 1A-2 would include the total cost to install two chillers having the manufacturer’s shortest lead time, with the IPLV, annual maintenance cost, and lead time, along with full submittal including performance, weights, dimensions, electrical data, and specifications for the unit.



Solicitation and attachments are posted below.



Amendment 0001 posted below.



Amendment 0002 and the site visit attendance sheet are posted below.



Amendment 0003 documents are posted below.



In response to questions received from an interested vendor:



- As-built drawings are not available.



- A permit is not expected to be required for this project.



Amendment 0004 is posted below.



Amendment 0005 is posted below.


Attachments/Links
Contact Information View Changes
Contracting Office Address
  • 250 MARQUETTE AVENUE SUITE 410
  • MINNEAPOLIS , MN 55401
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Mar 23, 2023[Presolicitation (Original)] HVAC Equipment Replacement, Memphis
Apr 25, 2023[Solicitation (Original)] HVAC Equipment Replacement, Memphis
Apr 27, 2023[Solicitation (Updated)] HVAC Equipment Replacement, Memphis
May 15, 2023[Solicitation (Updated)] HVAC Equipment Replacement, Memphis
May 19, 2023[Solicitation (Updated)] HVAC Equipment Replacement, Memphis
May 25, 2023[Solicitation (Updated)] HVAC Equipment Replacement, Memphis
Jun 2, 2023[Solicitation (Updated)] HVAC Equipment Replacement, Memphis
Jun 8, 2023[Solicitation (Updated)] HVAC Equipment Replacement, Memphis
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

RFP 6730 Original Documentation: Website Redesign for the Johnson City MTPO Submittals due

City of Johnson City

Bid Due: 10/01/2024

ITB 6739 Original Documentation: Sale of Holston Property ITB_6739_Holston_Building_pics_1.pdf ITB_6739_Holston_Building_pics_2.pdf Submittals are due

City of Johnson City

Bid Due: 5/01/2024

ITQ 2023-28 Original Documentation: 52KW Standby Generator Submittals are due by 2:00 PM

City of Johnson City

Bid Due: 12/01/2024

ITQ# 2024-05 Original Documentation: INSTALL ASPHALT PAVEMENT WALKING PATH Submittals Due by Thursday

City of Johnson City

Bid Due: 7/03/2024

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.